Boeing Delivers 1st Space Launch System Hardware To NASA | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Monday

Tuesday

Wednesday

Thursday

Friday

Airborne On ANN

Airborne 05.18.15

Airborne 05.26.15

Airborne 05.20.15

Airborne 05.21.15

Airborne 05.22.15

Airborne Hi-Def On YouTube

Airborne 05.18.15

Airborne 05.26.15

Airborne 05.20.15

Airborne 05.21.15

Airborne 05.22.15

 

Mon, Jun 04, 2012

Boeing Delivers 1st Space Launch System Hardware To NASA

SLS Capability Will Enable Future Human Space Exploration

Three flight computer software test beds have been delivered to NASA by Boeing ... the first critical element for flight software development in support of NASA's Space Launch System (SLS). Flight software controls the launch vehicle during preflight tanking operations and in flight. The test beds were delivered on April 25 to the Software Development Facility at NASA's Marshall Space Flight Center in Huntsville. They are now being integrated with NASA's application software.

"These are the most capable flight computers ever developed for human spaceflight," said Dane Richardson, manager for the Boeing SLS Avionics and Software Team. "They have the highest processing capability available in a flight computer and triple modular redundant processors. The technology is proven from years of satellite applications, and it's reliable enough to take SLS beyond Earth's orbit."
 
In triple modular redundant processing, three processors within each flight computer interpret the data, then "vote" to be sure they all agree on the response before sending that solution from the computer. The three flight computers on the vehicle then compare those answers and send commands to the vehicle for execution. "The triple redundant processors make each computer reliable in the harsh radiation environment. Similarly, the three computers working in concert make the vehicle reliable," explained Richardson. "The configuration is called the flight computer operating group."
 
"We are moving out very quickly on SLS," said Todd May, Space Launch System Program manager at NASA's Marshall Space Flight Center in Huntsville, Ala. "SLS will be the most powerful launch vehicle ever built, and it requires the most capable flight software in the history of human spaceflight. Having this avionics hardware in place early will allow the NASA SLS team and Boeing to accelerate the flight software development."

In 2011, NASA executed a contract modification that changed existing Upper Stage Production and Instrument Unit Avionics contracts into a single contract for design, development and production of the cryogenic stages and avionics for SLS.
 
Under NASA's phased development plan for SLS, Boeing is designing the two cryogenic stages concurrently to maximize the affordability of rocket development and operations. The initial flight-test configuration, scheduled to fly in 2017, will provide a 70-metric ton capacity using only the first stage. The complete two-stage vehicle configuration will provide a lift capability of more than 130 metric tons to enable missions beyond Earth orbit and support deep space exploration. (SLS image provided by NASA)

FMI: www.beyondearth.com

Advertisement

More News

Klyde Morris (05.25.15)

Klyde Gets Positively ElectroMagnetic FMI: www.klydemorris.com>[...]

NIMBY Group Looks To Stir Up Anti-KSMO Sentiment

Soliciting Complaint Forms For Members Of Congress To Take To The FAA In an effort to have further restrictions placed on Santa Monica Airport ... or close it all together ... a gr>[...]

Airborne 05.22.15: Falcon 5X Readies, Avidyne AD, LadiesLoveTaildraggers 2015

Also: Air Power Museum, ANN Could Use A Little Help From Its Friends, GE Honda, Mexican-Registry TBM 900, Legacy 500, BBJ Winglets, Wheels Up Order The new Falcon 5X is getting clo>[...]

Aero-News: Quote Of The Day (05.25.15)

“It is the Sikorsky Innovations charter to identify the toughest challenges in vertical flight, and to demonstrate solutions to them. Getting an all-new aircraft into flight,>[...]

Aero-TV: Just Like The 'Real' Thing – Redbird/Disney’s ‘Dusty’ FlightSim

Disclaimer: No Matter What He Tells You, Tom Patton Is Not A Certified Firefighting Pilot While at EAA AirVenture 2014, ANN News Editor, Tom Patton checked out what was going on at>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2015 Web Development & Design by Pauli Systems, LC