EBACE 2009: Dallas Airmotive Love Field Airport RTC Expands PW305 Capability | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Monday

Tuesday

Wednesday

Thursday

Friday

Airborne On ANN

Airborne 07.18.16

Airborne 07.19.16

Airborne 07.20.16

Airborne 07.21.16

Airborne 07.22.16

Airborne Hi-Def On YouTube

Airborne 07.18.16

Airborne 07.19.16

Airborne 07.20.16

Airborne 07.21.16

Airborne 07.22.16

Tweet Us The Coolest Things You See @OSH16!
#OSH16Coolest!

It's Alive!: AirVenture 2016 Innovation Preview on Vimeo!

It's Alive!: AirVenture 2016 Innovation Preview on YouTube!

 

Mon, May 11, 2009

EBACE 2009: Dallas Airmotive Love Field Airport RTC Expands PW305 Capability

Dallas Airmotive has expanded its PW305 capabilities at the company's Regional Turbine Center (RTC) located at Dallas Love Field Airport (DAL) in Dallas, Texas. The latest addition is the tooling and equipment to perform IBR (Integrally Bladed Rotor) replacement on the PW305A used on Learjet 60 aircraft. The first two engines to receive this replacement were completed in April.

"We knew that Pratt & Whitney Canada would introduce a new IBR for the 305A this year, so we prepared for this event last year by expanding the facility and purchasing the necessary tooling and equipment," stated Dallas Airmotive Vice President Customer Service and Global Regional Turbine Center Operations, Mike Cumnock. "As soon as the new IBR became available we were ready and have now finished our first engines with more scheduled for the rest of 2009."

Replacement of the PW305A IBR eliminates the need for inspection every 300 hours as required for the original units.

"When we received PW305 authorization from Pratt & Whitney Canada in 2004, we immediately set up the Love Field RTC for Hot Section Inspection (HSI) and quick turn service," added Cumnock.

"By doing so, our main overhaul center in Dallas could focus on major repairs and overhauls. At the RTC we've driven down Hot Section Inspection turn times to under 14 calendar days. And now, with the new equipment, we can replace the IBR separately or in conjunction with the HSI."

FMI: www.BBAAviationERO.com

Advertisement

More News

Airborne 07.22.16: ONE Aviation New Jet, Drone Pilot Nabbed, Stemme Twin Voyager

Also: AEA Giveaway, 44 Trips To OSH, Airbus Drones, Future Pilots, NTSB Training, Air BP, Boeing Forecast, ALPA Milestone ONE Aviation has provided ANN with the initial outline for>[...]

It's ALIVE! 2016 AirVenture Innovation Preview Program Debuting RIGHT NOW!

Get The EARLY Inside Details On THE Most Exciting NEW Innovations And Product Announcements From OSHKOSH... The staff of EAA and the Aero-News Network are pleased to announce that >[...]

EAA Raises The Bar -- Accessible Safety STC Adds More Aircraft, More Devices

STC Can Be Ordered Online Starting Right Now We knew it was coming and we're glad to see it coming along so well and siwiftly... EAA has announced several much anticipated updates >[...]

Airborne 07.21.16: KC46 Update, Fly A P40 at AirVenture?, Runway Conditions

Also: ANN 2016 Oshkosh Schedule, Airplane Efficiency, Federal Excise Tax, A320neo, Jet Demos, 100+ Exoplanets, CFM's $8.2B Deal The KC-46 Pegasus aerial tanker program moved closer>[...]

Teens With Drone Help Solve Boat Theft

Followed The Suspects As Far As They Could And Alerted Police Two teenagers with a camera-equipped UAV helped police catch some suspected boat thieves this week on Camano Island in>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2016 Web Development & Design by Pauli Systems, LC