Embraer Executive Jets Launches Legacy 450 Fabrication | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Monday

Tuesday

Wednesday

Thursday

Friday

Airborne On ANN

Airborne 09.26.16

Airborne 09.27.16

Airborne 09.28.16

Airborne 09.22.16

Airborne 09.23.16

Airborne Hi-Def On YouTube

Airborne 09.26.16

Airborne 09.27.16

Airborne 09.28.16

Airborne 09.22.16

Airborne 09.23.16

Wed, Aug 15, 2012

Embraer Executive Jets Launches Legacy 450 Fabrication

First Parts Milled For The New Bizjet

Embraer Executive Jets passed a major milestone in the mid-light Legacy 450 program last week when the first part was milled for the business jet, ushering in the beginning of fabrication. "Even as we have been making progress on the Legacy 500, we have been anticipating this event for the Legacy 450,” said Ernest Edwards, President, Embraer Executive Jets. “The first metal cut for the Legacy 450 is a landmark event for the program and is the latest step in bringing this, the second of our revolutionary jets to reality.”

A component of the forward fuselage, the part was milled from a block of aluminum alloy by a five-axis, high-performance machining center. Fully automated, the milling process drew data directly from a digital mockup of the 2,300-nm-range Legacy 450. Once completed, the part was approved by a quality control process that employed the use of laser devices for design validation with the digital mockup.
 
The Legacy 450 is designed with the latest engineering software, CATIA V5, with production planning for the business aircraft simulated by digital virtual manufacturing software. The first metal cut comes after the completion of the Joint Definition Phase for the aircraft in May. The Detailed Design and Certification Phase is ongoing and the Critical Design Reviews are scheduled to be completed at the end of August.
 
For both the Legacy 450 and mid-size Legacy 500, Embraer has completed more than 8,000 systems test hours with 2,500 hours logged on the Iron Bird since November 2010. The two aircraft bring fly-by-wire technology to the mid-light and mid-size segments for the first time.

(Images provided by Embraer)

FMI: www.embraer.com


Advertisement

More News

Airborne 09.27.16: EAA's 200K!, MilPilots Get Break, UAV Pilot Applications

Also: GPS Sat, Aero-Calendar, B-21 Raider, Boeing 777X, Tecnam P2002JF, NBAA Honors Louis Seno, Alaska-Virgin Merger EAA has reached a major milestone, as the association has surpa>[...]

BlackSky Pathfinder Satellite Launched Aboard India’s PSLV

Paves The Way For 60-Satellite Constellation To Deliver High-Resolution Satellite Imaging The BlackSky Pathfinder-1 satellite was successuflly launched into a sun synchronous orbit>[...]

Several Injured By Helicopter Rotorwash At Boy Scout Event

Arriving Helo Blew Several Canoes Into A Crowd On Shore It was supposed to be the celebration of the introduction of a new program to introduce young kids to the Boy Scouts. It wou>[...]

FAA: Parachutes Did Not Open In Tandem Jump Accident

First-Time Skydiver And Instructor Fatally Injured In August The FAA has determined that a first time skydiver and his instructor were fatally injured in an accident August 6th, 20>[...]

Southwest Airlines Flight Attendants To Vote On New Agreement

Balloting To Take Place From October 16 - 31 Southwest Airlines Co. has announced that the Executive Board of Transport Workers Union (TWU) Local 556, the Union that represents our>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2016 Web Development & Design by Pauli Systems, LC