Engineers Still Discussing Discovery Repairs | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

AMA Drone Report

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday

Airborne-Thursday

Airborne-Friday

Airborne-Unmanned w/AUVSI

Airborne On ANN

AMA 06.22.17

Airborne 06.19.17

Airborne 06.20.17

Airborne 06.21.17

Airborne 06.22.17

Airborne 06.23.17

Airborne-Unmanned 06.20.17

Airborne-YouTube

AMA 06.22.17

Airborne 06.19.17

Airborne 06.20.17

Airborne 06.21.17

Airborne 06.22.17

Airborne 06.23.17

Airborne-Unmanned 06.20.17

XPONENTIAL Innovation Preview -- www.allthingsunmanned.com

Tue, Nov 09, 2010

Engineers Still Discussing Discovery Repairs

GUPC, Crack In Foam Insulation Delaying Launch

Engineers met in a series of meetings Monday to discuss inspection and repair options for space shuttle Discovery's ground umbilical carrier plate (GUCP) and a crack in the external fuel tank foam insulation. Discovery's launch was postponed Friday until at least Nov. 30 because of a hydrogen gas leak at the GUCP.


NASA File Photo

Technicians at NASA's Kennedy Space Center in Florida have been measuring the alignment of the plate on the external tank and performing leak checks. Crews began disconnecting the GUCP Tuesday after disconnecting the hydrogen vent line that attaches to the GUCP. Managers will assess repair options after the disconnected GUCP is inspected.

Teams also have begun analysis and inspection of the approximately 20-inch long crack in the external tank foam. Teams are planning to use terahertz or backscatter scans to see beneath the foam to look for any other potential issues. As early as Wednesday, technicians could begin dissecting the cracked section so foam experts can make a thorough evaluation in order to help determine the cause of the crack. Teams still are working out plans to reapply foam to the external tank after inspections are complete. Shuttle managers continue evaluating the data to determine the best repair methods and next launch opportunity for Discovery's STS-133 mission to the International Space Station.


NASA File Photo

Shuttle managers continue evaluating the data to determine the best repair methods and next launch opportunity for Discovery's STS-133 mission to the International Space Station.

FMI: www.nasa.gov

Advertisement

More News

AMA Drone Report 06.22.17: FAA Reauthorization, Rotor Riot Int'l, DRL on ESPN

Also: Drones at Oshkosh!, Drone Regulatory Effort, AMA Drone Report-Help Wanted, Aero-TV: MultiGP Drone Racing The House of Representatives has published initial language to reauth>[...]

Airborne-Unmanned 06.20.17: UAS Orgs v Bad Regs, Anti-Collision, Drone Race $$

Also: Solar-Powered UAS, NK Drone, UAS Survey, Brian Wynne Interview The team at AUVSI is staying plenty busy as they and 13 other organizations authored a letter to members of Con>[...]

Airborne 06.23.17: Airbus 'Racer', RANS 'Fly To Work', Boater v Floatplane

Also: House ATC Bill, Golda Cox, Boeing Forecast, Concorde Battery, C-130J-SOF, SpiceJet, Flt School Closure Airbus Helicopters has unveiled their ‘Racer’ -- which stan>[...]

Aero-News: Quote of the Day (06.25.17)

“The airline market in Africa has been growing slowly but steadily as the industry is becoming more liberalized and the infrastructure to support the growth is being put in p>[...]

ANN's Daily Aero-Term (06.25.17): Control Sector

Control Sector An airspace area of defined horizontal and vertical dimensions for which a controller or group of controllers has air traffic control responsibility, normally within>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2017 Web Development & Design by Pauli Systems, LC