Air Force Engineers Help Put BPT Back In Business | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

AMA Drone Report

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday

Airborne-Thursday

Airborne-Friday

Airborne-Unmanned w/AUVSI

Airborne On ANN

AMA 07.20.17

Airborne 07.17.17

Airborne 07.18.17

Airborne 07.19.17

Airborne 07.20.17

Airborne 07.21.17

Airborne-Unmanned 07.18.17

Airborne-YouTube

AMA 07.20.17

Airborne 07.17.17

Airborne 07.18.17

Airborne 07.19.17

Airborne 07.20.17

Airborne 07.21.17

Airborne-Unmanned 07.18.17

Coming Up In Just A Few Hours -- 2017 AirVenture Innovation Preview -- DON'T MISS IT!

Mon, Oct 03, 2005

Air Force Engineers Help Put BPT Back In Business

Airfield Damaged By Rita Powered Up And Running

Two airmen with the 147th Civil Engineer Flight wing aiding relief efforts in the aftermath of Hurricane Rita, along with a civilian contractor, took some time last week to help get Southeast Texas Regional Airport near Port Arthur, TX, up and running again.

Senior Master Sgt. Michelle Milliard, the non-commissioned officer in charge of the engineer flight, and power production craftsman Staff Sgt. Al Martinez were conducting an airfield damage assessment September 25 with civilian contractor Claudette Manning, when they were approached by BPT manager Hal Ross.

Ross, according to an Air Force release, told the crew even when the debris and tree limbs littering the field were removed, the facility would not be able to reopen as power was still down at the airport,and the backup 100kw generator wasn't working.

Sgt. Martinez took that as a challenge.

"In five minutes, he had the generator up and running," Sergeant Milliard said.

Martinez and the others spent the next several hours of a typically hot and humid southern Texas afternoon reestablishing the power grid at the field, by connecting several other generators that soldiers had brought to the airport.

The Airmen also restored power to the airport's ILS system and air conditioning system, in order to dry out water-damaged wiring as well as to provide relief from the heat. Martinez was also able to restore power to the fuel farm, field lights, and the Beaumont VOR located on the field.

FMI: www.af.mil

Advertisement

More News

Airborne 07.19.17: NEW Kitfox Speedster!!!, Rotax 4 Sonex, Trig TY96A/TY97A

Also: Flt 3407 Families, Zenith STOL, Brandon Expands, BAA Training, Delta Caves In, Sully Defends GA, Global 7000 Years ago, ANN Boss Jim Campbell remarked a that recent flight te>[...]

AMA Drone Report 07.20.17: FAST Drones, GeoFencing, Certified Drone Photographer

Also: SureFly Helicopter Concept, 'Design a Drone', Raleigh v Drones, Aero-TV: AMA's David Mathewson The Drone Racing League recently tested the fastest racing drone, and set the G>[...]

AMA Drone Report 07.20.17: FAST Drones, GeoFencing, Certified Drone Photographer

Also: SureFly Helicopter Concept, 'Design a Drone', Raleigh v Drones, Aero-TV: AMA's David Mathewson The Drone Racing League recently tested the fastest racing drone, and set the G>[...]

AMA Drone Report 07.13.17: Drones At AirVenture, CA Regs, Women and Drones

Also: Cal Fire Warns, AU Fines, New Florida Law, Aero-TV: FAA's Earl Lawrence THE world’s greatest aviation event is but a week and a half away. And for drone flyers; EAA Air>[...]

Airborne 07.20.17: ForeFlight Scout, Airbus SAGITTA UAV, Privatization Fight

Also: NASA P2006T, Robert Sumwalt, First FL Legacy 500, Tuskegee Airmen, New RAF Trainer, VFA-115 ForeFlight has announced the availability of Scout, a portable, dual-band ADS-B re>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2017 Web Development & Design by Pauli Systems, LC