Delayed 787 Center Fuselage Segment Arrives In Everett | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Monday

Tuesday

Wednesday

Thursday

Friday

Airborne On ANN

Airborne 08.31.15

Airborne 09.01.15

Airborne 09.02.15

Airborne 08.27.15

Airborne 08.28.15

Airborne Hi-Def On YouTube

Airborne 08.31.15

Airborne 09.01.15

Airborne 09.02.15

Airborne 08.27.15

Airborne 08.28.15

EAA/ANN AirVenture Innovation Preview

AIP-#1 Vimeo

AIP-#2 Vimeo

AIP-Part 1 YouTube

AIP-Part 2 YouTube

Wed, Aug 06, 2008

Delayed 787 Center Fuselage Segment Arrives In Everett

Final Assembly Begins On Fourth Test Plane

Following a five-week delay due to damage at the production facility, this week the center-fuselage section of Boeing's fourth 787 Dreamliner arrived at the planemaker's assembly center in Everett, WA.

The Seattle Times reports the Section 44 midbody barrel arrived Monday night, hours after the aircraft's nose section came in from Wichita. Crews began joining the sections of Dreamliner #4 Tuesday.

As ANN reported, the 84-foot-long center fuselage segment was damaged during assembly at Global Aeronautica in Charleston, SC in late June, after a technician improperly drilled fastener holes in the composite assembly. That worker, a mechanic at Boeing's partner company Alenia, was fired.

It's not yet known how the delay will affect Boeing's already-tight flight test schedule for the 787. The first Dreamliner is slated to fly in November, with deliveries commencing in Q3 of 2009. Boeing will ultimately have six 787-8s in the expected 10-month flight test program, and another two used for ground testing.

"We are still looking at what this will mean to the overall [flight-test] schedule," said Boeing spokeswoman Lori Gunter.

FMI: www.boeing.com

Advertisement

More News

AeroSports Update: Rob Holland Wins The Gold

It Was A Big Day For The U.S. National Aerobatic Team As Rob Holland Takes The Gold In The Four Minute Free Program On August 29 It’s been reported on the International Aerob>[...]

ANN's Daily Aero-Linx (09.02.15)

FAA NAS Systems Engineering Portal (SEP) This site renames the NAS Enterprise Architecture Portal and acknowledges a more robust systems engineering and planning perspective along >[...]

ANN's Daily Aero-Term (09.02.15): Landing Gear Extend Speed

The maximum speed an aircraft can be safely flown while the landing gear is extended.>[...]

Aero-News: Quote Of The Day (09.02.15)

"Business Aviation’s global CO2 emissions are very small, being approximately 2 percent of all aviation and .04 percent of global man-made carbon emissions." Source: Excerpt >[...]

Passengers Brawl On JetBlue Flight

Razor, Pepper Spray Used In Conflict Between Two Women On Board Two women on board a JetBlue flight from Kingston, Jamaica to JFK airport in New York got into a brawl as the flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2015 Web Development & Design by Pauli Systems, LC