EBACE 2009: Dallas Airmotive Love Field Airport RTC Expands PW305 Capability | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.09.24

Airborne-Unlimited-04.10.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Mon, May 11, 2009

EBACE 2009: Dallas Airmotive Love Field Airport RTC Expands PW305 Capability

Dallas Airmotive has expanded its PW305 capabilities at the company's Regional Turbine Center (RTC) located at Dallas Love Field Airport (DAL) in Dallas, Texas. The latest addition is the tooling and equipment to perform IBR (Integrally Bladed Rotor) replacement on the PW305A used on Learjet 60 aircraft. The first two engines to receive this replacement were completed in April.

"We knew that Pratt & Whitney Canada would introduce a new IBR for the 305A this year, so we prepared for this event last year by expanding the facility and purchasing the necessary tooling and equipment," stated Dallas Airmotive Vice President Customer Service and Global Regional Turbine Center Operations, Mike Cumnock. "As soon as the new IBR became available we were ready and have now finished our first engines with more scheduled for the rest of 2009."

Replacement of the PW305A IBR eliminates the need for inspection every 300 hours as required for the original units.

"When we received PW305 authorization from Pratt & Whitney Canada in 2004, we immediately set up the Love Field RTC for Hot Section Inspection (HSI) and quick turn service," added Cumnock.

"By doing so, our main overhaul center in Dallas could focus on major repairs and overhauls. At the RTC we've driven down Hot Section Inspection turn times to under 14 calendar days. And now, with the new equipment, we can replace the IBR separately or in conjunction with the HSI."

FMI: www.BBAAviationERO.com

Advertisement

More News

ANN's Daily Aero-Linx (04.13.24)

Aero Linx: Florida Antique Biplane Association "Biplanes.....outrageous fun since 1903." That quote really defines what the Florida Antique Biplane Association (FABA) is all about.>[...]

ANN's Daily Aero-Term (04.13.24): Beyond Visual Line Of Sight (BVLOS)

Beyond Visual Line Of Sight (BVLOS) The operation of a UAS beyond the visual capability of the flight crew members (i.e., remote pilot in command [RPIC], the person manipulating th>[...]

Airborne 04.09.24: SnF24!, Piper-DeltaHawk!, Fisher Update, Junkers

Also: ForeFlight Upgrades, Cicare USA, Vittorazi Engines, EarthX We have a number of late-breaking news highlights from the 2024 Innovation Preview... which was PACKED with real ne>[...]

Aero-News: Quote of the Day (04.14.24)

“For Montaer Aircraft it is a very prudent move to incorporate such reliable institution as Ocala Aviation, with the background of decades in training experience and aviation>[...]

ANN's Daily Aero-Term (04.14.24): Maximum Authorized Altitude

Maximum Authorized Altitude A published altitude representing the maximum usable altitude or flight level for an airspace structure or route segment. It is the highest altitude on >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC