Fiftieth F135 Engine Delivered For The F-35 Joint Strike Fighter | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date






Airborne On ANN

Airborne 11.23.15

Airborne 11.24.15

Airborne 11.25.15

Airborne 11.19.15

Airborne 11.20.15

Airborne Hi-Def On YouTube

Airborne 11.23.15

Airborne 11.24.15

Airborne 11.25.15

Airborne 11.19.15

Airborne 11.20.15

EAA/ANN AirVenture Innovation Preview

AIP-#1 Vimeo

AIP-#2 Vimeo

AIP-Part 1 YouTube

AIP-Part 2 YouTube

Mon, May 07, 2012

Fiftieth F135 Engine Delivered For The F-35 Joint Strike Fighter

Milestone Mill To Be Installed In A Carrier Variant Aircraft

The 50th production F135 engine for the F-35 Lightning II has been delivered  to the U.S. Department of Defense. The milestone engine is scheduled to be installed in a F-35C Carrier Variant (CV) for the United States Navy, which will be delivered to Eglin Air Force Base this summer for Navy pilot training.

"Delivery of the 50th production F135 engine is a significant milestone for the program," said Chris Flynn, vice president, F135/F119 Engine Programs, Pratt & Whitney. "We are proud of the progress made on the most advanced fifth-generation fighter engine in the world. We will continue to work diligently toward production and testing benchmarks while meeting our cost objectives."

The F-35 program includes three variants to meet the unique needs of the U.S. armed forces and the international participants in the program: the CV, the CTOL and the Short Takeoff and Vertical Landing (STOVL).  To date, the F135 propulsion system has powered more than 330 vertical landings, 2,000 test flights producing more than 3,000 flight hours.  Pratt & Whitney has delivered 30 CTOL/CV and 20 STOVL engines and related propulsion system hardware.  The success of the F135 engine program validates the reliability, safety and performance of the engine.

Included in the 50 deliveries was the last deliverable hardware required for the third lot of Low Rate Initial Production (LRIP) engines.  Pratt & Whitney is now delivering to the fourth lot of LRIP contract requirements which are scheduled to be completed by the end of 2012.

Pratt & Whitney has designed, developed and tested the F135 to deliver the most advanced fifth-generation fighter engine for the United States and its allies around the world. Pratt & Whitney is a world leader in the design, manufacture and service of aircraft engines, space propulsion systems and industrial gas turbines. United Technologies, based in Hartford, Conn., is a diversified company providing high technology products and services to the global aerospace and building industries.



More News

Airborne 11.25.15: Blue Origin Reusable Rocket!, AMA Reacts, Transgender Pilots

Also: UK CAA, E-Fest 2015, Citizens In Space, Gulfstream G500, Dassault Falcon Jet, CFM LEAP-1A, Tuskegee's Milton Crenchaw ANN Airborne Link: /index.cfm?do=video.playVideo&vid>[...]

SpaceX Rocket Debris Found Near The U.K. Isles Of Scilly

Piece Is A Panel From The Interstage Module From ISS Resupply Mission CRS-4 Launched Over A Year Ago A panel from a SpaceX Falcon 9 booster was found floating in the ocean Thursday>[...]

ANN's Daily Aero-Linx (11.28.15)

National Coalition for Aviation Education The National Coalition for Aviation Education is a membership organization that was formed in 1993 when the founding member groups signed >[...]

ANN's Daily Aero-Term (11.28.15): Flight Recorder

A general term applied to any instrument or device that records information about the performance of an aircraft in flight or about conditions encountered in flight.>[...]

Aero-News: Quote Of The Day (11.28.15)

"The markings show an American flag. It looks like it’s an American rocket and is similar to the unmanned SpaceX Falcon 9 which blew up shortly after take-off from Cape Canav>[...]

blog comments powered by Disqus





© 2007 - 2015 Web Development & Design by Pauli Systems, LC