Lockheed Martin C-130J Program Marks Two Major Milestones | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** Airborne 09.02.14 ** HD iPad-Friendly -- Airborne 09.02.14 **
** Airborne 08.29.14 ** HD iPad-Friendly -- Airborne 08.29.14 **
** Airborne 08.27.14 ** HD iPad-Friendly -- Airborne 08.27.14 **

Wed, Oct 07, 2009

Lockheed Martin C-130J Program Marks Two Major Milestones

200th Aircraft Will Be Equipped To Support Special Missions

Lockheed Martin began final assembly of the first HC/MC-130J Monday, which will also be the 200th C-130J to be produced. U.S. Air Force and company officials commemorated the milestones during a short ceremony on the production line by signing the keel of the historic C-130J that will be delivered in 2010.

"Again we see the C-130 setting new standards for mission flexibility," said Ross Reynolds, vice president of Lockheed Martin C-130 programs. "This new Special Mission configuration of the proven C-130J will give the U.S. Air Force unparalleled capability for Combat Search and Rescue, Personnel Recovery and Special Operations Missions. As demand for the C-130J continues to grow around the world, we will see more and more the way this aircraft can meet the demands of any operator and mission."

Lockheed Martin is under contract to the U.S. Air Force to build the HC/MC-130J Special Mission Hercules to replace aging fleets of Combat Search and Rescue HC-130s and Air Force Special Operations MC-130s. In April 2008, a Department of Defense Acquisition Decision Memorandum (ADM) was signed to start the HC/MC-130J program with a six-aircraft buy. Since that time, six more aircraft have been placed on contract and the latest ADM, signed on Aug. 26, 2009, authorized up to 22 HC/MC130J aircraft.

The new aircraft, based on a KC-130J tanker baseline, will have a host of factory installed provisions to support special mission operations. These include the Enhanced Service Life Wing, the Enhanced Cargo Handling System, a Universal Aerial Refueling Receptacle Slipway Installation (boom refueling receptacle), an Electro-Optic/Infrared Sensor, a Combat Systems Operator Station on the flight deck, dual military SATCOMs, Enhanced Vision System provisions, and higher capacity 60/90 kilovolt amp (KVA) generators. In-line production of this configuration reduces cost and schedule, allowing the aircraft to meet the required 2012 Initial Operational Capability.

FMI: www.lockheedmartin.com

Advertisement

More News

Annual Oshkosh 2014 'Best/Worst Of' Award Selection Invites YOUR Participation!

YOU Can Contribute To The Annual List Compiled By The Staff and Readership of the ANN and Aero-TV! E-I-C Note: We're going to start naming names and dropping details THIS week--- t>[...]

Airborne 08.29.14: Google Drone!, Cessna's 10,000th, Bearhawk LODA

Also: Big Boeing Order, Napa Tower Quaked, Landsberg Retires, Galileo Falters Breaking News! Google has unveiled an exciting new UAV project, called Project Wing, which has been un>[...]

Aero-TV: The Tecnam Juggernaut -- SeaSky, P2008, P2010, Trainers, and Astore!

An Impressive Line-Up Continues To Make A Solid Impact On Sport Aviation ANN CEO and Editor-In-Chief, Jim Campbell seized the opportunity to talk with Phil Solomon, the CEO of Tecn>[...]

AD: Bombardier, Inc. Airplanes

AD NUMBER: 2014-17-04 PRODUCT: Certain Bombardier, Inc. Model CL-600-2B19 (Regional Jet Series 100 & 440) airplanes.>[...]

ANN's Daily Aero-Linx (09.02.14)

FAA General Aviation Airports Report Beginning in 2010, the FAA began a national review of the general aviation airports resulting in two reports, General Aviation Airports: A Nati>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2014 Web Development & Design by Pauli Systems, LC