NASA Says Hold Off On 'Life On Mars!' Reports | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date






Airborne On ANN

Airborne 11.23.15

Airborne 11.24.15

Airborne 11.25.15

Airborne 11.19.15

Airborne 11.20.15

Airborne Hi-Def On YouTube

Airborne 11.23.15

Airborne 11.24.15

Airborne 11.25.15

Airborne 11.19.15

Airborne 11.20.15

EAA/ANN AirVenture Innovation Preview

AIP-#1 Vimeo

AIP-#2 Vimeo

AIP-Part 1 YouTube

AIP-Part 2 YouTube

Mon, Aug 04, 2008

NASA Says Hold Off On 'Life On Mars!' Reports

Phoenix Still Analyzing Martian Soil Data

Despite reports last week by a noted aerospace trade journal -- suggesting NASA was very close to revealing that findings from the Phoenix Mars Lander indicated ideal conditions to support carbon-based life -- on Monday the agency said while the final verdict is still out, no one should hold their breath for such an announcement.

Instead, NASA says its scientists are still analyzing results from soil samples delivered several weeks ago to science instruments on NASA's Phoenix Mars Lander to understand the landing site's soil chemistry and mineralogy.

Within the last month, two samples have been analyzed by the Wet Chemistry Lab of the spacecraft's Microscopy, Electrochemistry, and Conductivity Analyzer, or MECA, suggesting one of the soil constituents may be perchlorate, a highly oxidizing substance. The Phoenix team has been waiting for complementary results from the Thermal and Evolved-Gas Analyzer, or TEGA, which also is capable of detecting perchlorate. TEGA is a series of ovens and analyzers that "sniff" vapors released from substances in a sample.

Confirmation of the presence of perchlorate and supporting data is important prior to scientific peer review and subsequent public announcements. The results from Sunday's TEGA experiment, which analyzed a sample taken directly above the ice layer, found no evidence of this compound.

"This is surprising since an earlier TEGA measurement of surface materials was consistent with but not conclusive of the presence of perchlorate," said Peter Smith, Phoenix's principal investigator at the University of Arizona, Tucson.

Scientists at the Phoenix Science Operations Center at the University of Arizona are specifically looking at the data from these instruments to provide information on the composition of Martian soil.

"We are committed to following a rigorous scientific process. While we have not completed our process on these soil samples, we have very interesting intermediate results," said Smith, "Initial MECA analyses suggested Earth-like soil. Further analysis has revealed un-Earthlike aspects of the soil chemistry."

The team also is working to totally exonerate any possibility of the perchlorate readings being influenced by terrestrial sources which may have migrated from the spacecraft, either into samples or into the instrumentation.

"When surprising results are found, we want to review and assure our extensive pre-launch contamination control processes covered this potential," said Barry Goldstein, Phoenix project manager at NASA's Jet Propulsion Laboratory in Pasadena, CA.

Since landing on May 25, Phoenix has been studying Martian soil with MECA's wet chemistry lab, two microscopes and a conductivity probe, TEGA's ovens and two cameras.

MECA's robotic wet chemistry lab studies soluble chemicals in the soil by mixing a soil sample with a water-based solution with several reagents brought from Earth. The inner surface of each cell's beaker has 26 sensors that give information about the acidity or alkalinity and concentrations of elements such as chloride or perchlorate. The beaker also can detect concentrations of magnesium, calcium and potassium, which form salts that are soluble in water.

With continuing results and the spacecraft in good condition, the mission has been extended through September 30. The original prime mission of three months ends in late August. The mission extension adds five weeks to the 90 days of the prime mission.



More News

Airborne 11.25.15: Blue Origin Reusable Rocket!, AMA Reacts, Transgender Pilots

Also: UK CAA, E-Fest 2015, Citizens In Space, Gulfstream G500, Dassault Falcon Jet, CFM LEAP-1A, Tuskegee's Milton Crenchaw ANN Airborne Link: /index.cfm?do=video.playVideo&vid>[...]

Aero-News: Quote Of The Day (11.29.15)

Aero-News Quote of the Day "Thales pioneered fly-by-wire technology almost 40 years ago, and we believe that Cessna’s confidence in us as we embark on this exciting next step>[...]

ANN's Daily Aero-Term (11.29.15): Inner Marker

Inner Marker A marker beacon used with an ILS (CAT II) precision approach located between the middle marker and the end of the ILS runway, transmitting a radiation pattern keyed at>[...]

ANN's Daily Aero-Linx (11.29.15)

Aero Linx: Mercy Airlift It is the Mission of Mercy Airlift to provide humanitarian aid on a nondiscriminatory and impartial basis to the victims of natural and man made disasters >[...]

Swedavia Selects Lockheed Martin To Deliver Next Generation Systems

Will Share Data Among 10 Airport Network In Sweden Swedish Airport Operator Swedavia has selected Lockheed Martin to deliver a new generation of multi-airport operational systems t>[...]

blog comments powered by Disqus





© 2007 - 2015 Web Development & Design by Pauli Systems, LC