Delayed 787 Center Fuselage Segment Arrives In Everett | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Monday

Tuesday

Wednesday

Thursday

Friday

Airborne On ANN

Oshkosh Day One

Oshkosh Day Two

Oshkosh Day Three

Oshkosh Day Four

Oshkosh Day Five

Airborne Hi-Def On YouTube

Oshkosh Day One

Oshkosh Day Two

Oshkosh Day Three

Oshkosh Day Four

Oshkosh Day Five

Tweet Us The Coolest Things You See @OSH16!
#OSH16Coolest!

It's Alive!: AirVenture 2016 Innovation Preview on Vimeo!

It's Alive!: AirVenture 2016 Innovation Preview on YouTube!

Wed, Aug 06, 2008

Delayed 787 Center Fuselage Segment Arrives In Everett

Final Assembly Begins On Fourth Test Plane

Following a five-week delay due to damage at the production facility, this week the center-fuselage section of Boeing's fourth 787 Dreamliner arrived at the planemaker's assembly center in Everett, WA.

The Seattle Times reports the Section 44 midbody barrel arrived Monday night, hours after the aircraft's nose section came in from Wichita. Crews began joining the sections of Dreamliner #4 Tuesday.

As ANN reported, the 84-foot-long center fuselage segment was damaged during assembly at Global Aeronautica in Charleston, SC in late June, after a technician improperly drilled fastener holes in the composite assembly. That worker, a mechanic at Boeing's partner company Alenia, was fired.

It's not yet known how the delay will affect Boeing's already-tight flight test schedule for the 787. The first Dreamliner is slated to fly in November, with deliveries commencing in Q3 of 2009. Boeing will ultimately have six 787-8s in the expected 10-month flight test program, and another two used for ground testing.

"We are still looking at what this will mean to the overall [flight-test] schedule," said Boeing spokeswoman Lori Gunter.

FMI: www.boeing.com

Advertisement

More News

AutoGyro Introduces Type Certified Gyroplanes In The U.S.

Two Versions Of The Calidus Gyroplane FAA Approved The FAA has type-certified two versions of the German-built Calidus Gyroplane after the recent completion of conformity testing c>[...]

SPA Introduces Their 3.3 Liter Corvair Conversion

'Engine In Box' Option Allows Quicker Competition Times For Builders In the North Aircraft display area, Dan and Rachel Weseman of Sport Performance Aviation LLC debuted their late>[...]

Avidyne Makes Innovative Use Of IFD Series With iPads

Provide Interesting Big Glass Solutions For Both Forward Fit And Retrofit Avidyne is showcasing some innovative ‘Big Glass’ configurations in their booth at Oshkosh thi>[...]

Wipaire Helps ANN Make AirVenture Coverage Happen!

Wipaire Is A Leading Aircraft Service Provider, and the Holder Of Over 100 STCs For over 55 years, Wipaire has been engineering and manufacturing a full line of aircraft floats for>[...]

Airborne 07.26.16-Oshkosh Day 2: Solar Impulse, Sun Flyer, Stemme S-12

Also: AEA $$Giveaway$$, LAM Aviation, Able Flight, Jack Pelton On Aero-Medical Reform We start our report this morning with something that has very little to do with the EAA AirVen>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2016 Web Development & Design by Pauli Systems, LC