Embraer Executive Jets Launches Legacy 450 Fabrication | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Monday

Tuesday

Wednesday

Thursday

Friday

Airborne On ANN

Airborne 07.20.15

Airborne 07.21.15

Airborne 07.22.15

Airborne 07.23.15

Airborne 07.24.15

Airborne Hi-Def On YouTube

Airborne 07.20.15

Airborne 07.21.15

Airborne 07.22.15

Airborne 07.23.15

Airborne 07.24.15

EAA/ANN AirVenture Innovation Preview

AIP-#1 Vimeo

AIP-#2 Vimeo

AIP-Part 1 YouTube

AIP-Part 2 YouTube

Wed, Aug 15, 2012

Embraer Executive Jets Launches Legacy 450 Fabrication

First Parts Milled For The New Bizjet

Embraer Executive Jets passed a major milestone in the mid-light Legacy 450 program last week when the first part was milled for the business jet, ushering in the beginning of fabrication. "Even as we have been making progress on the Legacy 500, we have been anticipating this event for the Legacy 450,” said Ernest Edwards, President, Embraer Executive Jets. “The first metal cut for the Legacy 450 is a landmark event for the program and is the latest step in bringing this, the second of our revolutionary jets to reality.”

A component of the forward fuselage, the part was milled from a block of aluminum alloy by a five-axis, high-performance machining center. Fully automated, the milling process drew data directly from a digital mockup of the 2,300-nm-range Legacy 450. Once completed, the part was approved by a quality control process that employed the use of laser devices for design validation with the digital mockup.
 
The Legacy 450 is designed with the latest engineering software, CATIA V5, with production planning for the business aircraft simulated by digital virtual manufacturing software. The first metal cut comes after the completion of the Joint Definition Phase for the aircraft in May. The Detailed Design and Certification Phase is ongoing and the Critical Design Reviews are scheduled to be completed at the end of August.
 
For both the Legacy 450 and mid-size Legacy 500, Embraer has completed more than 8,000 systems test hours with 2,500 hours logged on the Iron Bird since November 2010. The two aircraft bring fly-by-wire technology to the mid-light and mid-size segments for the first time.

(Images provided by Embraer)

FMI: www.embraer.com


Advertisement

More News

AeroSports Update: Medical Rules For Pilots Without Medicals

Sport Pilots And Glider Pilots Flying Without Medicals Must Comply With Fit-For-Flight Rules In a letter sent to all U.S. Senators, the Airline Pilots Association’s (ALPA) pr>[...]

ANN's Daily Aero-Linx (07.29.15)

Homebuilt Homepage The Homebuilt Homepage is an index and reference on Homebuilt Experimental class aircraft and related information. This is a non-profit website.>[...]

ANN's Daily Aero-Term (07.29.15): Expect Departure Clearance Time

The time issued to a flight to indicate when it can expect to receive departure clearance. EDCTs are issued as part of Traffic Management Programs, such as a Ground Delay Program (>[...]

Aero-News: Quote Of The Day (07.29.15)

“The avionics repair shop industry in the U.S. has only 53 months remaining to equip the entire general aviation fleet of more than 100,000 aircraft with ADS-B Out equipment.>[...]

ANN FAQ: Getting The Word Out

Things To Know When You Send A News Release Aero-News gets hundreds of releases every week, ranging from industry giants like Boeing and Cessna to the smallest of flying clubs and >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2015 Web Development & Design by Pauli Systems, LC