Fed-Ex Latest To Be Fined By The FAA | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, May 21, 2010

Fed-Ex Latest To Be Fined By The FAA

Administration Proposes $1.55 Million Civil Penalty For Maintenance Program

The FAA has proposed a $1.55 million civil penalty against Federal Express for allegedly failing to revise its Continuous Airworthiness Maintenance Program in accordance with FAA regulations.

Federal Express allegedly failed to ensure that the air carrier used approved standards, inspections, and time limitations for 14 cargo Unit Load Devices (ULDs) used on the company's airplanes beginning in early 2008. The civil penalty addresses 124 flights from March 20 to April 17, 2008. Aircraft ULDs are sophisticated containers with integral pallets that are used to load freight.

"When it comes to maintenance, it's unacceptable for any air carrier not to meet the FAA's standards," said FAA Administrator Randy Babbitt.

During a routine surveillance from March 14-20, 2008, FAA inspectors determined that Federal Express had failed to incorporate Technical Standard Orders (TSOs) into its Continued Airworthiness Maintenance Program for 14 cargo ULDs. The TSOs contain specific maintenance instructions for the ULD smoke detector, power distribution feed, and batteries. Federal Express could not ensure that it used approved maintenance standards for the 14 newly installed ULDs because the company failed to make the necessary revisions to its program for overhauling and inspecting the devices.

On March 20, 2008, Federal Express was notified of the problem by the FAA but did not make the necessary revisions to its Continuous Airworthiness Maintenance Program until April 17, 2008.

Federal Express has 30 days from the receipt of the FAA's civil penalty letter to respond to the agency.

FMI: www.faa.gov

Advertisement

More News

ANN's Daily Aero-Linx (04.16.24)

Aero Linx: International Business Aviation Council Ltd IBAC promotes the growth of business aviation, benefiting all sectors of the industry and all regions of the world. As a non->[...]

Aero-News: Quote of the Day (04.16.24)

"During the annual inspection of the B-24 “Diamond Lil” this off-season, we made the determination that 'Lil' needs some new feathers. Due to weathering, the cloth-cove>[...]

Airborne 04.10.24: SnF24!, A50 Heritage Reveal, HeliCycle!, Montaer MC-01

Also: Bushcat Woes, Hummingbird 300 SL 4-Seat Heli Kit, Carbon Cub UL The newest Junkers is a faithful recreation that mates a 7-cylinder Verner radial engine to the airframe offer>[...]

Airborne 04.12.24: SnF24!, G100UL Is Here, Holy Micro, Plane Tags

Also: Seaplane Pilots Association, Rotax 916’s First Year, Gene Conrad After a decade and a half of struggling with the FAA and other aero-politics, G100UL is in production a>[...]

Airborne-Flight Training 04.17.24: Feds Need Controllers, Spirit Delay, Redbird

Also: Martha King Scholarship, Montaer Grows, Textron Updates Pistons, FlySto The FAA is hiring thousands of air traffic controllers, but the window to apply will only be open for >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC