Rolls-Royce Achieves New Trent 1000 Milestone | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** Airborne 07.25.14--CLICK HERE! ** HD iPad-Friendly Version--Airborne 07.25.14 **
** Airborne 07.23.14--CLICK HERE! ** HD iPad-Friendly Version--Airborne 07.23.14 **
** Airborne 07.21.14--CLICK HERE! ** HD iPad-Friendly Version--Airborne 07.21.14 **

Thu, May 10, 2012

Rolls-Royce Achieves New Trent 1000 Milestone

Launch Engine For The 787-9 Airliner

The first run of an upgraded version of the Trent 1000 that will be the launch engine for the latest member of the Boeing 787 Dreamliner family, the 787-9 has been completed by Rolls-Royce. The Trent 1000 Package C program will provide 74,000lb thrust for the 787-9 Dreamliner aircraft, which is due to enter service with Air New Zealand in 2014. Trent 1000 Package C engines will also begin powering 787-8 aircraft that enter service later in 2014.

The engine began running on a test bed in Derby in April and is scheduled to complete an extensive test programme over the next eight weeks. Two Trent 1000 Package C engines are now being built for initial flight testing on the Rolls-Royce 747-200 flying test bed, with a three-month programme scheduled to begin in the summer which will optimise a new advanced turbine case cooling system to improve efficiency. Rolls-Royce will deliver production standard Trent 1000 Package C engines to Boeing from 2013 to support its 787-9 flight test program.

Simon Carlisle, Rolls-Royce, Programme Director – Trent 1000, said: “This is another important chapter in the evolution of the Trent 1000 as we prepare for the launch of the next member of the 787 Dreamliner family. Our in-service experience on the Boeing Dreamliner and our rigorous improvement programs give us the platform to deliver the best engine for the 787-9.”

Trent 1000 Package C has been optimized to deliver a fuel burn improvement of 1% over the Package B engine standard. The Trent 1000 powered the Boeing 787 Dreamliner’s entry into service with All Nippon Airways (ANA) in October 2011 and has now completed more than 7,000 flying hours with a 99.9% dispatch reliability – a record for a widebody engine.

FMI: www.rolls-royce.com

Advertisement

More News

Opening Day Is Just Moments Away

AirVenture Is Coming To Life At Wittman Regional Airport There was a high overcast over Wittman Regional Airport Saturday afternoon, and a breeze from west was threatening to bring>[...]

AOPA Exits EFB Market

Apps Will Transition To Outside Company AOPA is exiting the electronic flight bag (EFB) market, and the association’s existing products, the FlyQ EFB iPad application and rel>[...]

Aero-News: Quote Of The Day (07.27.14)

"The AEA is thrilled to debut this year's Pilot's Guide to Avionics at AirVenture, and our staff looks forward to giving complimentary copies to all the pilots and aircraft owners >[...]

Polk County FL Sheriff Takes Delivery Of Second MD500E

New Helicopter To Increase Support, Safety And Effectiveness Of Law Enforcement Missions MD Helicopters held a ceremonial delivery of a new MD 500E helicopter for the Polk County, >[...]

New Edition Of AEA's Pilot's Guide To Avionics Available At Oshkosh

Free Distribution Begins At AirVenture Published annually by the Aircraft Electronics Association, the 2014-15 edition of the Pilot's Guide to Avionics will be unveiled with free d>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2014 Web Development & Design by Pauli Systems, LC