White House Aero-Hit-List #2: Combat Search And Rescue (CSAR-X) Helicopter | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Monday

Tuesday

Wednesday

Thursday

Friday

Airborne On ANN

Airborne 11.28.16

Airborne 11.29.16

Airborne 11.30.16

Airborne 12.01.16

Airborne 12.02.16

Airborne Hi-Def On YouTube

Airborne 11.28.16

Airborne 11.29.16

Airborne 11.30.16

Airborne 12.01.16

Airborne 12.02.16

Fri, May 08, 2009

White House Aero-Hit-List #2: Combat Search And Rescue (CSAR-X) Helicopter

$17 Billion Cut... But Trillions More Spent Elsewhere

The Obama Administration, in the process of spending trillions of dollars for all manner of programs and projects, is trumpeted the 17 Billion dollars it is trying to cut from the Federal Budget. Rather than try to digest them all en masse, we'll look at each of them one at a time and allow you to make up YOUR mind as to the rationale and wisdom for the decisions included below. Herewith; another of the programs on the chopping block that has an aviation or aerospace connotation.

From the 'Terminations, Reductions, and Savings' document published this week by the OMB, as part of the FY 2010 US Budget:

Proposal: The Administration proposes to terminate the Air Force Combat Search and Rescue (CSAR-X) Helicopter Program because of problems with contracting, high costs, and questions about the need for an aircraft solely devoted to this purpose when multi-purpose aircraft are available.

Justification: The Department of Defense is questioning the need for a single-purpose helicopter. Unlike the other services, which carry out this mission with multiple-purpose helicopters, the Air Force has traditionally carried out this mission with single-purpose aircraft. The Department will review the combat search and rescue mission in the context of multi-service requirements and capabilities.
Further, this program has experienced contracting problems that have led to delays and higher costs. A prime contractor was selected but, because of multiple protests by the losing contractors, the program has not begun development. The Congressional Budget Office, Government Accountability Office, and the Center for Strategic and International Studies (CSIS) all reported that faulty contracting actions would result in costly delays with no clear resolution. The original estimate for the program was approximately $11.5 billion. Funding in 2010 will be used for a requirements review and in support of the CSAR mission as determined in the Quadrennial Defense Review.

FMI: www.whitehouse.gov/omb/budget/fy2010/assets/trs.pdf

Advertisement

More News

Airborne 12.02.16: Stratos 714 1st Flt, TFR Politics, Airbus Job Cuts

Also: Female Skydive Record, ANN November Efforts, Dream Chaser, SecTrans Reax, FAA SAFO, Able Flight, Airline Group Grounded On November 21, the Stratos 714 very light jet took to>[...]

Aero-News: Quote of the Day (12.04.16)

“All three institutions have now sent a strong signal in favour of modernizing the Agency and the European aviation system as a whole. There is clear political will to ensure>[...]

Yingling Aviation Named Garmin Integrated Flight Deck Dealer

Wichita-Based Center Is Authorized To Sell And Install Garmin G1000 Through G5000 Avionics On Broad Range Of Business Aircraft Yingling Aviation has been named a Garmin Integrated >[...]

ANN's Daily Aero-Linx (12.04.16)

Aero Linx: The Colorado Airport Operators Association (CAOA) The Colorado Airport Operators Association (CAOA) serves the common interests of the owners, operators and users of the>[...]

ANN's Daily Aero-Term (12.04.16): Downburst

Downburst A strong downdraft which induces an outburst of damaging winds on or near the ground. Damaging winds, either straight or curved, are highly divergent. The sizes of downbu>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2016 Web Development & Design by Pauli Systems, LC