CASA Urgent AD: BAe Avro 146-RJ | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Monday

Tuesday

Wednesday

Thursday

Friday

Airborne On ANN

Airborne 07.20.15

Airborne 07.21.15

Airborne 07.22.15

Airborne 07.23.15

Airborne 07.24.15

Airborne Hi-Def On YouTube

Airborne 07.20.15

Airborne 07.21.15

Airborne 07.22.15

Airborne 07.23.15

Airborne 07.24.15

EAA/ANN AirVenture Innovation Preview

AIP-#1 Vimeo

AIP-#2 Vimeo

AIP-Part 1 YouTube

AIP-Part 2 YouTube

Tue, Apr 26, 2005

CASA Urgent AD: BAe Avro 146-RJ

AD Number: AD/BAe 146/114 Center Fuselage Skin 6/2005 DM
Applicability:
Model AVRO 146-RJ Series aircraft.
Requirement: 1. Establish from the aircraft’s technical records whether the aircraft has previously been inspected in accordance with British Aerospace (Operations) Ltd Avro 146-RJ Maintenance Review Board Report (MRBR) Issue 10 Task SSI 53-20-138 (Maintenance Planning Document Task References 532038DVI-DVI-10000-1 and 532038-DVI-10000-2).

2. If the inspection has not been previously accomplished, perform a detailed visual inspection of the external fuselage skin adjacent to the longeron at rib 0 from frame 29 to frame 31 in accordance with BAE Systems (Operations) Service Bulletin ISB 53-177, or later EASA approved revision.

3. Following accomplishment of the initial inspection in accordance with MRBR Task SSI 53-20-138 or Requirement 2 of this Directive, perform all repeat inspections.

Background: The manufacturer has determined that in order to assure the continued structural integrity of the fuselage skin adjacent to the rib 0 longeron between frames 29 to 31 of the AVRO 146-RJ aircraft, a revised inspection program for this area is considered necessary. Cracking, if undetected, could lead to catastrophic structural failure.

FMI: www.casa.gov.au

Advertisement

More News

Airborne At OSH15 Day 5 Redux: Inhofe's Mission, NextGen GA Fund, New Kitfox

Also: Cicare 8, Switchblade Update, Beringer Alaskan Bush Gear, Jack Pelton Interview - Final E-I-C Note: Regularly Daily Airborne Unlimited Programming will resume this Monday now>[...]

ANN's Daily Aero-Linx (08.01.15)

The BD-5 Web Site The official home of the BD-5 network, the purpose of this web site is to provide information about the Bede Aircraft BD-5, an experimental, homebuilt, single-sea>[...]

ANN's Daily Aero-Term (08.01.15): Notice To Airmen (NOTAM)

A notice containing information (not known sufficiently in advance to publicize by other means) concerning the establishment, condition, or change in any component (facility, servi>[...]

Aero-News: Quote Of The Day (08.01.15)

"The fairing separation is one of our very first critical events. If it doesn't work as planned, it's probable the mission cannot continue." Source: Mike Hawes, Lockheed Martin Ori>[...]

ANN FAQ: Aero-Twitters Offer Instant Alerts For Breaking News

Say Hello To Aero-Twitter! Twitter is designed to work on a mobile phone as well as on a computer (and can be accessed via your IM clients). All Twitter messages (called "Tweets", >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2015 Web Development & Design by Pauli Systems, LC