Lockheed Martin C-130J Program Marks Two Major Milestones | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Monday

Tuesday

Wednesday

Thursday

Friday

Airborne On ANN

Airborne 04.25.16

Airborne 04.26.16

AEA2016 LIVE!!! 0830-1230ET

AEA2016 LIVE!!! 1400-1700ET

AEA2016 LIVE!!! 1100-1400ET

Airborne Hi-Def On YouTube

Airborne 04.25.16

Airborne 04.26.16

AEA2016 LIVE!!! 0830-1230ET

AEA2016 LIVE!!! 1400-1700ET

AEA2016 LIVE!!! 1100-1400ET

AEA2016 LIVE Aero-TV: 04/27-0830ET, 04/28-1400ET, 04/29-1100ET

Sun 'n Fun 2016 Innovation Preview on Vimeo!

Sun 'n Fun 2016 Innovation Preview on YouTube!

Wed, Oct 07, 2009

Lockheed Martin C-130J Program Marks Two Major Milestones

200th Aircraft Will Be Equipped To Support Special Missions

Lockheed Martin began final assembly of the first HC/MC-130J Monday, which will also be the 200th C-130J to be produced. U.S. Air Force and company officials commemorated the milestones during a short ceremony on the production line by signing the keel of the historic C-130J that will be delivered in 2010.

"Again we see the C-130 setting new standards for mission flexibility," said Ross Reynolds, vice president of Lockheed Martin C-130 programs. "This new Special Mission configuration of the proven C-130J will give the U.S. Air Force unparalleled capability for Combat Search and Rescue, Personnel Recovery and Special Operations Missions. As demand for the C-130J continues to grow around the world, we will see more and more the way this aircraft can meet the demands of any operator and mission."

Lockheed Martin is under contract to the U.S. Air Force to build the HC/MC-130J Special Mission Hercules to replace aging fleets of Combat Search and Rescue HC-130s and Air Force Special Operations MC-130s. In April 2008, a Department of Defense Acquisition Decision Memorandum (ADM) was signed to start the HC/MC-130J program with a six-aircraft buy. Since that time, six more aircraft have been placed on contract and the latest ADM, signed on Aug. 26, 2009, authorized up to 22 HC/MC130J aircraft.

The new aircraft, based on a KC-130J tanker baseline, will have a host of factory installed provisions to support special mission operations. These include the Enhanced Service Life Wing, the Enhanced Cargo Handling System, a Universal Aerial Refueling Receptacle Slipway Installation (boom refueling receptacle), an Electro-Optic/Infrared Sensor, a Combat Systems Operator Station on the flight deck, dual military SATCOMs, Enhanced Vision System provisions, and higher capacity 60/90 kilovolt amp (KVA) generators. In-line production of this configuration reduces cost and schedule, allowing the aircraft to meet the required 2012 Initial Operational Capability.

FMI: www.lockheedmartin.com

Advertisement

More News

Airborne 04.26.16: Drone v Airplane-NOT!, eFusion Electric Plane, ANN@AEA-LIVE!!

Also: MU-2 AOA, AMA Responds To Senate FAA Reauthorization, ANN@AEA Live 04/27-0830ET, ANN@AEA Live 04/28-1400ET, ANN@AEA Live 04/29-1100ET A report of a drone possibly colliding w>[...]

FAA Approves 5,000 Section 333 Exemption Petition Grants

Gowdy Brothers Aerospace Looks To The Future Of Non-Recreational UAS Use FAA Airman and Airspace Rules Division announces 5,076 approved Section 333 petition grants. The FAA furthe>[...]

Aero-News: Quote Of The Day (05.01.16)

"Working together, we have accomplished a truly incredible amount in the last couple of years. But we’re still really at the beginning of the process. We need to start thinki>[...]

ANN's Daily Aero-Linx (05.01.16)

Aero Linx: Alaskan Aviation Safety Foundation The foundation was created to improve aviation safety in Alaska thorough education, advocacy and research. We are a non-profit members>[...]

ANN's Daily Aero-Term (05.01.16): Common Point

Common Point A significant point over which two or more aircraft will report passing or have reported passing before proceeding on the same or diverging tracks. To establish/mainta>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2016 Web Development & Design by Pauli Systems, LC