First Soyuz Almost Ready For Launch From French Guiana | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** Airborne 09.17.14 ** HD iPad-Friendly -- Airborne 09.17.14 **
** Airborne 09.15.14 ** HD iPad-Friendly -- Airborne 09.15.14 **
** Airborne 09.12.14 ** HD iPad-Friendly -- Airborne 09.12.14 **

Fri, May 06, 2011

First Soyuz Almost Ready For Launch From French Guiana

Dry Runs Underway To Test Facilities

The final countdown before its maiden flight later this year has begun for Soyuz with a simulated launch campaign at Europe's Spaceport in French Guiana. This dry run ensures that the Soyuz and the new facilities work together perfectly, while allowing the teams to train under realistic launch conditions. It also validates all the procedures during the final phase before launch, except the fuelling of the vehicle.

Last Friday, one of the two Soyuz launchers already at the Spaceport was rolled out of the preparation building horizontally using the 600 m-long railway leading to the launch platform. The vehicle was then erected into the vertical position and suspended over the pad with the use of four support arms. The mobile gantry, built specifically for Soyuz operations in French Guiana, was rolled out to the pad and the vehicle's upper composite, comprising the Fregat upper stage and payload fairing, was hoisted on top of the launcher.

The rehearsal is simulating the five-day final phase before launch. The final countdown will be performed, including the gantry's rollback to its parked position, about 250 feet from the pad. It will be intentionally stopped to validate the procedures in the event of a launch interruption.

The countdown resumed Thursday with a simulated liftoff and flight downrange. These tests will give the green light for the first Soyuz flight from French Guiana in the third quarter of 2011.

FMI: www.arianespace.com

Advertisement

More News

AD: Bombardier, Inc. Airplanes

AD NUMBER: 2013-15-06 PRODUCT: Certain Bombardier, Inc. Model DHC-8-102, -103, -106, -201, -202, -301, -311, and –315 airplanes.>[...]

AD: Dassault Aviation Airplanes

AD NUMBER: 2013-26-05 PRODUCT: All Dassault Aviation Model FAN JET FALCON, FAN JET FALCON SERIES C, D, E, F, and G airplanes; Model MYSTERE-FALCON 200 airplanes; and Model MYSTERE->[...]

ANN's Daily Aero-Linx (09.17.14)

Learn to Fly Blog This blog features writings by aviation authors and flight instructors.>[...]

ANN's Daily Aero-Term (09.17.14): Base Turn

A turn executed by the aircraft during the initial approach between the end of the outbound track and the beginning of the intermediate or final approach track.>[...]

Aero-News: Quote Of The Day (09.17.14)

“In the near future, general aviation manufacturers will be able to certify their products more efficiently and effectively, meaning more safety in more airplanes.” Sou>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2014 Web Development & Design by Pauli Systems, LC