EBACE 2009: Dallas Airmotive Love Field Airport RTC Expands PW305 Capability | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Monday

Tuesday

Wednesday

Thursday

Friday

Airborne On ANN

Airborne 08.31.15

Airborne 09.01.15

Airborne 09.02.15

Airborne 08.27.15

Airborne 08.28.15

Airborne Hi-Def On YouTube

Airborne 08.31.15

Airborne 09.01.15

Airborne 09.02.15

Airborne 08.27.15

Airborne 08.28.15

EAA/ANN AirVenture Innovation Preview

AIP-#1 Vimeo

AIP-#2 Vimeo

AIP-Part 1 YouTube

AIP-Part 2 YouTube

Mon, May 11, 2009

EBACE 2009: Dallas Airmotive Love Field Airport RTC Expands PW305 Capability

Dallas Airmotive has expanded its PW305 capabilities at the company's Regional Turbine Center (RTC) located at Dallas Love Field Airport (DAL) in Dallas, Texas. The latest addition is the tooling and equipment to perform IBR (Integrally Bladed Rotor) replacement on the PW305A used on Learjet 60 aircraft. The first two engines to receive this replacement were completed in April.

"We knew that Pratt & Whitney Canada would introduce a new IBR for the 305A this year, so we prepared for this event last year by expanding the facility and purchasing the necessary tooling and equipment," stated Dallas Airmotive Vice President Customer Service and Global Regional Turbine Center Operations, Mike Cumnock. "As soon as the new IBR became available we were ready and have now finished our first engines with more scheduled for the rest of 2009."

Replacement of the PW305A IBR eliminates the need for inspection every 300 hours as required for the original units.

"When we received PW305 authorization from Pratt & Whitney Canada in 2004, we immediately set up the Love Field RTC for Hot Section Inspection (HSI) and quick turn service," added Cumnock.

"By doing so, our main overhaul center in Dallas could focus on major repairs and overhauls. At the RTC we've driven down Hot Section Inspection turn times to under 14 calendar days. And now, with the new equipment, we can replace the IBR separately or in conjunction with the HSI."

FMI: www.BBAAviationERO.com

Advertisement

More News

AeroSports Update: Rob Holland Wins The Gold

It Was A Big Day For The U.S. National Aerobatic Team As Rob Holland Takes The Gold In The Four Minute Free Program On August 29 It’s been reported on the International Aerob>[...]

ANN's Daily Aero-Linx (09.02.15)

FAA NAS Systems Engineering Portal (SEP) This site renames the NAS Enterprise Architecture Portal and acknowledges a more robust systems engineering and planning perspective along >[...]

ANN's Daily Aero-Term (09.02.15): Landing Gear Extend Speed

The maximum speed an aircraft can be safely flown while the landing gear is extended.>[...]

Aero-News: Quote Of The Day (09.02.15)

"Business Aviation’s global CO2 emissions are very small, being approximately 2 percent of all aviation and .04 percent of global man-made carbon emissions." Source: Excerpt >[...]

Passengers Brawl On JetBlue Flight

Razor, Pepper Spray Used In Conflict Between Two Women On Board Two women on board a JetBlue flight from Kingston, Jamaica to JFK airport in New York got into a brawl as the flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2015 Web Development & Design by Pauli Systems, LC