First Soyuz Almost Ready For Launch From French Guiana | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Monday

Tuesday

Wednesday

Thursday

Friday

Airborne On ANN

Airborne 08.31.15

Airborne 09.01.15

Airborne 09.02.15

Airborne 09.03.15

Airborne 09.04.15

Airborne Hi-Def On YouTube

Airborne 08.31.15

Airborne 09.01.15

Airborne 09.02.15

Airborne 09.03.15

Airborne 09.04.15

EAA/ANN AirVenture Innovation Preview

AIP-#1 Vimeo

AIP-#2 Vimeo

AIP-Part 1 YouTube

AIP-Part 2 YouTube

Fri, May 06, 2011

First Soyuz Almost Ready For Launch From French Guiana

Dry Runs Underway To Test Facilities

The final countdown before its maiden flight later this year has begun for Soyuz with a simulated launch campaign at Europe's Spaceport in French Guiana. This dry run ensures that the Soyuz and the new facilities work together perfectly, while allowing the teams to train under realistic launch conditions. It also validates all the procedures during the final phase before launch, except the fuelling of the vehicle.

Last Friday, one of the two Soyuz launchers already at the Spaceport was rolled out of the preparation building horizontally using the 600 m-long railway leading to the launch platform. The vehicle was then erected into the vertical position and suspended over the pad with the use of four support arms. The mobile gantry, built specifically for Soyuz operations in French Guiana, was rolled out to the pad and the vehicle's upper composite, comprising the Fregat upper stage and payload fairing, was hoisted on top of the launcher.

The rehearsal is simulating the five-day final phase before launch. The final countdown will be performed, including the gantry's rollback to its parked position, about 250 feet from the pad. It will be intentionally stopped to validate the procedures in the event of a launch interruption.

The countdown resumed Thursday with a simulated liftoff and flight downrange. These tests will give the green light for the first Soyuz flight from French Guiana in the third quarter of 2011.

FMI: www.arianespace.com

Advertisement

More News

Airborne 09.04.15: FAA's Updated Model Guidance, WTC Base Jumper, Gordon Bennett

Also: WOW Conference, Hoover v FAA--Part II, National Safety Forum, Slovakian Bell 429, AAR Milestone, Record UAV Flight, Commercial UAV Operator's Balloon Ticket The FAA has just >[...]

Airborne 09.03.15: Falcon 9 Delayed, UAV 'Favor' Fined, Impounded In The UK

Also: Rob Holland's Gold, API: Innovative Aviation Content, Master Instructors, Wallops' New Launch Command Ctr, Webb Space Telescope, Satellite Broadband Network, Another FAA Fine>[...]

Airborne 09.04.15: FAA's Updated Model Guidance, WTC Base Jumper, Gordon Bennett

Also: WOW Conference, Hoover v FAA--Part II, National Safety Forum, Slovakian Bell 429, AAR Milestone, Record UAV Flight, Commercial UAV Operator's Balloon Ticket The FAA has just >[...]

ANN's Daily Aero-Linx (09.05.15)

Airborne Weather Radar While Nexrad and Nowrad are becoming more common in aircraft cockpits, many airplanes still carry radar equipment on board.>[...]

ANN's Daily Aero-Term (09.05.15): Multi-Mode Radar

Used for Terrain Following (TF) and Terrain Avoidance (TA), Ground Mapping (GM) and Air-to Ground Ranging (AGR).>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2015 Web Development & Design by Pauli Systems, LC