GE Aviation, Emirates Airline Work To Optimize Traffic Flows | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** Airborne 09.02.14 ** HD iPad-Friendly -- Airborne 09.02.14 **
** Airborne 08.29.14 ** HD iPad-Friendly -- Airborne 08.29.14 **
** Airborne 08.27.14 ** HD iPad-Friendly -- Airborne 08.27.14 **

Thu, May 31, 2012

GE Aviation, Emirates Airline Work To Optimize Traffic Flows

Project Designed To Reduce Flight Costs, Delays

GE Aviation has been selected by Emirates airline to provide GE’s airline-based flow management system for a 16-month validation at Dubai International Airport. To commence in July, 2012, the Emirates “FLOW Project” will allow the airline to reduce fuel and delay costs, as well as improve their hub passenger-connection schedule at Dubai International Airport by sequencing and spacing the company’s arrivals according to Emirates’ commercial priorities.

“GE’s FLOW solution will optimize Emirates’ traffic flows within the existing air traffic control system,” said Giovanni Spitale, general manager of GE’s PBN Services. “This service will give Emirates increased control over their arrivals and hub schedule, helping to significantly reduce costs of operation.”

GE Aviation will provide the installation, integration and service of the FLOW aircraft arrival management system. Installation is currently taking place at the Emirates Operations Control Centre at the Emirates Group Headquarters with entry into service expected to begin in the autumn this year.

“Emirates has collaborated with GE Aviation to implement the new flow management system here in Dubai. We anticipate that GE’s flow system will bring significant enhancements to our arrival flow in Dubai, leading to an increased aircraft landing rate and runway utilisation. This will improve efficiency, reduce fuel burn and add to our passenger connectivity,” stated Captain Alan Stealey, Emirates Divisional Senior Vice President of Flight Operations.

GE’s FLOW system will be powered by ATH Group’s Attila software. Attila is an airline-based flow management system that provides Required Time of Arrival (RTA) recommendations to each Emirates aircraft to pre-condition the arrival flow into Dubai. The system is capable of taking into account elements like Emirates’ passenger connections, gate availability and fuel consumption. GE Aviation enhances the Attila system with data from and connectivity to Emirates aircraft flight management systems.

FMI: www.ge.com/aviation

Advertisement

More News

Annual Oshkosh 2014 'Best/Worst Of' Award Selection Invites YOUR Participation!

YOU Can Contribute To The Annual List Compiled By The Staff and Readership of the ANN and Aero-TV! E-I-C Note: We're going to start naming names and dropping details THIS week--- t>[...]

Airborne 08.29.14: Google Drone!, Cessna's 10,000th, Bearhawk LODA

Also: Big Boeing Order, Napa Tower Quaked, Landsberg Retires, Galileo Falters Breaking News! Google has unveiled an exciting new UAV project, called Project Wing, which has been un>[...]

Aero-TV: The Tecnam Juggernaut -- SeaSky, P2008, P2010, Trainers, and Astore!

An Impressive Line-Up Continues To Make A Solid Impact On Sport Aviation ANN CEO and Editor-In-Chief, Jim Campbell seized the opportunity to talk with Phil Solomon, the CEO of Tecn>[...]

AD: Bombardier, Inc. Airplanes

AD NUMBER: 2014-17-04 PRODUCT: Certain Bombardier, Inc. Model CL-600-2B19 (Regional Jet Series 100 & 440) airplanes.>[...]

ANN's Daily Aero-Linx (09.02.14)

FAA General Aviation Airports Report Beginning in 2010, the FAA began a national review of the general aviation airports resulting in two reports, General Aviation Airports: A Nati>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2014 Web Development & Design by Pauli Systems, LC