Thu, Sep 28, 2006
Features Advanced Emergency Disconnect System
Just as Boeing announcedit was looking at a tanker variant of its
777 to compete for a lucrative USAF tanker contract,
Boeing began flight tests on its fifth-generation aerial refueling
boom installed on the original KC-767 tanker prototype.
With a control system developed by Smiths Aerospace, the new
boom features a fully fly-by-wire control system -- which Smiths
says is more responsive, and gives the operator more precise
control of the boom.
The flight tests are to demonstrate integration between the new
control system and the boom operator. Boeing says the new boom is
the same size and shape as the previous systems... but claims the
new control system will make it more capable and reliable.
Also on the new boom is a full-time, independent disconnect
system -- or IDS. Boom operators onboard the USAF's current KC-135
workhorse rely on a functioning receiver air refueling system to
give them the ability to disconnect. Signals from the boom operator
through the boom direct the receiver's latching mechanism to
release the boom.
However, if the receiver's system malfunctions, the operator --
who is in the best position to see a developing emergency -- might
not be able to disconnect immediately using the old system. That
problem is addressed with the IDS -- which forces a disconnect
independent of the receiver's system.
Boom testing will run for several weeks and is the first in a
series of extensive air-refueling tests that will be conducted in
upcoming months. As of September 21, the KC-767 Tanker has logged
more than 129 flights and about 380 hours.
Both Italy and Japan have purchased the KC-767... both expecting
to take delivery in 2007.
More News
Aero Linx: International Business Aviation Council Ltd IBAC promotes the growth of business aviation, benefiting all sectors of the industry and all regions of the world. As a non->[...]
"During the annual inspection of the B-24 “Diamond Lil” this off-season, we made the determination that 'Lil' needs some new feathers. Due to weathering, the cloth-cove>[...]
Also: Bushcat Woes, Hummingbird 300 SL 4-Seat Heli Kit, Carbon Cub UL The newest Junkers is a faithful recreation that mates a 7-cylinder Verner radial engine to the airframe offer>[...]
Also: Seaplane Pilots Association, Rotax 916’s First Year, Gene Conrad After a decade and a half of struggling with the FAA and other aero-politics, G100UL is in production a>[...]
Also: Martha King Scholarship, Montaer Grows, Textron Updates Pistons, FlySto The FAA is hiring thousands of air traffic controllers, but the window to apply will only be open for >[...]