Air Force Flies QF-16 Target Drone | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** Airborne 08.27.14 ** HD iPad-Friendly -- Airborne 08.27.14 **
** Airborne 08.25.14 ** HD iPad-Friendly -- Airborne 08.25.14 **
** Airborne 08.22.14 ** HD iPad-Friendly -- Airborne 08.22.14 **

Mon, May 14, 2012

Air Force Flies QF-16 Target Drone

Pilot On Board For First Flight, Will Eventually Be Unmanned

The U.S. Air Force completed the first manned flight of the QF-16 Full Scale Aerial Target (FSAT) on May 4 at Cecil Field in Jacksonville, FL. The QF-16 took off at 1505 EDT. Eastern time and climbed to an altitude of 41,000 feet during its 66-minute flight. The Air Force awarded a multi-year contract to Boeing in March 2010 that represented Phase I of the initial engineering, manufacturing and development of the QF-16, with options to buy up to 126 FSATs.

"With this successful first flight of the QF-16, the Air Force, Boeing and our supplier-partners have laid the groundwork for the program to enter low-rate production in 2013 and make its first production delivery in 2014," said Torbjorn Sjogren, Boeing vice president, Global Maintenance and Upgrades.
 
The functional check flight of the F-16, under control of a Boeing test pilot, validated the basic aircraft performance with the QF-16 drone modification package installed. The additional hardware Boeing installs allows the QF-16 to fly in an unmanned mode while under the control sof a ground-based control system such as the Gulf Range Drone Control System (GRDCS) at Tyndall Air Force Base, FL, or the Drone Formation Control System (DFCS) at White Sands Missile Range (WSMR), NM. During the current test phase in Jacksonville, a GRDCS mobile trailer with portable transmission towers provides communications between the flight controller and other personnel on the ground and the QF-16 pilot.
 
"This was a tremendous milestone for the program and for Boeing because it signals our continued success as an off-Boeing platform support and sustainment provider," said Bob Insinna, Boeing QF-16 program manager.
 
The QF-16s will be a higher-performing aircraft than the QF-4 they replace and representative of fourth-generation targets. They will be flown manned or unmanned within a controlled range and equipped to evaluate how U.S. fighters and weapons will operate against potential adversaries. Boeing will deliver six QF-16 test aircraft to Tyndall in October for additional testing over the Gulf Range. Following the successful conclusion of these tests, Boeing will support government flight testing from Holloman Air Force Base, NM, over the WSMR complex.

FMI: www.af.mil, www.boeing.com


Advertisement

More News

Airborne 08.27.14: WATTsUp Flies!, ForeFlight Update, New Goodyear Blimp Debuts

Also: Air Show Industry Honors 3, Night OSH Airshow, 'New' Wright Flyer, NTSB Unhappy With UPS/Union, Sleepy Chinese Controllers Pipistrel has flown its two-place electric trainer >[...]

AD: Dassault Aviation Airplanes

AD NUMBER: 2014-16-26 PRODUCT: Certain Dassault Aviation Model Falcon 900EX airplanes.>[...]

AD: Empresa Brasileira de Aeronautica S.A. (Embraer)

AD NUMBER: 2014-16-28 PRODUCT: Certain Empresa Brasileira de Aeronautica S.A. (Embraer) Model EMB-135BJ airplanes.>[...]

ANN's Daily Aero-Linx (08.28.14)

The OX Aviation Pioneers Club The club focuses on the era of the Curtiss OX5 engine and the early aviators.>[...]

ANN's Daily Aero-Term (08.28.14): Great Circle Track

A great-circle track is the shortest distance between two points on a sphere, and when viewed on a 2-dimensional map the track will appear curved.>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2014 Web Development & Design by Pauli Systems, LC