Embraer Executive Jets Launches Legacy 450 Fabrication | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Monday

Tuesday

Wednesday

Thursday

Friday

Airborne On ANN

Airborne 07.18.16

Airborne 07.19.16

Airborne 07.20.16

Airborne 07.21.16

Airborne 07.22.16

Airborne Hi-Def On YouTube

Airborne 07.18.16

Airborne 07.19.16

Airborne 07.20.16

Airborne 07.21.16

Airborne 07.22.16

Tweet Us The Coolest Things You See @OSH16!
#OSH16Coolest!

It's Alive!: AirVenture 2016 Innovation Preview on Vimeo!

It's Alive!: AirVenture 2016 Innovation Preview on YouTube!

 

Wed, Aug 15, 2012

Embraer Executive Jets Launches Legacy 450 Fabrication

First Parts Milled For The New Bizjet

Embraer Executive Jets passed a major milestone in the mid-light Legacy 450 program last week when the first part was milled for the business jet, ushering in the beginning of fabrication. "Even as we have been making progress on the Legacy 500, we have been anticipating this event for the Legacy 450,” said Ernest Edwards, President, Embraer Executive Jets. “The first metal cut for the Legacy 450 is a landmark event for the program and is the latest step in bringing this, the second of our revolutionary jets to reality.”

A component of the forward fuselage, the part was milled from a block of aluminum alloy by a five-axis, high-performance machining center. Fully automated, the milling process drew data directly from a digital mockup of the 2,300-nm-range Legacy 450. Once completed, the part was approved by a quality control process that employed the use of laser devices for design validation with the digital mockup.
 
The Legacy 450 is designed with the latest engineering software, CATIA V5, with production planning for the business aircraft simulated by digital virtual manufacturing software. The first metal cut comes after the completion of the Joint Definition Phase for the aircraft in May. The Detailed Design and Certification Phase is ongoing and the Critical Design Reviews are scheduled to be completed at the end of August.
 
For both the Legacy 450 and mid-size Legacy 500, Embraer has completed more than 8,000 systems test hours with 2,500 hours logged on the Iron Bird since November 2010. The two aircraft bring fly-by-wire technology to the mid-light and mid-size segments for the first time.

(Images provided by Embraer)

FMI: www.embraer.com


Advertisement

More News

L-3 Aviation Products Presents OSH2016 Special Event Coverage!!!

Innovative Avionics Powerhouse Showcases Latest Developments It's been a great year for L-3 Aviation Products. In less than six months, they've finetuned some ground-breaking produ>[...]

Aspen Avionics, True Innovators, Present OSH2016 Special Event Coverage!

OSH2016 Sponsor: Always-Innovative Aspen Avionics Based in Albuquerque, New Mexico, Aspen Avionics specializes in bringing the most advanced display and sensor technology from the >[...]

Martin Mars Makes Debut At AirVenture Oshkosh 2016

>[...]

Airborne 07.22.16: ONE Aviation New Jet, Drone Pilot Nabbed, Stemme Twin Voyager

Also: AEA Giveaway, 44 Trips To OSH, Airbus Drones, Future Pilots, NTSB Training, Air BP, Boeing Forecast, ALPA Milestone ONE Aviation has provided ANN with the initial outline for>[...]

It's ALIVE! 2016 AirVenture Innovation Preview Program Debuting RIGHT NOW!

Get The EARLY Inside Details On THE Most Exciting NEW Innovations And Product Announcements From OSHKOSH... The staff of EAA and the Aero-News Network are pleased to announce that >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2016 Web Development & Design by Pauli Systems, LC