City Of Philadelphia Selects Managers For Big Airport Expansion | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** Airborne 04.23.14--CLICK HERE! ** HD iPad-Friendly Version--Airborne 04.23.14 **
** Airborne 04.21.14--CLICK HERE! ** HD iPad-Friendly Version--Airborne 04.21.14 **
** Airborne 04.18.14--CLICK HERE! ** HD iPad-Friendly Version--Airborne 04.18.14 **

Mon, Jun 04, 2012

City Of Philadelphia Selects Managers For Big Airport Expansion

Multi-Billion Dollar Project Expected To Be Complete In 12 To 15 Years

Philadelphia city officials have picked a three company joint venture to plan and manage construction of a major expansion project at PHL. Denver-based engineering and construction firm CH2M Hill will be the lead company, and will work with Delon Hampton & Assoc. and CMTS Inc.

The city pegs the cost of the project at $6.5 billion and will take 12 to 15 years to complete. The scope of the project includes a new runway and extensions of the two existing runways, and expanded terminal complex, construction of a passenger train, relocation of a freight handling facility and new parking and car rental facilities.

Philly.com reports that airlines currently offering service to the airport argue that their cost will be closer to $10.5 billion and will do nothing to ease congestion or increase capacity. According to them the problem is crowded skies over the northeast and not on the ground.

Deputy Mayor Rina Cutler said "We have outstanding issues with the airlines, but we’re continuing to negotiate, and it’s in everybody’s interest to get to ‘yes’." Airport chief executive officer Mark Gale said the project-management office will help develop financial numbers that both the airlines and airport officials can trust.  The airlines and airport managers have sounded more conciliatory since a face-to-face meeting in March between Mayor Nutter and US Airways chief executive Doug Parker. Parker flew to Philadelphia to meet with Nutter amid public disagreement between the airport and its US Airways about the need for the new runway along the Delaware River.

FMI: www.phila.gov

Advertisement

More News

Luftwaffe Ju 52 Discovered On The Bottom Of The Black Sea

Plane Disappeared 67 Years Ago On Transport Mission To The Eastern Front A plane missing since 1942 has been discovered in about 75 feet of water in the Black Sea has been identifi>[...]

AD: British Aerospace Regional Aircraft Airplanes

AD NUMBER: 2014-07-09 PRODUCT: British Aerospace Regional Aircraft Jetstream Series 3101 and Jetstream Model 3201 airplanes.>[...]

AD: Airbus Airplanes

AD NUMBER: 2014-08-04 PRODUCT: Certain Airbus Model A310 series airplanes.>[...]

ANN's Daily Aero-Linx (04.24.14)

South Bay Soaring Society The South Bay Soaring Society (SBSS) is a non-profit radio controlled glider club based in San Jose, CA. They have flying sites in San Jose, Santa Clara, >[...]

ANN's Daily Aero-Term (04.24.14): Dew Point (Abbrev. DWPT)

A measure of atmospheric moisture. It is the temperature to which air must be cooled in order to reach saturation (assuming air pressure and moisture content are constant).>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2014 Web Development & Design by Pauli Systems, LC