Work Underway On $16.4 Million Control Tower At Ft. Lauderdale | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** Airborne 04.16.14--CLICK HERE! ** HD iPad-Friendly Version--Airborne 04.16.14 **
** Airborne 04.14.14--CLICK HERE! ** HD iPad-Friendly Version--Airborne 04.14.14 **
** Airborne 04.11.14--CLICK HERE! ** HD iPad-Friendly Version--Airborne 04.11.14 **

Sat, Jan 21, 2012

Work Underway On $16.4 Million Control Tower At Ft. Lauderdale

Groundbreaking At Executive Airport Attended By Ray LaHood, Michael Huerta

The FAA today broke ground Wednesday for a new $16.4 million, state-of-the-art airport traffic control tower at Fort Lauderdale Executive Airport. The new tower, equipped with the latest radar, communications and weather technology, will enable air traffic controllers to continue to provide the safest, most efficient service to flights at the busy South Florida airport.

(L-R) LaHood, Huerta

“Rebuilding and expanding our nation’s aviation infrastructure creates jobs while making flying safer and more efficient,” U.S. Transportation Secretary Ray LaHood said.  “This new tower will benefit South Florida’s air travelers.”

“The new tower demonstrates the FAA’s commitment to aviation safety and to modernizing the air traffic control system in South Florida,” said FAA Acting Administrator Michael Huerta.  “Investing in new air traffic control facilities is a key component of the FAA’s Next Generation Air Traffic Control system.”

The new facility will include a 117-foot-tall air traffic control tower topped by a 525-square-foot tower cab. A 7,200-square-foot single-story base building will house training rooms, administrative offices, and equipment rooms. Air traffic controllers at Ft. Lauderdale Executive Tower handled 162,000 takeoffs and landings in 2011. The airport primarily serves general aviation traffic.

The construction contract for $9.282 million was awarded to J. Kokolakis Contracting, Inc., of Tarpon Springs, Fla.  Design and installation of equipment accounted for the remainder of the total $16.4 million cost. The new tower will be commissioned in spring 2014, replacing the existing tower that was commissioned in 1970.

FMI: www.faa.gov

Advertisement

More News

Aero-TV: Dual GPS Solutions -- Maps, Weather, And Traffic To Your EFB Devices

Dual Boasts GPS Support for iOS or Android Platforms While at the AOPA 2013 convention, ANN CEO and Editor-In-Chief, Jim Campbell met with Greg Lukins, Vice President of Business D>[...]

AD: Airbus Airplanes

AD NUMBER: 2014-08-02 PRODUCT: Certain Airbus Model A300 B4-600 and A300 B4-600R series airplanes.>[...]

AD: Bombardier, Inc. Airplanes

AD NUMBER: 2014-08-03 PRODUCT: Certain Bombardier, Inc. Model CL-600-2C10 (Regional Jet Series 700, 701, & 702) airplanes, Model CL-600-2D15 (Regional Jet Series 705) airplanes>[...]

ANN's Daily Aero-Linx (04.18.14)

All About Military Aviation Features well-illustrated articles on all major post-war combat aircraft, a directory of the world's air forces, air show reports and calendar and speci>[...]

ANN's Daily Aero-Term (04.18.14): Onboard Lightning Detection Systems

An onboard weather detection system that senses electrical discharges that suggest the presence of thunderstorm cells.>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2014 Web Development & Design by Pauli Systems, LC