NASA's Hale Pleased With Results Of Atlantis Tank Test | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Wed, Dec 19, 2007

NASA's Hale Pleased With Results Of Atlantis Tank Test

Preliminary Findings Point To Bad Connector, Not Faulty Sensors

Here's a case where failure is actually a good thing. Engineers at NASA think they know why engine cut-off sensors installed within the external fuel tank connected to the shuttle Atlantis are malfunctioning, after two of the problem sensors failed during an on-pad test Tuesday.

NASA traced the problem to a bad connector between the tank and the shuttle, reports The Associated Press. But the agency isn't sure how long it will take to fix the problem, or when the shuttle will fly again.

"We're going to follow this trail where it leads us and we're going to solve this problem, and then we'll go fly ... whether it's January 10 or February 10 or March 10," said shuttle program manager Wayne Hale, adding the results of the test "sets us on the right path to correct this problem so we can return this important safety system to operational capability so we can fly again."

The good news stems from the likelihood the sensors themselves aren't to blame for the problem. Replacement of problem sensors would require Atlantis to head back to the Vehicle Assembly Building, and a teardown of the tank.

Preliminary information from Tuesday's test points to a section of wiring known as a "feed-through" connector. The data collected Tuesday will continue to be analyzed and presented to program managers Wednesday with recommendations on how to proceed.

To test the sensors, engineers pumped super-cold liquid hydrogen into the external fuel tank, and monitored for signs of failure.

The ECO sensors detect when levels of hydrogen within the external tank run low, and send a signal to shut off the orbiter's three main engines before fuel runs out. Continuing to operate the engines without fuel would lead to a catastrophic failure; likewise, cutting off the flow of fuel too soon would lead to a launch abort.

As ANN reported, two sensors malfunctioned during the original December 6 countdown; NASA's launch standards require three of the four sensors to be operational at time of launch. A third sensor mysteriously failed as NASA began loading hydrogen into the tank December 9, halting the countdown once again.

So far, NASA has only said the shuttle won't launch before January 10.

FMI: www.nasa.gov/shuttle

Advertisement

More News

ANN's Daily Aero-Linx (04.16.24)

Aero Linx: International Business Aviation Council Ltd IBAC promotes the growth of business aviation, benefiting all sectors of the industry and all regions of the world. As a non->[...]

Aero-News: Quote of the Day (04.16.24)

"During the annual inspection of the B-24 “Diamond Lil” this off-season, we made the determination that 'Lil' needs some new feathers. Due to weathering, the cloth-cove>[...]

Airborne 04.10.24: SnF24!, A50 Heritage Reveal, HeliCycle!, Montaer MC-01

Also: Bushcat Woes, Hummingbird 300 SL 4-Seat Heli Kit, Carbon Cub UL The newest Junkers is a faithful recreation that mates a 7-cylinder Verner radial engine to the airframe offer>[...]

Airborne 04.12.24: SnF24!, G100UL Is Here, Holy Micro, Plane Tags

Also: Seaplane Pilots Association, Rotax 916’s First Year, Gene Conrad After a decade and a half of struggling with the FAA and other aero-politics, G100UL is in production a>[...]

Airborne-Flight Training 04.17.24: Feds Need Controllers, Spirit Delay, Redbird

Also: Martha King Scholarship, Montaer Grows, Textron Updates Pistons, FlySto The FAA is hiring thousands of air traffic controllers, but the window to apply will only be open for >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC