White House Aero-Hit-List #2: Combat Search And Rescue (CSAR-X) Helicopter | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date






Airborne On ANN

Airborne 11.23.15

Airborne 11.24.15

Airborne 11.25.15

Airborne 11.19.15

Airborne 11.20.15

Airborne Hi-Def On YouTube

Airborne 11.23.15

Airborne 11.24.15

Airborne 11.25.15

Airborne 11.19.15

Airborne 11.20.15

EAA/ANN AirVenture Innovation Preview

AIP-#1 Vimeo

AIP-#2 Vimeo

AIP-Part 1 YouTube

AIP-Part 2 YouTube

Fri, May 08, 2009

White House Aero-Hit-List #2: Combat Search And Rescue (CSAR-X) Helicopter

$17 Billion Cut... But Trillions More Spent Elsewhere

The Obama Administration, in the process of spending trillions of dollars for all manner of programs and projects, is trumpeted the 17 Billion dollars it is trying to cut from the Federal Budget. Rather than try to digest them all en masse, we'll look at each of them one at a time and allow you to make up YOUR mind as to the rationale and wisdom for the decisions included below. Herewith; another of the programs on the chopping block that has an aviation or aerospace connotation.

From the 'Terminations, Reductions, and Savings' document published this week by the OMB, as part of the FY 2010 US Budget:

Proposal: The Administration proposes to terminate the Air Force Combat Search and Rescue (CSAR-X) Helicopter Program because of problems with contracting, high costs, and questions about the need for an aircraft solely devoted to this purpose when multi-purpose aircraft are available.

Justification: The Department of Defense is questioning the need for a single-purpose helicopter. Unlike the other services, which carry out this mission with multiple-purpose helicopters, the Air Force has traditionally carried out this mission with single-purpose aircraft. The Department will review the combat search and rescue mission in the context of multi-service requirements and capabilities.
Further, this program has experienced contracting problems that have led to delays and higher costs. A prime contractor was selected but, because of multiple protests by the losing contractors, the program has not begun development. The Congressional Budget Office, Government Accountability Office, and the Center for Strategic and International Studies (CSIS) all reported that faulty contracting actions would result in costly delays with no clear resolution. The original estimate for the program was approximately $11.5 billion. Funding in 2010 will be used for a requirements review and in support of the CSAR mission as determined in the Quadrennial Defense Review.

FMI: www.whitehouse.gov/omb/budget/fy2010/assets/trs.pdf


More News

Airborne 11.25.15: Blue Origin Reusable Rocket!, AMA Reacts, Transgender Pilots

Also: UK CAA, E-Fest 2015, Citizens In Space, Gulfstream G500, Dassault Falcon Jet, CFM LEAP-1A, Tuskegee's Milton Crenchaw ANN Airborne Link: /index.cfm?do=video.playVideo&vid>[...]

SpaceX Rocket Debris Found Near The U.K. Isles Of Scilly

Piece Is A Panel From The Interstage Module From ISS Resupply Mission CRS-4 Launched Over A Year Ago A panel from a SpaceX Falcon 9 booster was found floating in the ocean Thursday>[...]

ANN's Daily Aero-Linx (11.28.15)

National Coalition for Aviation Education The National Coalition for Aviation Education is a membership organization that was formed in 1993 when the founding member groups signed >[...]

ANN's Daily Aero-Term (11.28.15): Flight Recorder

A general term applied to any instrument or device that records information about the performance of an aircraft in flight or about conditions encountered in flight.>[...]

Aero-News: Quote Of The Day (11.28.15)

"The markings show an American flag. It looks like it’s an American rocket and is similar to the unmanned SpaceX Falcon 9 which blew up shortly after take-off from Cape Canav>[...]

blog comments powered by Disqus





© 2007 - 2015 Web Development & Design by Pauli Systems, LC