Endeavour Countdown Set To Begin Again | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Monday

Tuesday

Wednesday

Thursday

Friday

Airborne On ANN

Airborne 05.23.16

Airborne 05.24.16

Airborne 05.25.16

Airborne 05.19.16

Airborne 05.20.16

Airborne Hi-Def On YouTube

Airborne 05.23.16

Airborne 05.24.16

Airborne 05.25.16

Airborne 05.19.16

Airborne 05.20.16

AEA2016 LIVE Aero-TV: 04/27-0830ET, 04/28-1400ET, 04/29-1100ET

Sun 'n Fun 2016 Innovation Preview on Vimeo!

Sun 'n Fun 2016 Innovation Preview on YouTube!

Fri, Jul 03, 2009

Endeavour Countdown Set To Begin Again

Launch Planned For July 11th

Launch preparations are under way at NASA's Kennedy Space Center in Florida following Wednesday's successful test fueling of space shuttle Endeavour's external tank.

Two previous attempts to launch Endeavour on the STS-127 mission were halted by a leak in the area of the Ground Umbilical Carrier Plate, which attaches a gaseous hydrogen vent line to the external tank. After several days of investigation and repair work, the massive orange tank was filled with liquid hydrogen and liquid oxygen as controllers watched for evidence of leaks. The system performed well, verifying the success of the repair.

"There were absolutely no leak indications whatsoever noted on the two leak detectors," said Launch Director Pete Nickolenko. "We'll continue to look at the data, and our next step is to move toward launch."

Endeavour's astronauts are taking the holiday weekend off and will go into quarantine Sunday evening. They are due to arrive at Kennedy on July 7th. The countdown will officially begin Wednesday at 2200 when clocks begin ticking backward from T-43 hours. Liftoff is set for July 11 at 1939.

FMI: www.nasa.gov

Advertisement

More News

Icon Controversy Continues, But Icon Has Yet To Speak Up

The Company That Won't Answer Questions, May Finally Have To Do So ANN has been bombarded with info and reports concerning the health and well-being of the Icon Aircraft program...>[...]

Airborne 05.24.16: Cessna S/E Turbo-Prop, GE’s H75 Turboprop, Sonex B-Models

Also: B-29 Doc Airworthy, Aero-Calendar, Charles Taylor, Boeing-Vietjet, Flexjet Buy, Indian Mini-Shuttle, 777X Composite Wing Center Textron Aviation has finally revealed further >[...]

AeroSports Update: EAA AirVenture – What To Do…Where To Go?

Make The ‘EAA Four Corners’ Your First Stop At EAA AirVenture Oshkosh 2016 Even for those of us who have attended EAA AirVenture many times, when you first walk onto th>[...]

ANN's Daily Aero-Linx (05.25.16)

The Medallion Foundation The Medallion Foundation, a non-profit aviation safety organization, embraces mentors and advocates for all aspects of aviation: Student pilots to airline >[...]

ANN's Daily Aero-Term (05.25.16): Resolution Advisory

A display indication given to the pilot by the traffic alert and collision avoidance systems (TCAS II) recommending a maneuver to increase vertical separation relative to an intrud>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2016 Web Development & Design by Pauli Systems, LC