Delayed 787 Center Fuselage Segment Arrives In Everett | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** Airborne 04.23.14--CLICK HERE! ** HD iPad-Friendly Version--Airborne 04.23.14 **
** Airborne 04.21.14--CLICK HERE! ** HD iPad-Friendly Version--Airborne 04.21.14 **
** Airborne 04.18.14--CLICK HERE! ** HD iPad-Friendly Version--Airborne 04.18.14 **

Wed, Aug 06, 2008

Delayed 787 Center Fuselage Segment Arrives In Everett

Final Assembly Begins On Fourth Test Plane

Following a five-week delay due to damage at the production facility, this week the center-fuselage section of Boeing's fourth 787 Dreamliner arrived at the planemaker's assembly center in Everett, WA.

The Seattle Times reports the Section 44 midbody barrel arrived Monday night, hours after the aircraft's nose section came in from Wichita. Crews began joining the sections of Dreamliner #4 Tuesday.

As ANN reported, the 84-foot-long center fuselage segment was damaged during assembly at Global Aeronautica in Charleston, SC in late June, after a technician improperly drilled fastener holes in the composite assembly. That worker, a mechanic at Boeing's partner company Alenia, was fired.

It's not yet known how the delay will affect Boeing's already-tight flight test schedule for the 787. The first Dreamliner is slated to fly in November, with deliveries commencing in Q3 of 2009. Boeing will ultimately have six 787-8s in the expected 10-month flight test program, and another two used for ground testing.

"We are still looking at what this will mean to the overall [flight-test] schedule," said Boeing spokeswoman Lori Gunter.

FMI: www.boeing.com

Advertisement

More News

Luftwaffe Ju 52 Discovered On The Bottom Of The Black Sea

Plane Disappeared 67 Years Ago On Transport Mission To The Eastern Front A plane missing since 1942 has been discovered in about 75 feet of water in the Black Sea has been identifi>[...]

AD: British Aerospace Regional Aircraft Airplanes

AD NUMBER: 2014-07-09 PRODUCT: British Aerospace Regional Aircraft Jetstream Series 3101 and Jetstream Model 3201 airplanes.>[...]

AD: Airbus Airplanes

AD NUMBER: 2014-08-04 PRODUCT: Certain Airbus Model A310 series airplanes.>[...]

ANN's Daily Aero-Linx (04.24.14)

South Bay Soaring Society The South Bay Soaring Society (SBSS) is a non-profit radio controlled glider club based in San Jose, CA. They have flying sites in San Jose, Santa Clara, >[...]

ANN's Daily Aero-Term (04.24.14): Dew Point (Abbrev. DWPT)

A measure of atmospheric moisture. It is the temperature to which air must be cooled in order to reach saturation (assuming air pressure and moisture content are constant).>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2014 Web Development & Design by Pauli Systems, LC