Lockheed Martin Wins Contract For P-3 Outer Wing Sets | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Monday

Tuesday

Wednesday

Thursday

Friday

Airborne On ANN

Airborne 03.23.15

Airborne 03.24.15

Airborne 03.25.15

Airborne 03.26.15

Airborne 03.20.15

Airborne Hi-Def On YouTube

Airborne 03.23.15

Airborne 03.24.15

Airborne 03.25.15

Airborne 03.26.15

Airborne 03.20.15

Thu, Sep 04, 2008

Lockheed Martin Wins Contract For P-3 Outer Wing Sets

First Deliveries Expected In 2010

It's a significant -- and needed -- advance for an aging workhorse. Lockheed Martin announced Thursday it has won a $129.3 million contract to build a total of 13 new outer wing sets for the US Navy's fleet of venerable P-3 Orion reconnaissance planes. The all new production outer wings will be delivered to the Navy beginning in early 2010 for installation on selected aircraft.

"Lockheed Martin has a long, proud history of providing P-3 sustainment and support to the US Navy," said Ray Burick, Lockheed Martin vice president of P-3/S-3 programs. "This new wing order is the next step in that partnership."

Lockheed Martin's P-3 wing production line opened in March 2008 and is the cornerstone of the company's P-3 Aircraft Service Life Extension Program (ASLEP). Lockheed Martin currently has the Royal Norwegian Air Force and the US Customs and Border Protection Service under contract for P-3 Life Extension Kits, and has submitted a response to the Canadian Forces under a Request For Proposal. A proposal for the Taiwan P-3 fleet is also in work.

"As the P-3 Orion original equipment manufacturer, Lockheed Martin is uniquely qualified to sustain and support the world's P-3 leets," said Burick. "Aside from the operators of these aircraft, nobody knows the P-3 better than Lockheed Martin."

The complete ASLEP solution replaces the aircraft outer wings, center wing lower section and horizontal stabilizers with new production components. All fatigue-life limiting structures on the aircraft are replaced with enhanced-design components and improved corrosion-resistant materials that will greatly reduce maintenance costs over the aircraft's service life.

"Lockheed Martin is committed to providing a range of solutions that enables operational effectiveness for P-3 Orion operators worldwide for decades to come," said Burick. "We're fully prepared to support the US Navy and all our customers in their future maritime surveillance activities."

The Boeing P-8A Poseidon, expected to replace the Orions, isn't expected to enter service until 2013. The Navy will receive its first of five test P-8As in 2009.

FMI: www.lmco.com, www.navy.com

Advertisement

More News

Airborne 03.25.15: HR476 Opposed, AEA2015 LIVE Schedule, Airbus' 9000th A/C

Also: Nanchang CJ-6A, USAF T-X Program, UK AAIB Withholds Info, Aussie Aero-Politics, GPS Errors Found, ATC Reform House Bill HR 476 will eliminate G.I. training benefits for those>[...]

ANN's Daily Aero-Linx (03.26.15)

Addison Pemberton's Boeing Model 40 The first Model 40 was built for a 1925 U.S. Post Office competition as a replacement for the converted military de Havillands that had carried >[...]

ANN's Daily Aero-Term (03.26.15): Few Clouds

An official sky cover classification for aviation weather observations, descriptive of a sky cover of 1/8 to 2/8.>[...]

Aero-News: Quote Of The Day (03.26.15)

“NBAA will continue to monitor the situation and pursue all available options to ensure access to and the future viability of Santa Monica airport, which is not only an impor>[...]

ANN FAQ: View Aero-News YOUR Way... The 'Headlines Only' Option

Choose How YOU Want To View Your Aero News: 'Headlines Only' Mode We're all pretty excited about the new website design here at ANN, but we HAVE heard from some of you that you lik>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2015 Web Development & Design by Pauli Systems, LC