Deployment Of Floodwall Underway At St. Paul Downtown Airport | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Mar 15, 2011

Deployment Of Floodwall Underway At St. Paul Downtown Airport

Precautionary Measure Against Expected Mississippi River Flooding

With spring flooding of the Mississippi River at St. Paul all but certain, work crews from the Metropolitan Airports Commission (MAC) began deploying temporary sections of floodwall at St. Paul Downtown Airport (KSTP) on Monday. “Prior to developing the floodwall in 2009, flooding sometimes caused hundreds of thousands of dollars of damage and expense and closed St. Paul Downtown Airport for weeks at a time,” said MAC Executive Director Jeff Hamiel. “The floodwall is designed to protect the airport against a hundred-year flood, safeguarding infrastructure and minimizing operational impacts.”

This is the fourth time the floodwall has been deployed at the airport, having been erected once in 2009 and twice in 2010. The 9,532’ dike includes 4,563’ of permanently installed sheet pile wall, 3,595’ of temporary, deployable wall and 1,374’ of earthen levee. MAC staff can deploy temporary sections of the wall in about a week.

Portions of the wall along Bayfield Street and those crossing the airport’s two shortest runways, 13-31 and 9-27, will be erected first, leaving the longest, primary runway, 14-32, unaffected as long as possible. As the water rises, the MAC will close storm sewer gates to prevent river water from backing up onto the airport, and pumps will be activated to drain water that does collect there.

If necessary, MAC also will install the deployable wall crossing the far southeastern end of 14-32, sealing off the airfield from the river. Barring unforeseen circumstances, Runway 14-32 will remain operational with the wall in place, but the landing threshold will be displaced, shortening the operational portion of runway pavement from 6,491’ to 5,341’. The two shorter runways already have been temporarily closed. The Federal Aviation Administration will remove navigational aids located outside the floodwall to protect them from water damage. The wall will remain in place until the danger of flooding has passed.

FMI: www.mspairport.com

Advertisement

More News

ANN's Daily Aero-Linx (04.16.24)

Aero Linx: International Business Aviation Council Ltd IBAC promotes the growth of business aviation, benefiting all sectors of the industry and all regions of the world. As a non->[...]

Aero-News: Quote of the Day (04.16.24)

"During the annual inspection of the B-24 “Diamond Lil” this off-season, we made the determination that 'Lil' needs some new feathers. Due to weathering, the cloth-cove>[...]

Airborne 04.10.24: SnF24!, A50 Heritage Reveal, HeliCycle!, Montaer MC-01

Also: Bushcat Woes, Hummingbird 300 SL 4-Seat Heli Kit, Carbon Cub UL The newest Junkers is a faithful recreation that mates a 7-cylinder Verner radial engine to the airframe offer>[...]

Airborne 04.12.24: SnF24!, G100UL Is Here, Holy Micro, Plane Tags

Also: Seaplane Pilots Association, Rotax 916’s First Year, Gene Conrad After a decade and a half of struggling with the FAA and other aero-politics, G100UL is in production a>[...]

Airborne-Flight Training 04.17.24: Feds Need Controllers, Spirit Delay, Redbird

Also: Martha King Scholarship, Montaer Grows, Textron Updates Pistons, FlySto The FAA is hiring thousands of air traffic controllers, but the window to apply will only be open for >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC