Delayed 787 Center Fuselage Segment Arrives In Everett | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Wed, Aug 06, 2008

Delayed 787 Center Fuselage Segment Arrives In Everett

Final Assembly Begins On Fourth Test Plane

Following a five-week delay due to damage at the production facility, this week the center-fuselage section of Boeing's fourth 787 Dreamliner arrived at the planemaker's assembly center in Everett, WA.

The Seattle Times reports the Section 44 midbody barrel arrived Monday night, hours after the aircraft's nose section came in from Wichita. Crews began joining the sections of Dreamliner #4 Tuesday.

As ANN reported, the 84-foot-long center fuselage segment was damaged during assembly at Global Aeronautica in Charleston, SC in late June, after a technician improperly drilled fastener holes in the composite assembly. That worker, a mechanic at Boeing's partner company Alenia, was fired.

It's not yet known how the delay will affect Boeing's already-tight flight test schedule for the 787. The first Dreamliner is slated to fly in November, with deliveries commencing in Q3 of 2009. Boeing will ultimately have six 787-8s in the expected 10-month flight test program, and another two used for ground testing.

"We are still looking at what this will mean to the overall [flight-test] schedule," said Boeing spokeswoman Lori Gunter.

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (04.20.24): Light Gun

Light Gun A handheld directional light signaling device which emits a brilliant narrow beam of white, green, or red light as selected by the tower controller. The color and type of>[...]

Aero-News: Quote of the Day (04.20.24)

"The journey to this achievement started nearly a decade ago when a freshly commissioned Gentry, driven by a fascination with new technologies and a desire to contribute significan>[...]

ANN's Daily Aero-Linx (04.21.24)

Aero Linx: JAARS, Inc. For decades now, we’ve landed planes on narrow rivers and towering mountains. We’ve outfitted boats and vehicles to reach villages that rarely se>[...]

Aero-News: Quote of the Day (04.21.24)

"Our driven and innovative team of military and civilian Airmen delivers combat power daily, ensuring our nation is ready today and tomorrow." Source: General Duke Richardson, AFMC>[...]

ANN's Daily Aero-Term (04.21.24): Aircraft Conflict

Aircraft Conflict Predicted conflict, within EDST of two aircraft, or between aircraft and airspace. A Red alert is used for conflicts when the predicted minimum separation is 5 na>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC