NASA Optimistic About July Launch Date For Discovery | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.09.24

Airborne-Unlimited-04.10.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Wed, Apr 26, 2006

NASA Optimistic About July Launch Date For Discovery

Griffin: "We're In Pretty Good Shape"

NASA officials are guardedly optimistic about meeting deadlines for a scheduled July launch for the space shuttle Discovery... especially since they have some built-in time to handle any last-minute delays.

"There is two weeks of schedule margin to preserve the July 1 launch date," Administrator Michael D. Griffin said last week. "We're in pretty good shape."

That might be the best news to come from the shuttle program in some time, as already the shuttle's second return to flight has been plagued with industrial accidents at the Kennedy Space Center, ongoing questions about the foam that encases Discovery's external fuel tank, and concerns about other shuttle systems.

NASA needs to fly the shuttles twice a year between now and 2010 to keep up with its ambitious schedule for completion of the International Space Station.

Still, NASA says it's confident that the shuttle will fly in July -- after being delayed for a couple of months because of ongoing concerns about the fuel tank foam and how it might impact the orbiter.

Griffin told C-SPAN he's not worried... not unless more delays push this next flight off until after the end of the year.

The next big hurdle for Discovery? A series of wind tunnel tests on the new foam design -- which removed a large ramp that once protected fuel system plumbing and electrical connections from aerodynamic loads during launch.

FMI: www.nasa.gov

Advertisement

More News

Classic Aero-TV: The Switchblade Flying Car FLIES!

From 2023 (YouTube Versions): Flying Motorcycle, That Is… "First Flight was achieved under cloudy skies but calm winds. The Samson Sky team, positioned along the runway, wat>[...]

ANN FAQ: Q&A 101

A Few Questions AND Answers To Help You Get MORE Out of ANN! 1) I forgot my password. How do I find it? 1) Easy... click here and give us your e-mail address--we'll send it to you >[...]

ANN's Daily Aero-Term (04.12.24): Discrete Code

Discrete Code As used in the Air Traffic Control Radar Beacon System (ATCRBS), any one of the 4096 selectable Mode 3/A aircraft transponder codes except those ending in zero zero; >[...]

ANN's Daily Aero-Term (04.13.24): Beyond Visual Line Of Sight (BVLOS)

Beyond Visual Line Of Sight (BVLOS) The operation of a UAS beyond the visual capability of the flight crew members (i.e., remote pilot in command [RPIC], the person manipulating th>[...]

ANN's Daily Aero-Linx (04.13.24)

Aero Linx: Florida Antique Biplane Association "Biplanes.....outrageous fun since 1903." That quote really defines what the Florida Antique Biplane Association (FABA) is all about.>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC