NTSB To Conduct Additional Test On Dreamliner Batteries | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, May 09, 2013

NTSB To Conduct Additional Test On Dreamliner Batteries

Airplanes May Be Returning To Service, But The Investigation Is Still Ongoing

The NTSB has reportedly extended a contract with Chesapeake Defense Services for additional Computed Tomography (CT) scans of batteries similar to those removed Boeing Dreamliners as it continues its investigation into why a battery caught fire aboard one of JAL's 787s in January.

The Board hopes to have the scans completed by May 16.

According to a "sources sought notice" posted by the NTSB May 3, "The NTSB is planning to conduct teardown examinations as soon as possible of several aircraft batteries similar to one involved in an aircraft incident. This urgent requirement is in support of accident investigation DCA13IA037 that occurred in Boston, MA. To facilitate those examinations, CT scans of these batteries and their subcomponents are required to non-destructively determine as much information as possible about those components.

"In addition, batteries and battery cells of the same type which have been subjected to known test conditions will also be scanned. These scans will be conducted both before and after the test conditions are applied. Since these batteries are of the lithium ion type and have substantial shipping restrictions (including a requirement for ground shipping only using specially qualified hazardous materials shippers which would cause a delay of several days to accommodate), these scans need to be conducted at a location close to Washington, D.C. to allow the NTSB to transport the battery to the contractor and thereby avoid shipping and other logistical complications. They must also be completed within the shortest timeframe possible to provide the fastest possible receipt of this information to avoid potential future accidents involving this type of aircraft battery.

"Since the FAA has recently approved a plan intended to result in the Boeing 787 being approved for a return to service, the information from these tests (and the CT scans required to support these tests) is needed as soon as possible. A scan report that documents items such as the x-ray source power used, x-ray focal spot size, detector used, integration time, number of views, image pixel size, slice thickness, total length scanned, number of slices, etc. is due no later than 10 days after the end of the scanning activity. The NTSB has a requirement for CT scanning services to begin on 5/6/2013. Therefore, this requirement is urgent."

Eight Dreamliner-type battery cells will be scanned.

The Puget Sound Business Journal reports that, according to the NTSB,  the original $49,000 contract account had only $1,000 left after the initial scans. The new contract represents an extension of the deal previously reached with Chesapeake Defense Services.

The document indicates that testing is continuing on the battery removed from the JAL Dreamliner which caught fire while sitting at a gate at Boston Logan International Airport, as well as other batteries.

(Images provided by the NTSB)

FMI: www.ntsb.gov

Advertisement

More News

ANN's Daily Aero-Term (04.20.24): Light Gun

Light Gun A handheld directional light signaling device which emits a brilliant narrow beam of white, green, or red light as selected by the tower controller. The color and type of>[...]

Aero-News: Quote of the Day (04.20.24)

"The journey to this achievement started nearly a decade ago when a freshly commissioned Gentry, driven by a fascination with new technologies and a desire to contribute significan>[...]

ANN's Daily Aero-Linx (04.21.24)

Aero Linx: JAARS, Inc. For decades now, we’ve landed planes on narrow rivers and towering mountains. We’ve outfitted boats and vehicles to reach villages that rarely se>[...]

Aero-News: Quote of the Day (04.21.24)

"Our driven and innovative team of military and civilian Airmen delivers combat power daily, ensuring our nation is ready today and tomorrow." Source: General Duke Richardson, AFMC>[...]

ANN's Daily Aero-Term (04.21.24): Aircraft Conflict

Aircraft Conflict Predicted conflict, within EDST of two aircraft, or between aircraft and airspace. A Red alert is used for conflicts when the predicted minimum separation is 5 na>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC