The Skies Are A Little Smaller: Second Boeing Dreamlifter Takes Flight | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Monday

Tuesday

Wednesday

Thursday

Friday

Airborne On ANN

Airborne 08.31.15

Airborne 09.01.15

Airborne 09.02.15

Airborne 09.03.15

Airborne 08.28.15

Airborne Hi-Def On YouTube

Airborne 08.31.15

Airborne 09.01.15

Airborne 09.02.15

Airborne 09.03.15

Airborne 08.28.15

EAA/ANN AirVenture Innovation Preview

AIP-#1 Vimeo

AIP-#2 Vimeo

AIP-Part 1 YouTube

AIP-Part 2 YouTube

Sun, Feb 18, 2007

The Skies Are A Little Smaller: Second Boeing Dreamlifter Takes Flight

Certification Of Three-Plane Fleet Expected In Next Few Months

ANN has learned Boeing's second uberjumbo Dreamlifter, a specially modified 747-400 used to transport major composite structures of the upcoming 787 Dreamliner, completed its first flight Friday in Taipei.

Piloted by Boeing Flight Test Pilots Jerry Whites and Gary Meiser, the Dreamlifter took off from Taiwan Taoyuan International Airport at 10:34 a.m. and flew for three hours and eight minutes. Reports indicate the airplane -- already wearing its distinctive white and blue livery of the Dreamlifter fleet -- handled well during the routine flight.

This Dreamlifter is expected in Washington State within the next few weeks. As Aero-News reported, the first of the unique fleet arrived in Seattle last September.

Evergreen Aviation Technologies Corp., part of Taiwan's Evergreen Group, is modifying the fleet of three airplanes at its facility at the airport. The first Dreamlifter delivered the first 787 major assemblies from Nagoya, Japan, to Charleston, SC last month.

After several delays late last year, the Dreamlifter's flight test program is proceeding well, with certification from the US Federal Aviation Administration expected over the next few months. Already, the Dreamlifter has completed more than 1,000 hours of flight and ground testing combined.

"The delays we experienced earlier in the flight test program will not impact our overall 787 schedule," said Scott Strode, vice president of Airplane Definition and Production for the 787 program. "The entire global logistics system, including the Dreamlifter's mobile tail support and cargo loader, is working extremely well."

FMI: www.boeing.com

Advertisement

More News

Aerospace Update: Swiss Team Wins Gordon Bennett Balloon Race

The Swiss Team of Kurt Frieden And Pascal Witprächtiger Won The 59th Coupe Aéronautique Gordon Bennett Competition The Coupe Aéronautique Gordon Bennett, the FAI>[...]

ANN's Daily Aero-Linx (09.03.15)

NASA JPL Education Site The Education home page for NASA JPL is the perfect place for parents and teachers to find activities for a budding rocket scientist, engineer, technician, >[...]

ANN's Daily Aero-Term (09.03.15): Magnetic Variation

Difference between true north and magnetic north, varying with position; magnetic variation drifts with time.>[...]

Aero-News: Quote Of The Day (09.03.15)

“We want this to be a gateway to aviation, and for the existing industry to embrace these craft.” Source: AUVSI president and CEO Brian Wynne.>[...]

Woman Who Suffered From Septic Shock Skydives For First Time

Jump Follows Amputation Of Both Hands And Feet, Done To Raise Awareness Of The Condition A woman in Oklahoma who lost both hands and feet to septic shock last year has done somethi>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2015 Web Development & Design by Pauli Systems, LC