NTSB Issues Recommendation Due To Montrose CL-600 Icing Accident | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** Airborne 07.31.14/Oshkosh Day 4! ** HD iPad-Friendly Version--Airborne 07.31.14/Oshkosh Day 4 **
** Airborne 07.30.14/Oshkosh Day 3! ** HD iPad-Friendly Version--Airborne 07.30.14/Oshkosh Day 3 **
** Airborne 07.29.14/Oshkosh Day 2! ** HD iPad-Friendly Version--Airborne 07.29.14/Oshkosh Day 2 **
** Airborne 07.28.14/Oshkosh Day 1! ** HD iPad-Friendly Version--Airborne 07.28.14/Oshkosh Day 1 **

Wed, Aug 09, 2006

NTSB Issues Recommendation Due To Montrose CL-600 Icing Accident

The NTSB has followed up on its concerns over the 2004 crash of a Bombardier CL-600-2A12 with a series of recommendations owed to the "...particular concern to the Safety Board is that a qualified 14 CFR Part 135 captain and first officer, both of whom received winter weather operations training in accordance with the company's Federal Aviation Administration (FAA)-approved winter operations procedures, could fail to understand the insidious nature of upper wing surface contamination and its threat to the safety of the flight. Further, proper CRM could have helped the crew identify the risks associated with winter weather operations."

Safety Recommendation A-06-42

The National Transportation Safety Board recommends that the Federal Aviation Administration:

Develop visual and tactile training aids to accurately depict small amounts of upper wing surface contamination and require all commercial airplane operators to incorporate these training aids into their initial and recurrent training. (A-06-42)

In addition, the National Transportation Safety Board reiterates the following recommendation to the Federal Aviation Administration:

Require that 14 Code of Federal Regulations (CFR) Part 135 on-demand charter operators that conduct dual-pilot operations establish and implement a Federal Aviation Administration-approved crew resource management training program for their flight crews in accordance with 14 CFR Part 121, subparts N and O. (A-03-52)

FMI: www.ntsb.gov/recs/letters/2006/A06_42.pdf

Advertisement

More News

ICON Aircraft Constructs And Flies First Production A5

ESN-1 Was Built From The Production Design, Tooling After years of waiting... and doubting... ICON Aircraft has unveiled what it says is the first production A5, an aircraft the co>[...]

Airborne 07.30.14: WomenVenture 2014, Skycraft Update, IMC Club Award

Also: AvNav EFB, Lockheed Martin, One Week Wonder Update, Pelton Intvw-Part3 It was hard to miss the energy, enthusiasm, and interest in aviation by hundreds of women celebrating a>[...]

EAA Holds Annual Meeting

Membership Feels Flight Path Still On The Center Line EAA held its annual membership meeting on Wednesday, at 08:30 on 30 July 2014 at Oshkosh, WI. in the Theater of the Woods. In >[...]

Historic OSH2014 Sponsor: Bendix-King by Honeywell

OSH2014 Sponsor: Bendix-King by Honeywell The history of the Bendix name runs parallel to the development of King Radio until the mid-1980s, when the Allied Corporation purchased B>[...]

Life-Saving OSH2014 Sponsor: BRS Parachutes

BRS Parachutes: Defining Aviation Safety It's a simple idea, really. A parachute which will, when deployed, turn what could be a very bad situation into one in which not only the o>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2014 Web Development & Design by Pauli Systems, LC