Work Underway On $16.4 Million Control Tower At Ft. Lauderdale | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** Airborne 10.17.14 ** HD iPad-Friendly -- Airborne 10.17.14 **
** Airborne 10.15.14 ** HD iPad-Friendly -- Airborne 10.15.14 **
** Airborne 10.13.14 ** HD iPad-Friendly -- Airborne 10.13.14 **

Sat, Jan 21, 2012

Work Underway On $16.4 Million Control Tower At Ft. Lauderdale

Groundbreaking At Executive Airport Attended By Ray LaHood, Michael Huerta

The FAA today broke ground Wednesday for a new $16.4 million, state-of-the-art airport traffic control tower at Fort Lauderdale Executive Airport. The new tower, equipped with the latest radar, communications and weather technology, will enable air traffic controllers to continue to provide the safest, most efficient service to flights at the busy South Florida airport.

(L-R) LaHood, Huerta

“Rebuilding and expanding our nation’s aviation infrastructure creates jobs while making flying safer and more efficient,” U.S. Transportation Secretary Ray LaHood said.  “This new tower will benefit South Florida’s air travelers.”

“The new tower demonstrates the FAA’s commitment to aviation safety and to modernizing the air traffic control system in South Florida,” said FAA Acting Administrator Michael Huerta.  “Investing in new air traffic control facilities is a key component of the FAA’s Next Generation Air Traffic Control system.”

The new facility will include a 117-foot-tall air traffic control tower topped by a 525-square-foot tower cab. A 7,200-square-foot single-story base building will house training rooms, administrative offices, and equipment rooms. Air traffic controllers at Ft. Lauderdale Executive Tower handled 162,000 takeoffs and landings in 2011. The airport primarily serves general aviation traffic.

The construction contract for $9.282 million was awarded to J. Kokolakis Contracting, Inc., of Tarpon Springs, Fla.  Design and installation of equipment accounted for the remainder of the total $16.4 million cost. The new tower will be commissioned in spring 2014, replacing the existing tower that was commissioned in 1970.

FMI: www.faa.gov

Advertisement

More News

Airborne 10.17.14: Enstrom Delivers, Flight School Scandal, NBAA2014

Also: Rare O-46 Rebuild, Valor Unveiled, OK's Anti-Fly-In Airport, FAA Screw-Ups, The first Enstrom Model 480B-G has been delivered to Rick Boswell of New Hampshire with the Garmin>[...]

ANN's Daily Aero-Linx (10.19.14)

Aero Linx: The North American Trainer Association (NATA) The North American Trainer Association (NATA) is an independent, non-profit corporation dedicated to the restoration and sa>[...]

FANS 1/A Available For Bombardier Challenger 604 Business Jet Operators

Upgrade From Rockwell Collins Builds On Current FMS Rockwell Collins is now offering Future Airspace Navigation System (FANS) 1/A capability for Bombardier’s Challenger 604 a>[...]

NASA Mission Provides Its First Look At Martian Upper Atmosphere

MAVEN Spacecraft Shows Comprehensive Map Of Highly-Variable Ozone NASA's Mars Atmosphere and Volatile Evolution (MAVEN) spacecraft has provided scientists their first look at a sto>[...]

DOD Awards Satellite Contract To Sierra Nevada Corporation

Four Scientific Payloads To Extend Understanding Of The Space Environment The U.S. Department of Defense (DOD) has awarded a contract to Sierra Nevada Space Systems to develop and >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2014 Web Development & Design by Pauli Systems, LC