Florida TFR: TFN | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** Airborne 09.17.14 ** HD iPad-Friendly -- Airborne 09.17.14 **
** Airborne 09.15.14 ** HD iPad-Friendly -- Airborne 09.15.14 **
** Airborne 09.12.14 ** HD iPad-Friendly -- Airborne 09.12.14 **

Sun, Jul 04, 2004

Florida TFR: TFN

NOTAM:  4/6383 
Issued:  07/03/2004 16:19 
Effective:  Immediately - Until Further Notice 
State:  FL 
Facility:  ZJX - JACKSONVILLE (ARTCC),FL. 
Type:  HAZARDS 
Description:  OCALA, FL.

FDC 4/6383 ZJX FL.. FLIGHT RESTRICTION OCALA, FL. EFFECTIVE IMMEDIATELY UNTIL FURTHER NOTICE. PURSUANT TO 14 CFR SECTION 91.137(A)(2) TEMPORARY FLIGHT RESTRICTIONS ARE IN EFFECT WITHIN A 3 NAUTICAL MILE RADIUS OF 2906.93N/8153.36W AND THE OCALA /OCF/ VORTAC 104 DEGREE RADIAL AT 018 NAUTICAL MILES AT AND BELOW 1500 FEET AGL TO PROVIDE A SAFE ENVIRONMENT FOR FIRE FIGHTING. U.S.F.S, PHONE 352-759-2081, IS IN CHARGE ON SCENE EMERGENCY RESPONSE ACTIVITIES. GAINESVILLE /GNV/ AFSS, PHONE 352-377-4681, IS THE FAA COORDINATION FACILITY.

FMI: http://tfr.faa.gov/tfr/jsp/save_pages/detail_4_6383.html

Advertisement

More News

Airborne 09.17.14: Boeing/SpaceX Win CCtCap, Flying Docs Endorse, Jetpack Bucks

Also: Chris Heintz, Lear 70/75 Certs, Beluga Birthday, Leap Frogs 9/11 Jump Cancelled, Lawyers Sue NTSB The Commercial Spaceflight Federation congratulates NASA and the winners of >[...]

AD: Embraer S.A. Airplanes

AD NUMBER: 2014-19-01 PRODUCT: Embraer S.A. Model EMB-505 airplanes (Phenom 300)>[...]

ANN's Daily Aero-Linx (09.19.14)

Basejumper.com A site dedicated to the sport of BASE jumping. BASE is an acronym which stands for Building, Antenna, Span and Earth.>[...]

ANN's Daily Aero-Term (09.19.14): Breakout

A technique to direct aircraft out of the approach stream. In the context of simultaneous (independent) parallel operations, a breakout is used to direct threatened aircraft away f>[...]

Aero-News: Quote Of The Day (09.19.14)

"We're actually already in the process of putting some framework together, but we're going to hit the ground running when we get back in January." Source: U.S. Representative Sam G>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2014 Web Development & Design by Pauli Systems, LC