First Soyuz Almost Ready For Launch From French Guiana | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

 

** Airborne 07.30.14/Oshkosh Day 3! ** HD iPad-Friendly Version--Airborne 07.30.14/Oshkosh Day 3 **
** Airborne 07.29.14/Oshkosh Day 2! ** HD iPad-Friendly Version--Airborne 07.29.14/Oshkosh Day 2 **
** Airborne 07.28.14/Oshkosh Day 1! ** HD iPad-Friendly Version--Airborne 07.28.14/Oshkosh Day 1 **

Fri, May 06, 2011

First Soyuz Almost Ready For Launch From French Guiana

Dry Runs Underway To Test Facilities

The final countdown before its maiden flight later this year has begun for Soyuz with a simulated launch campaign at Europe's Spaceport in French Guiana. This dry run ensures that the Soyuz and the new facilities work together perfectly, while allowing the teams to train under realistic launch conditions. It also validates all the procedures during the final phase before launch, except the fuelling of the vehicle.

Last Friday, one of the two Soyuz launchers already at the Spaceport was rolled out of the preparation building horizontally using the 600 m-long railway leading to the launch platform. The vehicle was then erected into the vertical position and suspended over the pad with the use of four support arms. The mobile gantry, built specifically for Soyuz operations in French Guiana, was rolled out to the pad and the vehicle's upper composite, comprising the Fregat upper stage and payload fairing, was hoisted on top of the launcher.

The rehearsal is simulating the five-day final phase before launch. The final countdown will be performed, including the gantry's rollback to its parked position, about 250 feet from the pad. It will be intentionally stopped to validate the procedures in the event of a launch interruption.

The countdown resumed Thursday with a simulated liftoff and flight downrange. These tests will give the green light for the first Soyuz flight from French Guiana in the third quarter of 2011.

FMI: www.arianespace.com

Advertisement

More News

ICON Aircraft Constructs And Flies First Production A5

ESN-1 Was Built From The Production Design, Tooling After years of waiting... and doubting... ICON Aircraft has unveiled what it says is the first production A5, an aircraft the co>[...]

Airborne 07.30.14: WomenVenture 2014, Skycraft Update, IMC Club Award

Also: AvNav EFB, Lockheed Martin, One Week Wonder Update, Pelton Intvw-Part3 It was hard to miss the energy, enthusiasm, and interest in aviation by hundreds of women celebrating a>[...]

EAA Holds Annual Meeting

Membership Feels Flight Path Still On The Center Line EAA held its annual membership meeting on Wednesday, at 08:30 on 30 July 2014 at Oshkosh, WI. in the Theater of the Woods. In >[...]

Historic OSH2014 Sponsor: Bendix-King by Honeywell

OSH2014 Sponsor: Bendix-King by Honeywell The history of the Bendix name runs parallel to the development of King Radio until the mid-1980s, when the Allied Corporation purchased B>[...]

Life-Saving OSH2014 Sponsor: BRS Parachutes

BRS Parachutes: Defining Aviation Safety It's a simple idea, really. A parachute which will, when deployed, turn what could be a very bad situation into one in which not only the o>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2014 Web Development & Design by Pauli Systems, LC