Dreamliner Test-Flying Again | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** AIRBORNE 05.24.13 Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 05.24.13 **

** AIRBORNE 05.21.13 Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 05.21.13 **

** AIRBORNE 04.01.13 SPECIAL EDITION of Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 04.01.13 SPECIAL EDITION **

Wed, Jan 19, 2011

Dreamliner Test-Flying Again

Flight Testing Resumed Monday Following November Electrical Fire

The first Dreamliner flight test since an electrical panel on ZA002 caught fire in November occurred Monday. ZA004 took off from Yuma, AZ on a flight to show that the aircraft could safely jettison fuel, which would be required before an emergency landing.


ZA004 File Photo

The resumption of FAA certification flights means Boeing can now work on firming up a revised delivery schedule. Delivery dates had been pushed back again after testing was cancelled. Commercial Airplanes chief Jim Albaugh told The Seattle Times that the company would not release a schedule until the FAA makes a determination about what modifications need to be made to the panel.

Attention is now focusing on debris in the panel which may have caused the fire, and the series of systems failures that followed. One of those was the loss of the primary flight displays in the cockpit.  Boeing has identified some "minor" hardware modifications that will prevent debris from getting to the panel, and some more extensive software changes to help the Dreamliner's electrical system cope more effectively to a failure in a single panel.


ZA002

There is also some speculation that the FAA will stiffen the certification standards following the fire, and an unrelated incident involving a Rolls-Royce engine on a Qantas A380 late last year. That would also have an effect on the delivery date.

FMI: www.boeing.com

Advertisement

More News

Update: Startling... FAA Wants EAA To Pay Them To Staff Oshkosh

Could The FAA Get ANY Stranger? Worse Yet... Will They? ANN RealTime News Update, 1324ET, 05.23.13: Well... the statement we were promised YESTERDAY showed up today... and it doesn>[...]

Aspen Avionics Evolution Backup Display Expands To Piper Archer, Seminole

Aspen’s All Digital Backup Display Will Give Flight-Training Students The Total Glass Panel Experience Aspen Avionics announced Tuesday that Piper Aircraft has selected the E>[...]

Classic Aero-TV: EAA’s Jack Pelton – ‘Everything’s Going to Be OK’

Building A New Future For The EAA... One Issue At A Time Originally WebCast 11.14.12: With only a couple of weeks in pocket, directing the reorganization of the EAA in the wake of >[...]

House Committee Hearing Focuses On Strategic Stepping Stones To Mars

Subcommittee Chair Call Mars Mission A Congressional Priority The House Science Committee Subcommittee on Space held a hearing Tuesday to examine possible options for the next step>[...]

Dassault Falcon Embarks On Spares Pricing Overhaul

Third Such Restructuring In 10 Years Dassault Falcon has embarked on its third parts pricing overhaul in the past 10 years, assessing the cost of over 18,500 individual items. The >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2013 Web Development & Design by Pauli Systems, LC