Discovery Engines Removed Due To Turbopump Problem | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Monday

Tuesday

Wednesday

Thursday

Friday

Airborne On ANN

Airborne 08.29.16

Airborne 08.30.16

Airborne 08.31.16

Airborne 09.01.16

Airborne 08.26.16

Airborne Hi-Def On YouTube

Airborne 08.29.16

Airborne 08.30.16

Airborne 08.31.16

Airborne 09.01.16

Airborne 08.26.16

Tweet Us The Coolest Things You See @OSH16!
#OSH16Coolest!

It's Alive!: AirVenture 2016 Innovation Preview on Vimeo!

It's Alive!: AirVenture 2016 Innovation Preview on YouTube!

 

Thu, Jun 24, 2010

Discovery Engines Removed Due To Turbopump Problem

Engineers Say It Should Not Create A Delay For STS-133

Space shuttle Discovery will have its three main engines removed after a low-pressure oxidizer turbopump on engine 1 had an issue during a torque check. All three engines have to be removed to allow access to remove the center engine. The pump will be sent to Canoga Park, CA, for repair.

Engineers considered several alternatives, including whether to wait for the engine and its new turbopump or to install another engine in Discovery that was slated for use on Endeavour. The engine work is not a hindrance to processing and is not expected to prompt a delay for the launch of the STS-133 mission. Removal of the three main engines is planned for Thursday, and it was determined that the turbopump should be replaced and the engines will be reinstalled.

Meanwhile, technicians completed Discovery's payload premate test Wednesday. The drag chute door installation and checkout was completed Tuesday night.  The astronauts continue their training at NASA's Johnson Space Center in Houston for the STS-133 mission, with the crew members are working on robotics tasks they will use during the flight to the International Space Station. They are also undergoing refresher training on International Space Station systems.

FMI: www.nasa.gov

Advertisement

More News

Airborne 08.30.16: Commercial UAS Takes-Off, SWA Engine Failure, MH370 Debris

Also: Humans-To-Mars, Burgess-Wright Model-F, Aero-Calendar, Sport CFI NPRM, Air Safety Forum, Stemme Tragedy, PowerEgg As we reported in our Monday edition of Airborne Unlimited, >[...]

Airborne 08.29.16: sUAS Rules Get REAL, Pilots To The Rescue, ISS Update

Also: AA MD-80s, A320 Birdstrike, SWA Picketed, Randy Babbitt, STEREO Mission, Prince Harry v Poachers, ANA Dreamliners August 29 is a big day as it relates to recreational and non>[...]

Airborne 08.30.16: Commercial UAS Takes-Off, SWA Engine Failure, MH370 Debris

Also: Humans-To-Mars, Burgess-Wright Model-F, Aero-Calendar, Sport CFI NPRM, Air Safety Forum, Stemme Tragedy, PowerEgg As we reported in our Monday edition of Airborne Unlimited, >[...]

ANN's Daily Aero-Linx (08.31.16)

General Aviation ADS-B Rebate Program Latest updates from the FAA concerning its efforts to help pilots meet the 2020 deadline for ADS-B Out equipage.>[...]

AD: RUAG Aerospace Services GmbH Airplanes

AD NUMBER: 2016-17-05 PRODUCT: RUAG Aerospace Services GmbH Models 228-100, 228-101, 228-200, 228-201, 228-202, and 228-212 airplanes.>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2016 Web Development & Design by Pauli Systems, LC