Work Underway On $16.4 Million Control Tower At Ft. Lauderdale | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** Airborne/NBAA2014 10.24.14 ** HD iPad-Friendly -- Airborne/NBAA2014 10.24.14 **
** Airborne/NBAA2014 10.22.14 ** HD iPad-Friendly -- Airborne/NBAA2014 10.22.14 **
** Airborne/NBAA2014 10.21.14 ** HD iPad-Friendly -- Airborne/NBAA2014 10.21.14 **
** Airborne/NBAA2014 10.20.14 ** HD iPad-Friendly -- Airborne/NBAA2014 10.20.14 **

Sat, Jan 21, 2012

Work Underway On $16.4 Million Control Tower At Ft. Lauderdale

Groundbreaking At Executive Airport Attended By Ray LaHood, Michael Huerta

The FAA today broke ground Wednesday for a new $16.4 million, state-of-the-art airport traffic control tower at Fort Lauderdale Executive Airport. The new tower, equipped with the latest radar, communications and weather technology, will enable air traffic controllers to continue to provide the safest, most efficient service to flights at the busy South Florida airport.

(L-R) LaHood, Huerta

“Rebuilding and expanding our nation’s aviation infrastructure creates jobs while making flying safer and more efficient,” U.S. Transportation Secretary Ray LaHood said.  “This new tower will benefit South Florida’s air travelers.”

“The new tower demonstrates the FAA’s commitment to aviation safety and to modernizing the air traffic control system in South Florida,” said FAA Acting Administrator Michael Huerta.  “Investing in new air traffic control facilities is a key component of the FAA’s Next Generation Air Traffic Control system.”

The new facility will include a 117-foot-tall air traffic control tower topped by a 525-square-foot tower cab. A 7,200-square-foot single-story base building will house training rooms, administrative offices, and equipment rooms. Air traffic controllers at Ft. Lauderdale Executive Tower handled 162,000 takeoffs and landings in 2011. The airport primarily serves general aviation traffic.

The construction contract for $9.282 million was awarded to J. Kokolakis Contracting, Inc., of Tarpon Springs, Fla.  Design and installation of equipment accounted for the remainder of the total $16.4 million cost. The new tower will be commissioned in spring 2014, replacing the existing tower that was commissioned in 1970.

FMI: www.faa.gov

Advertisement

More News

Airborne 10.24.14: AML's Innovations, NASA Preps For Mars, LightHawk Saves

Also: AW609 Pilots Honored, Airbus' VIP Cabin, FreeFlight's FTX-200, Quicksilver S-LSA Milestone During our visit this week to NBAA 2014, Jim Campbell had a chance to talk with Mar>[...]

Airborne at NBAA-10.22.14: Legacy 500, Universal InSight, BendixKing AeroWave

Also: GE Honda, Sagem's Active SideStick, Syberjet Update, Techno Aerospace Knows How to Party The FAA handed over certification papers for Embraer's Legacy 500 executive jet durin>[...]

Airborne 10.24.14: AML's Innovations, NASA Preps For Mars, LightHawk Saves

Also: AW609 Pilots Honored, Airbus' VIP Cabin, FreeFlight's FTX-200, Quicksilver S-LSA Milestone During our visit this week to NBAA 2014, Jim Campbell had a chance to talk with Mar>[...]

AD: Pacific Aerospace Limited Airplanes

AD NUMBER: 2014-21-02 PRODUCT: Pacific Aerospace Limited Model FU24-954 and FU24A-954 airplanes.>[...]

ANN's Daily Aero-Linx (10.25.14)

The Canard Zone An online forum by and for owners and builders of canard aircraft.>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2014 Web Development & Design by Pauli Systems, LC