Discovery Engines Removed Due To Turbopump Problem | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Most Recent Daily Airborne

Airborne On ANN

Airborne On YouTube/Hi-Def/Mac Friendly

Monday

Airborne 01.26.15

Airborne 01.26.15

Tuesday

Airborne 01.27.15

Airborne 01.27.15

Wednesday

Airborne 01.28.15

Airborne 01.28.15

Thursday

Airborne 01.29.15

Airborne 01.29.15

Friday

Airborne 01.30.15

Airborne 01.30.15

Thu, Jun 24, 2010

Discovery Engines Removed Due To Turbopump Problem

Engineers Say It Should Not Create A Delay For STS-133

Space shuttle Discovery will have its three main engines removed after a low-pressure oxidizer turbopump on engine 1 had an issue during a torque check. All three engines have to be removed to allow access to remove the center engine. The pump will be sent to Canoga Park, CA, for repair.

Engineers considered several alternatives, including whether to wait for the engine and its new turbopump or to install another engine in Discovery that was slated for use on Endeavour. The engine work is not a hindrance to processing and is not expected to prompt a delay for the launch of the STS-133 mission. Removal of the three main engines is planned for Thursday, and it was determined that the turbopump should be replaced and the engines will be reinstalled.

Meanwhile, technicians completed Discovery's payload premate test Wednesday. The drag chute door installation and checkout was completed Tuesday night.  The astronauts continue their training at NASA's Johnson Space Center in Houston for the STS-133 mission, with the crew members are working on robotics tasks they will use during the flight to the International Space Station. They are also undergoing refresher training on International Space Station systems.

FMI: www.nasa.gov

Advertisement

More News

Citizen Scientists Lead Astronomers To Mystery Objects In Space

'Yellow Balls' Discovered By Volunteers Studying Spitzer Images Sometimes it takes a village to find new and unusual objects in space. Volunteers scanning tens of thousands of star>[...]

Aero-News: Quote Of The Day (02.01.15)

"While this star formed a long time ago, in fact before most of the stars in the Milky Way, we have no indication that any of these planets have now or ever had life on them. At th>[...]

ANN's Daily Aero-Term (02.01.15): Final Approach Fix

Final Approach Fix The fix from which the final approach (IFR) to an airport is executed and which identifies the beginning of the final approach segment. It is designated on Gover>[...]

Air Ambulance Market Size, Vendor Landscape Analyzed In New Report

New Global Air Ambulance Research Report Shows Projected Growth Of Nearly Ten Percent The Global Air Ambulance market is expected to grow at a CAGR (Compound Annual Growth Rate) of>[...]

US Navy Approves F/A-18 IRST System For Production

Long-Range Sensor System Demonstrated Production Readiness On Super Hornet The F/A-18 Super Hornet infrared search and track (IRST) system, developed and integrated by Boeing and L>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2015 Web Development & Design by Pauli Systems, LC