CAE To Develop 6 Additional P-8A Trainers | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Monday

Tuesday

Wednesday

Thursday

Friday

Airborne On ANN

Airborne 07.20.15

Airborne 07.21.15

Airborne 07.22.15

Airborne 07.23.15

Airborne 07.24.15

Airborne Hi-Def On YouTube

Airborne 07.20.15

Airborne 07.21.15

Airborne 07.22.15

Airborne 07.23.15

Airborne 07.24.15

EAA/ANN AirVenture Innovation Preview

AIP-#1 Vimeo

AIP-#2 Vimeo

AIP-Part 1 YouTube

AIP-Part 2 YouTube

Wed, Nov 30, 2011

CAE To Develop 6 Additional P-8A Trainers

OFTs, Desktop Trainers Included In The Order

As the new Poseidon P-8A moves towards higher production rates and the eventual replacement of the Navy's P-3 fleet, training pilots and crews becomes more critical. CAE announced Monday at the I/ITSEC conference being held in Orlando, FL, that Boeing has ordered six additional P-8A Poseidon operational flight trainers (OFTs) for the United States Navy.

The order was booked in CAE's second quarter ending September 30, 2011 and included in the value of military contracts announced by CAE on October 17, 2011. Boeing, prime contractor for the U.S. Navy P-8A program, is the undisclosed United States customer referenced in that press release.

CAE will manufacture the simulators as well as develop a suite of P-8A Aircraft Equipment enhanced Desktop Environment (AeDTE) trainers, which will be used as role playing stations during training of P-8A aircrews. The P-8A OFTs and AeDTEs are part of a recent contract awarded to Boeing to support low rate initial production lot two (LRIP-II) of the P-8A multi-mission maritime aircraft.

"As the United States Navy continues planning for initial operating capability of the P-8A, CAE is pleased to be working closely with Boeing to deliver the training systems required," said John Lenyo, President and General Manager, CAE USA. "The Navy expects to increase the amount of synthetic training used for aircrew training so the fleet of P-8A operational flight trainers we deliver will play a key role in preparing crews to effectively operate and employ this state-of-the-art aircraft."

The P-8A Poseidon is a new long-range anti-submarine and anti-surface warfare aircraft currently being developed for the U.S. Navy by prime contractor Boeing. The P-8A is a derivative of Boeing's next-generation 737-800 aircraft and will be used for maritime and littoral operations. The U.S. Navy plans to acquire 117 P-8A aircraft to replace its current fleet of P-3C Orion aircraft. The Indian Navy, the first international customer for the P-8, has ordered eight P-8I aircraft.

CAE is already under contract from Boeing to design and manufacture four P-8A OFTs, so this order brings the total number of P-8A OFTs that CAE will develop to ten. CAE designs and manufactures the P-8A OFT hardware to Level D standards, the highest qualification for flight simulators. CAE also provides the 737-800 OFT software baseline and simulation-based software lab environment that is used for P-8A OFT development and integration tasks. CAE then delivers the P-8A OFTs to Boeing, who installs and integrates software specific to the P-8A aircraft and completes delivery to the U.S. Navy.

FMI: www.cae.com

Advertisement

More News

AeroSports Update: Medical Rules For Pilots Without Medicals

Sport Pilots And Glider Pilots Flying Without Medicals Must Comply With Fit-For-Flight Rules In a letter sent to all U.S. Senators, the Airline Pilots Association’s (ALPA) pr>[...]

ANN's Daily Aero-Linx (07.29.15)

Homebuilt Homepage The Homebuilt Homepage is an index and reference on Homebuilt Experimental class aircraft and related information. This is a non-profit website.>[...]

ANN's Daily Aero-Term (07.29.15): Expect Departure Clearance Time

The time issued to a flight to indicate when it can expect to receive departure clearance. EDCTs are issued as part of Traffic Management Programs, such as a Ground Delay Program (>[...]

Aero-News: Quote Of The Day (07.29.15)

“The avionics repair shop industry in the U.S. has only 53 months remaining to equip the entire general aviation fleet of more than 100,000 aircraft with ADS-B Out equipment.>[...]

ANN FAQ: Getting The Word Out

Things To Know When You Send A News Release Aero-News gets hundreds of releases every week, ranging from industry giants like Boeing and Cessna to the smallest of flying clubs and >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2015 Web Development & Design by Pauli Systems, LC