First Soyuz Almost Ready For Launch From French Guiana | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Monday

Tuesday

Wednesday

Thursday

Friday

Airborne On ANN

Airborne 06.27.16

Airborne 06.28.16

Airborne 06.29.16

Airborne 06.30.16

Airborne 07.01.16

Airborne Hi-Def On YouTube

Airborne 06.27.16

Airborne 06.28.16

Airborne 06.29.16

Airborne 06.30.16

Airborne 07.01.16

AEA2016 LIVE Aero-TV: 04/27-0830ET, 04/28-1400ET, 04/29-1100ET

Sun 'n Fun 2016 Innovation Preview on Vimeo!

Sun 'n Fun 2016 Innovation Preview on YouTube!

Fri, May 06, 2011

First Soyuz Almost Ready For Launch From French Guiana

Dry Runs Underway To Test Facilities

The final countdown before its maiden flight later this year has begun for Soyuz with a simulated launch campaign at Europe's Spaceport in French Guiana. This dry run ensures that the Soyuz and the new facilities work together perfectly, while allowing the teams to train under realistic launch conditions. It also validates all the procedures during the final phase before launch, except the fuelling of the vehicle.

Last Friday, one of the two Soyuz launchers already at the Spaceport was rolled out of the preparation building horizontally using the 600 m-long railway leading to the launch platform. The vehicle was then erected into the vertical position and suspended over the pad with the use of four support arms. The mobile gantry, built specifically for Soyuz operations in French Guiana, was rolled out to the pad and the vehicle's upper composite, comprising the Fregat upper stage and payload fairing, was hoisted on top of the launcher.

The rehearsal is simulating the five-day final phase before launch. The final countdown will be performed, including the gantry's rollback to its parked position, about 250 feet from the pad. It will be intentionally stopped to validate the procedures in the event of a launch interruption.

The countdown resumed Thursday with a simulated liftoff and flight downrange. These tests will give the green light for the first Soyuz flight from French Guiana in the third quarter of 2011.

FMI: www.arianespace.com

Advertisement

More News

Airborne 06.29.16: SWA Delays Max, McConnell OKs B29-Doc, AAL Trashes Cameras

Also: Flytenow V Supreme Ct, Electric eSpyder, F-35 Adir, IL AirShow, NJ AvTax, FAI Young Artist, Unregistered Airplane To survive in the airline business it is sometimes necessary>[...]

AD: Saab AB, Saab Aeronautics

AD NUMBER: 2016-13-06 PRODUCT: Certain Saab AB, Saab Aeronautics Model 340A (SAAB/SF340A) and SAAB 340B airplanes.>[...]

AD: Airbus Helicopters

AD NUMBER: 2016-13-07 PRODUCT: Airbus Helicopters Model AS365 N3 helicopters.>[...]

ANN's Daily Aero-Linx (06.30.16)

FAA Airworthiness Certificates Overview An airworthiness certificate is an FAA document which grants authorization to operate an aircraft in flight.>[...]

ANN's Daily Aero-Term (06.30.16): Terminal Area

A general term used to describe airspace in which approach control service or airport traffic control service is provided.>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2016 Web Development & Design by Pauli Systems, LC