Work Underway On $16.4 Million Control Tower At Ft. Lauderdale | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Monday

Tuesday

Wednesday

Thursday

Friday

Airborne On ANN

Airborne 06.29.15

Airborne 06.30.15

Airborne 07.01.15

Airborne 07.02.15

Airborne 07.03.15

Airborne Hi-Def On YouTube

Airborne 06.29.15

Airborne 06.30.15

Airborne 07.01.15

Airborne 07.02.15

Airborne 07.03.15

 

Sat, Jan 21, 2012

Work Underway On $16.4 Million Control Tower At Ft. Lauderdale

Groundbreaking At Executive Airport Attended By Ray LaHood, Michael Huerta

The FAA today broke ground Wednesday for a new $16.4 million, state-of-the-art airport traffic control tower at Fort Lauderdale Executive Airport. The new tower, equipped with the latest radar, communications and weather technology, will enable air traffic controllers to continue to provide the safest, most efficient service to flights at the busy South Florida airport.

(L-R) LaHood, Huerta

“Rebuilding and expanding our nation’s aviation infrastructure creates jobs while making flying safer and more efficient,” U.S. Transportation Secretary Ray LaHood said.  “This new tower will benefit South Florida’s air travelers.”

“The new tower demonstrates the FAA’s commitment to aviation safety and to modernizing the air traffic control system in South Florida,” said FAA Acting Administrator Michael Huerta.  “Investing in new air traffic control facilities is a key component of the FAA’s Next Generation Air Traffic Control system.”

The new facility will include a 117-foot-tall air traffic control tower topped by a 525-square-foot tower cab. A 7,200-square-foot single-story base building will house training rooms, administrative offices, and equipment rooms. Air traffic controllers at Ft. Lauderdale Executive Tower handled 162,000 takeoffs and landings in 2011. The airport primarily serves general aviation traffic.

The construction contract for $9.282 million was awarded to J. Kokolakis Contracting, Inc., of Tarpon Springs, Fla.  Design and installation of equipment accounted for the remainder of the total $16.4 million cost. The new tower will be commissioned in spring 2014, replacing the existing tower that was commissioned in 1970.

FMI: www.faa.gov

Advertisement

More News

Airborne 07.03.15: New Trig Avionics, Cargo Biz Grows, iOS GPS Fix

Also: 'No Drone Zone', Aviation v Media, Women's Air Race Classic, Houston Spaceport, Navy's New A/C Launch System, GA Fly Safe, FAA InFO Trig Avionics tells us they are unveiling >[...]

Airborne 07.03.15: New Trig Avionics, Cargo Biz Grows, iOS GPS Fix

Also: 'No Drone Zone', Aviation v Media, Women's Air Race Classic, Houston Spaceport, Navy's New A/C Launch System, GA Fly Safe, FAA InFO Trig Avionics tells us they are unveiling >[...]

Airborne 07.02.15: Bell 525 Flies!, Archer DX Delivers, Boss 182 Upgrade

Also: Wingfoot@AirVenture, Airbus On Pilot Training, XPrize, EFD1000H PFD For Bell, Atlanta Warbird Weekend, Lee Bottom Flying Field, Air Canada/Unifor, National Air Cargo Fined Ju>[...]

ANN FAQ: Getting The Most Out Of ANN's Newsletters

ANN goes through a lot of trouble to make the graphics flashy and cool and an integral part of the story. But let's face it, they're bandwidth-intensive. So here are a couple of th>[...]

Aero-News: Quote Of The Day (07.04.15)

"When presented with a passenger carrying a large sum of money through the screening checkpoint, the TSA officer will frequently engage in dialog with the passenger to determine wh>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2015 Web Development & Design by Pauli Systems, LC