First Fuselage Section For The A330-200F Freighter Delivered | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** Airborne 11.21.14 ** HD iPad-Friendly -- Airborne 11.21.14 **
** Airborne 11.19.14 ** HD iPad-Friendly -- Airborne 11.19.14 **
** Airborne 11.17.14 ** HD iPad-Friendly -- Airborne 11.17.14 **

Sat, May 02, 2009

First Fuselage Section For The A330-200F Freighter Delivered

Airbus' A330-200F program marked an important milestone with the recent delivery of the first major fuselage section for Airbus' new mid-size freighter. Assembled at the Airbus facility in Hamburg, Germany, this 11.6 metre-long forward fuselage section includes the A330-200F's large main-deck cargo door - which will enable the jetliner to carry cargo containers and freight pallets in a single row or in side-by-side arrangements, according to operators' needs.

The main deck cargo door is 141 inches wide and 101 inches high, and is a new feature for the A330 family. This same-sized door has been used on Airbus A300 and A310 cargo aircraft.

Delivery of the A330-200F's forward fuselage section was performed by one of the Airbus Beluga airlifters, which transported the airframe component from Hamburg to St. Nazaire, France for assembly of the cockpit. The completed section will then move to Toulouse, France, where final assembly of the no. 1 A330-200F will begin in the summer, followed by the aircraft's maiden flight later this year.

Jürgen Karow, the head of Airbus' Long-range Programme Centre of Excellence for fuselage and cabin, said targets have been met for the new freighter's quality, production timing and weight - achievements that are the result of cooperative efforts involving the Airbus design office and manufacturing department, as well as the associated suppliers.

 

The A330-200F will provide operators with a new-generation freighter derived from the A330 jetliner family.

FMI: www.airbus.com

Advertisement

More News

Airborne 11.21.14: AEA's 3Q/14 Report, Fantasy Of Flight, Modernizing The NAS

Also: Holland Wants Gold, FAA Strangling UAVs?, RAF WWII Trainer For Sale, Bf109s Live, Georgia v Aerospace Engineers The Aircraft Electronics Association has released its third-qu>[...]

Aero-News: Quote Of The Day (11.23.14)

"Reaching this stage that we call ATLO is a critical milestone. This is a very satisfying point of the mission as we transition from many teams working on their individual elements>[...]

ANN FAQ: Getting The Most Out Of ANN's Newsletters

ANN goes through a lot of trouble to make the graphics flashy and cool and an integral part of the story. But let's face it, they're bandwidth-intensive. So here are a couple of th>[...]

Air Force Funds Research On Thermal Management Technology For Fighters

Heat Generated By Electronic Systems A Growing Challenge Managing heat that is generated by electronic subsystems in next-generation aircraft is a vexing challenge for aerospace sy>[...]

Raytheon Successfully Demonstrates Airborne Electronic Attack System

Prototype Test Flights Evaluate Integrated Electronic Warfare Capabilities The U.S. Navy and Raytheon successfully demonstrated an end to end, first of its kind, integrated electro>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2014 Web Development & Design by Pauli Systems, LC