Boeing's McNerney Says Fastener Shortage To Blame For 787 Delays | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Wed, Sep 12, 2007

Boeing's McNerney Says Fastener Shortage To Blame For 787 Delays

Points Finger At Alcoa, Others

A plane can't fly if it's in pieces... and Boeing is facing a dearth of permanent fasteners for its first 787. That's the word from Boeing CEO Jim McNerney, who pointed his finger at Alcoa Inc. and others Tuesday as reasons why the company had to postpone the first flight of the composite-bodied Dreamliner.

"The supply chain is just gradually catching up," McNerney (right) told investors during a teleconference, according to Reuters. "We are making progress -- it's still a scramble though, if I'm honest."

As ANN reported, Boeing announced last week the first 787 test flight would be postponed until mid-November -- or even later -- due to problems with assembly, and flight software systems integration. A shortage of permanent fasteners to hold segments of the plane's composite barrel-section fuselage is considered the main problem facing Boeing, however.

Suppliers may not be entirely to blame for the shortage... as the industry as a whole is still struggling to return to pre-9/11 production levels. Boeing wasn't caught unaware of a problem, either... as the planemaker said in March a shortage of the critical parts was looming.

McNerney conceded many didn't anticipate the growth seen in the commercial airliner market over the past few years. He did imply, however, that many companies could have done a better job of ramping up their operations.

"You know the root cause here -- the fastener industry got consolidated, post 9/11," said McNerney. "The consolidators misjudged the demand swingback -- a lot of us misjudged the demand swingback -- post 9/11."

Alcoa is the main supplier of aluminum and titanium fasteners for the 787; the planemaker hasn't publicly identified other companies, if any, supplying those parts for the program.

A spokesman for Alcoa says the company is doing all it can to catch up. "We are working with them (Boeing) to try to get them as many fasteners as we possibly can for this program," said Kevin Lowery. "Every day we are getting them more and more -- we are making great progress."

Boeing used temporary fasteners to assemble the first 787 in time to unveil during a July 8 ceremony. The aircraft was little more than an empty shell at that point, lacking many internal systems. Engineers are still working at pulling out those temp bolts, and replacing them with permanent fasteners.

"We have a lot of temporary fasteners in that first airplane, that are now being reworked," McNerney said. "The supply chain is just gradually catching up."

He defended Boeing's assertion that despite the delay in first flight -- termed a "stutter-step" by McNerney -- the planemaker will still be able to fully test and certify the Dreamliner in time for its planned May 2008 entry-into-service with All Nippon Airways.

"It's an aggressive plan, but it has substance to it," he said.

FMI: www.boeing.com, www.alcoa.com

Advertisement

More News

ANN's Daily Aero-Linx (04.15.24)

Aero Linx: International Flying Farmers IFF is a not-for-profit organization started in 1944 by farmers who were also private pilots. We have members all across the United States a>[...]

Classic Aero-TV: 'No Other Options' -- The Israeli Air Force's Danny Shapira

From 2017 (YouTube Version): Remembrances Of An Israeli Air Force Test Pilot Early in 2016, ANN contributor Maxine Scheer traveled to Israel, where she had the opportunity to sit d>[...]

Aero-News: Quote of the Day (04.15.24)

"We renegotiated what our debt restructuring is on a lot of our debts, mostly with the family. Those debts are going to be converted into equity..." Source: Excerpts from a short v>[...]

Airborne 04.16.24: RV Update, Affordable Flying Expo, Diamond Lil

Also: B-29 Superfortress Reunion, FAA Wants Controllers, Spirit Airlines Pulls Back, Gogo Galileo Van's Aircraft posted a short video recapping the goings-on around their reorganiz>[...]

ANN's Daily Aero-Term (04.16.24): Chart Supplement US

Chart Supplement US A flight information publication designed for use with appropriate IFR or VFR charts which contains data on all airports, seaplane bases, and heliports open to >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC