Pratt & Whitney's Gas Turbine Components Exceed 1 Million Hours Run Time | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** Airborne 11.26.14 ** HD iPad-Friendly -- Airborne 11.26.14 **
** Airborne 11.24.14 ** HD iPad-Friendly -- Airborne 11.24.14 **
** Airborne 11.21.14 ** HD iPad-Friendly -- Airborne 11.21.14 **

Sun, Oct 10, 2010

Pratt & Whitney's Gas Turbine Components Exceed 1 Million Hours Run Time

Milestone For Frame 7 Combustion Turbine Systems 

Pratt & Whitney Power System's new and repaired components for the Frame 7FA+e combustion turbine system recently exceeded the 1 million hour mark of run time service. These hours were accumulated through more than 115 sets of varying major turbine hot-section components in power generation applications throughout world-wide markets.

"Surpassing 1 million hours of run time in the demanding Industrial Gas Turbine market demonstrates the dependability of our IGT components," said Charles Levey, vice president, Sales & Marketing, Pratt & Whitney Power Systems. "Our customers have repeatedly chosen Pratt & Whitney as their supplier of replacement components for the Frame 7 for their durability, quality and cost savings."

Benefiting from 85 years of aviation power generation experience, Pratt & Whitney has developed a line of improved industrial gas turbine components with longer-lasting design features, resulting in reduced capital and operating costs for the customers.

Pratt & Whitney says it has improved upon the original Frame 7FA+e equipment by designing nozzles, blades and combustion parts that incorporate company-proprietary alloys and coating systems for superior creep, oxidation and wear performance, ultimately extending part life and reducing operating costs.

FMI: www.pw.utc.com

Advertisement

More News

Airborne 11.26.14: Island Air Scrooges Pilots, DC's NextGen, EAA On Stadium Flts

Also: F35C Pilots Build Time, A Sea Of Yellow Cubs, Lycoming's Dual Fuel Husky, CAP's Gold Medal, Boeing SC's First 787-9 This report could be called the story of the Grinch who st>[...]

AeroSports Update: What Is An LSA, And How Do I Know?

The Term Light Sport Aircraft (LSA) Is A Description Of An Aircraft, Not A Specific Type Of Aircraft Airworthiness Certification Anyone that holds a sport pilot certificate, or any>[...]

Airborne 11.26.14: Island Air Scrooges Pilots, DC's NextGen, EAA On Stadium Flts

Also: F35C Pilots Build Time, A Sea Of Yellow Cubs, Lycoming's Dual Fuel Husky, CAP's Gold Medal, Boeing SC's First 787-9 This report could be called the story of the Grinch who st>[...]

Aero-TV: SyberJet Update -- A Whole New Program

Fast and Agile -- The Latest Updates To The SyberJet Program Show Promise While at NBAA2014, ANN CEO and Editor-In-Chief, Jim Campbell, visited with Mark Fairchild, the general man>[...]

ANN's Daily Aero-Linx (11.27.14)

International Civil Aviation Organization The ICAO is a UN Specialized Agency,and a global forum for civil aviation.>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2014 Web Development & Design by Pauli Systems, LC