FIKI... Finally! Eclipse 500 Receives Flight Into Known Icing Certification | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** Airborne 11.21.14 ** HD iPad-Friendly -- Airborne 11.21.14 **
** Airborne 11.19.14 ** HD iPad-Friendly -- Airborne 11.19.14 **
** Airborne 11.17.14 ** HD iPad-Friendly -- Airborne 11.17.14 **

Wed, Jun 25, 2008

FIKI... Finally! Eclipse 500 Receives Flight Into Known Icing Certification

Dramatically Expands Operating Envelope For VLJ

ANN REALTIME REPORTING 06.25.08 1600 EDT: It's a major step forward for the inaugural very-light jet. Moments ago,  Eclipse Aviation announced the Federal Aviation Administration has granted Flight Into Known Icing (FIKI) certification for the Eclipse 500.

"This certification process is one of the most difficult things to put a new model of aircraft through," said Vern Raburn, president and CEO of Eclipse Aviation.  "We've worked through this process for some time, flying the Eclipse 500 in the precise natural icing conditions that the FAA requires. We tested the aircraft in some of the most severe weather conditions we could find, wherever we could find it.

"By receiving the FAA certification, we proved that the aircraft can withstand known icing conditions in a real-world operating environment with no structural changes required of the airframe," Raburn added.

Though the company had promised imminent FIKI certification at numerous times over the past three years, Eclipse says it conducted its first test flight with an artificial ice shape in August 2007. Since that time, more than 300 flight hours on three test aircraft have been recorded, including more than 60 hours conducted in natural icing conditions in many locations in the United States and Canada.

Eclipse also performed extensive tests with the Eclipse 500 in normal operation and ice protection system failure conditions in icing tunnels and with artificial ice shapes (shown below) to simulate ice build up attached to the aircraft's airfoils.

The de-icing system on the Eclipse 500 includes pneumatic de-ice boots on the wings and horizontal stabilizer leading edges, electrically heated windshield and air data probes, and bleed air heated anti-ice engine inlets.

Eclipse states aircraft delivered in late summer 2008 will incorporate all the changes needed for FIKI, but earlier planes will require a series of modifications -- some easier to install than others. For starters, any EA500s prior to S/N 38 -- before a series of performance modifications were introduced, the most prominent of which were larger tip tanks -- will need the performance mods installed.The Albuquerque, NM-based planemaker also changed deicing boot suppliers, starting with S/N 78... so again, all previous aircraft will require that change.

All FIKI-compliant EA500s will require numerous changes, including a rain-repellant coating around static ports, and changes to static bonding and discharge equipment -- including windscreen coatings, engine bonding straps, and new static wicks. The planes will also need a new autopilot pitch servo installed, as well as a new rudder centering spring.

Following its previous policies regarding post-delivery upgrades, Eclipse says it will perform all necessary modifications on the company's dime... but the planemaker isn't saying yet when its maintenance facilities -- already struggling to meet commitments to retrofit the performance mods to earlier planes, as well as the post-S/N 104 changeover to the Avio NG avionics system -- will be able to start work on FIKI mods, as well.

FMI: www.eclipseaviation.com

Advertisement

More News

Airborne 11.21.14: AEA's 3Q/14 Report, Fantasy Of Flight, Modernizing The NAS

Also: Holland Wants Gold, FAA Strangling UAVs?, RAF WWII Trainer For Sale, Bf109s Live, Georgia v Aerospace Engineers The Aircraft Electronics Association has released its third-qu>[...]

Aero-News: Quote Of The Day (11.23.14)

"Reaching this stage that we call ATLO is a critical milestone. This is a very satisfying point of the mission as we transition from many teams working on their individual elements>[...]

ANN FAQ: Getting The Most Out Of ANN's Newsletters

ANN goes through a lot of trouble to make the graphics flashy and cool and an integral part of the story. But let's face it, they're bandwidth-intensive. So here are a couple of th>[...]

Air Force Funds Research On Thermal Management Technology For Fighters

Heat Generated By Electronic Systems A Growing Challenge Managing heat that is generated by electronic subsystems in next-generation aircraft is a vexing challenge for aerospace sy>[...]

Raytheon Successfully Demonstrates Airborne Electronic Attack System

Prototype Test Flights Evaluate Integrated Electronic Warfare Capabilities The U.S. Navy and Raytheon successfully demonstrated an end to end, first of its kind, integrated electro>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2014 Web Development & Design by Pauli Systems, LC