Engineers Still Discussing Discovery Repairs | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

AMA Drone Report

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday

Airborne-Thursday

Airborne-Friday

Airborne-Unmanned w/AUVSI

Airborne On ANN

AMA 08.17.17

Airborne 08.14.17

Airborne 08.15.17

Airborne 08.16.17

Airborne 08.17.17

Airborne 08.18.17

Airborne-Unmanned 08.15.17

Airborne-YouTube

AMA 08.17.17

Airborne 08.14.17

Airborne 08.15.17

Airborne 08.16.17

Airborne 08.17.17

Airborne 08.18.17

Airborne-Unmanned 08.15.17

NEW!!! 2017 AirVenture Innovation Preview -- YouTube Presentation / Vimeo Presentation

Tue, Nov 09, 2010

Engineers Still Discussing Discovery Repairs

GUPC, Crack In Foam Insulation Delaying Launch

Engineers met in a series of meetings Monday to discuss inspection and repair options for space shuttle Discovery's ground umbilical carrier plate (GUCP) and a crack in the external fuel tank foam insulation. Discovery's launch was postponed Friday until at least Nov. 30 because of a hydrogen gas leak at the GUCP.


NASA File Photo

Technicians at NASA's Kennedy Space Center in Florida have been measuring the alignment of the plate on the external tank and performing leak checks. Crews began disconnecting the GUCP Tuesday after disconnecting the hydrogen vent line that attaches to the GUCP. Managers will assess repair options after the disconnected GUCP is inspected.

Teams also have begun analysis and inspection of the approximately 20-inch long crack in the external tank foam. Teams are planning to use terahertz or backscatter scans to see beneath the foam to look for any other potential issues. As early as Wednesday, technicians could begin dissecting the cracked section so foam experts can make a thorough evaluation in order to help determine the cause of the crack. Teams still are working out plans to reapply foam to the external tank after inspections are complete. Shuttle managers continue evaluating the data to determine the best repair methods and next launch opportunity for Discovery's STS-133 mission to the International Space Station.


NASA File Photo

Shuttle managers continue evaluating the data to determine the best repair methods and next launch opportunity for Discovery's STS-133 mission to the International Space Station.

FMI: www.nasa.gov

Advertisement

More News

Aero-News: Quote of the Day (08.20.17)

“The F-106 was ahead of its time... Performance-wise, I felt it was comparable to the (F-15) Eagle. It kept us busy back then. We were accomplishing 20-plus sorties on a dail>[...]

RFP: ANN Seeking New Site/Facility For Major Studio Upgrade

It's Official: Aggressive Upgrades For New Airborne Programs WILL Require New Digs It's been in development for years, but we're getting to a point where we think we can pull off s>[...]

Airborne-Unmanned 08.15.17: Reno Drone Races, DoD CrackDown, Blue Angels v UAV?

Also: Kansas DOT-AirMap, CIRRUAS Drone Program, Daytona Beach PD UAS, Virginia UAS SAR The Reno Air Racing Association has signed an agreement with the MultiGP Drone Racing League >[...]

ANN's Daily Aero-Linx (08.20.17)

Aero Linx: Wings of Freedom Aviation Museum The Delaware Valley Historical Aircraft Association Harold F. Pitcairn Wings of Freedom Aviation Museum is a 501(c)3 nonprofit, all-volu>[...]

AMA Drone Report 08.17.17: MULTI-GP Int'l Open, Drone v Chicago, Reno Drone Race

Also: Yuneec Extended Service Plan, UAV on A/C Carrier, Blue Angels Incident, Drone Operator Safety Act MultiGP’s 2017 MultiGP International Open, conducted on the grounds of>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2017 Web Development & Design by Pauli Systems, LC