Work Underway On $16.4 Million Control Tower At Ft. Lauderdale | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** Airborne 10.29.14 ** HD iPad-Friendly -- Airborne 10.29.14 **
** Airborne 10.27.14 ** HD iPad-Friendly -- Airborne 10.27.14 **
** Airborne/NBAA2014 10.24.14 ** HD iPad-Friendly -- Airborne/NBAA2014 10.24.14 **

Sat, Jan 21, 2012

Work Underway On $16.4 Million Control Tower At Ft. Lauderdale

Groundbreaking At Executive Airport Attended By Ray LaHood, Michael Huerta

The FAA today broke ground Wednesday for a new $16.4 million, state-of-the-art airport traffic control tower at Fort Lauderdale Executive Airport. The new tower, equipped with the latest radar, communications and weather technology, will enable air traffic controllers to continue to provide the safest, most efficient service to flights at the busy South Florida airport.

(L-R) LaHood, Huerta

“Rebuilding and expanding our nation’s aviation infrastructure creates jobs while making flying safer and more efficient,” U.S. Transportation Secretary Ray LaHood said.  “This new tower will benefit South Florida’s air travelers.”

“The new tower demonstrates the FAA’s commitment to aviation safety and to modernizing the air traffic control system in South Florida,” said FAA Acting Administrator Michael Huerta.  “Investing in new air traffic control facilities is a key component of the FAA’s Next Generation Air Traffic Control system.”

The new facility will include a 117-foot-tall air traffic control tower topped by a 525-square-foot tower cab. A 7,200-square-foot single-story base building will house training rooms, administrative offices, and equipment rooms. Air traffic controllers at Ft. Lauderdale Executive Tower handled 162,000 takeoffs and landings in 2011. The airport primarily serves general aviation traffic.

The construction contract for $9.282 million was awarded to J. Kokolakis Contracting, Inc., of Tarpon Springs, Fla.  Design and installation of equipment accounted for the remainder of the total $16.4 million cost. The new tower will be commissioned in spring 2014, replacing the existing tower that was commissioned in 1970.

FMI: www.faa.gov

Advertisement

More News

Airborne 10.29.14: Antares Launch Failure, GAMA Responds, Another 'Roadable'???

Also: Dragon Returns, Quadcopter Flown At Airliner?, Classic Aero-TV: Redhawk, Diesel Flt School Airplanes, WWII Bomber Found The unmanned Antares rocket built by Orbital Science C>[...]

Classic Aero-TV: ‘Have it Your Way!’ – The SPA Panther

A New Single-Seat SportPlane Shows Great Potential For Serious Fun While at the Sport Aviation Expo 2014, ANN CEO and Editor-In-Chief, Jim Campbell stopped by to talk with Dan Wese>[...]

AD: Bombardier, Inc. Airplanes

AD NUMBER: 2014-21-07 PRODUCT: Certain Bombardier, Inc. Model CL-600-2C10 (Regional Jet Series 700, 701, & 702) airplanes, Model CL-600-2D24 (Regional Jet Series 900) airplanes>[...]

AD: Airbus Airplanes

AD NUMBER: 2014-21-10 PRODUCT: Certain Airbus Model A330-200 and -300 series airplanes, and Model A340-200 and -300 series airplanes.>[...]

ANN's Daily Aero-Linx (10.31.14)

Ex-MACs This group is made of retired McDonnell Engineers, most of whom began their careers at MAC either on the F101, F3H or F4H programs.>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2014 Web Development & Design by Pauli Systems, LC