NASA Awards Contracts For Orion Heat Shield Material | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, May 08, 2007

NASA Awards Contracts For Orion Heat Shield Material

Agency Seeks Reliable Backup Options

NASA announced Friday it selected The Boeing Company and Textron Systems to develop alternate heat shield materials for the Orion crew exploration spacecraft.

The two contracts for Alternate Block 2 Thermal Protection System (TPS) Materials and Heat Shield Systems Advanced Development will support development and testing of three alternative heat shield materials. The companies are challenged with developing technologies can be used as backups for the primary material, according to NASA.

Orion is scheduled to carry astronauts to the International Space Station by 2015, with a goal of landing astronauts on the moon by 2020. The Orion TPS Advanced Development Project, led by Ames Research Center, Moffett Field, CA was established to develop a heat shield to protect Orion during its return from low-Earth orbit or the moon.

In September 2006, Boeing was awarded a contract to develop the primary heat shield material, Phenolic Impregnated Carbon Ablator (PICA), manufactured by its subcontractor, Fiber Materials, Inc. based in Biddeford, ME. It will only develop the alternate material if the primary material does not perform to Orion Project specifications. NASA will assess and evaluate all of the Alternate Block 2 TPS materials through initial testing and select the most promising of the materials for further development, if needed.

The value of the Boeing contract is approximately $10 million and calls for Boeing to perform early investigation of a proprietary material, the Boeing Phenolic Ablator (BPA). Textron's contract has a value of about $24 million calls for early investigation of two proprietary material options, Avcoat, which was also used on Apollo, and Dual Layer.

Each contract has a 16-month performance period from May 4, 2007 until August 31, 2008, according to NASA.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (04.20.24): Light Gun

Light Gun A handheld directional light signaling device which emits a brilliant narrow beam of white, green, or red light as selected by the tower controller. The color and type of>[...]

Aero-News: Quote of the Day (04.20.24)

"The journey to this achievement started nearly a decade ago when a freshly commissioned Gentry, driven by a fascination with new technologies and a desire to contribute significan>[...]

ANN's Daily Aero-Linx (04.21.24)

Aero Linx: JAARS, Inc. For decades now, we’ve landed planes on narrow rivers and towering mountains. We’ve outfitted boats and vehicles to reach villages that rarely se>[...]

Aero-News: Quote of the Day (04.21.24)

"Our driven and innovative team of military and civilian Airmen delivers combat power daily, ensuring our nation is ready today and tomorrow." Source: General Duke Richardson, AFMC>[...]

ANN's Daily Aero-Term (04.21.24): Aircraft Conflict

Aircraft Conflict Predicted conflict, within EDST of two aircraft, or between aircraft and airspace. A Red alert is used for conflicts when the predicted minimum separation is 5 na>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC