AD: Boeing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Monday

Tuesday

Wednesday

Thursday

Friday

Airborne On ANN

Airborne 08.24.15

Airborne 08.25.15

Airborne 08.26.15

Airborne 08.27.15

Airborne 08.21.15

Airborne Hi-Def On YouTube

Airborne 08.24.15

Airborne 08.25.15

Airborne 08.26.15

Airborne 08.27.15

Airborne 08.21.15

EAA/ANN AirVenture Innovation Preview

AIP-#1 Vimeo

AIP-#2 Vimeo

AIP-Part 1 YouTube

AIP-Part 2 YouTube

Sat, Jul 19, 2008

AD: Boeing

AD NUMBER: 2008-14-14
MANUFACTURER: Boeing
SUBJECT: Airworthiness Directive 2008-14-14
SUMMARY:
We are adopting a new airworthiness directive (AD) for certain Boeing Model 747-400 and 747-400D series airplanes. This AD requires a general visual inspection of the power feeder wire bundle of the auxiliary power unit (APU) where it crosses the hydraulic system 4 return tube to determine if parts are installed to provide separation between the wire bundle and hydraulic tube.This AD also requires related investigative and corrective actions if necessary. This AD results from a report that the power feeder wire bundle of the APU was found touching the hydraulic system return tube during inspection of an airplane. We are issuing this AD to prevent insufficient clearance bet ween the wire bundle and hydraulic tube that could lead to chafing of the wire bundle, which could cause arcing and a consequent hydraulic fluid fire in an area outside of the smoke detection and fire extinguishing zone; this condition could result in an uncontrolled fire on the airplane.

FMI: www.faa.gov/regulations_policies/airworthiness_directives/

Advertisement

More News

Airborne 08.27.15: Golden Wings Flying Museum, AUVSI v CA, FAA Delays Pilot DB

Also: Join The API!, ATC Goofs... Badly, Shuttle Water Tanks, Herlong Rebrands FBO, Gogo's Next Generation, China A/C Demand, Chatham MA RFP You won’t see us run very many fo>[...]

Boeing Completes 777X Firm Configuration

Milestone Establishes Basic Airplane Design; Program On Track For First Delivery In 2020 Boeing has completed the firm configuration milestone for the 777-9, the first member of th>[...]

Airborne 08.26.15: New U-2?, Carter PAV Update, AK TFR Concerns

Also: Skydive Mid-Air, Classic Aero-TV, United Airlines, Forest Service Policy v Helicopters, WestJet Pilots' Association, NASA Drops Plane, Flightnow in Court Is it possible that >[...]

Airborne 08.27.15: Golden Wings Flying Museum, AUVSI v CA, FAA Delays Pilot DB

Also: Join The API!, ATC Goofs... Badly, Shuttle Water Tanks, Herlong Rebrands FBO, Gogo's Next Generation, China A/C Demand, Chatham MA RFP You won’t see us run very many fo>[...]

AD: Airbus Airplanes

AD NUMBER: AD 2015-17-07 PRODUCT: All Airbus Model A300 B4-603, B4-605R, B4-620, B4-622, B4-622R airplanes; all Airbus Model A300 C4-605R Variant F airplanes; and certain Airbus Mo>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2015 Web Development & Design by Pauli Systems, LC