NASA's Kepler Spacecraft 'Baked,' Ready for More Tests | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Wed, Sep 24, 2008

NASA's Kepler Spacecraft 'Baked,' Ready for More Tests

Planet-Hunting Probe Scheduled To Launch In 2009

NASA's planet-hunting Kepler mission, scheduled to launch in 2009, has survived an extreme temperature test.

The thermal vacuum test is part of a series of environmental tests the spacecraft will undergo before it blasts into space aboard a Delta II rocket from the Cape Canaveral Air Force Station, FL.

"Kepler functioned extremely well at the intense temperatures it will encounter in space," said James Fanson, Kepler project manager at NASA's Jet Propulsion Laboratory, Pasadena, CA.

The test, which was performed at Ball Aerospace & Technologies Corp. in Boulder, CO simulates the vacuum of space, and the extreme temperatures Kepler will face once launched. The spacecraft is tucked into a vacuum chamber and surrounded by a cold shroud to mimic the deep chill of space. One side of the spacecraft -- the side with solar panels -- is then baked as if it were being heated by the sun.

The goal is to make sure that the spacecraft and its detectors operate properly in the space-like environment. An electromagnetic compatibility test, to ensure Kepler's electronics are sound, will begin soon.

Kepler will monitor 100,000 stars, searching for signs of planets -- including ones as small as or smaller than Earth. To date, no Earth-sized planet has been discovered.

"The results of these tests are now being used to prepare for the science operations that will start after the spacecraft launches and undergoes in-orbit checkout," said Bill Borucki of NASA Ames Research Center, Moffett Field, CA, the science principal investigator for the Kepler Mission.

Kepler is a NASA Discovery mission. In addition to being the home organization of the science principal investigator, NASA Ames Research Center is responsible for the ground system development, mission operations and science data analysis. Kepler mission development is managed by JPL. Ball Aerospace & Technologies Corp. is responsible for developing the Kepler flight system and supporting mission operations.

FMI: http://kepler.nasa.gov/, http://planetquest.jpl.nasa.gov

Advertisement

More News

ANN's Daily Aero-Linx (04.15.24)

Aero Linx: International Flying Farmers IFF is a not-for-profit organization started in 1944 by farmers who were also private pilots. We have members all across the United States a>[...]

Classic Aero-TV: 'No Other Options' -- The Israeli Air Force's Danny Shapira

From 2017 (YouTube Version): Remembrances Of An Israeli Air Force Test Pilot Early in 2016, ANN contributor Maxine Scheer traveled to Israel, where she had the opportunity to sit d>[...]

Aero-News: Quote of the Day (04.15.24)

"We renegotiated what our debt restructuring is on a lot of our debts, mostly with the family. Those debts are going to be converted into equity..." Source: Excerpts from a short v>[...]

Airborne 04.16.24: RV Update, Affordable Flying Expo, Diamond Lil

Also: B-29 Superfortress Reunion, FAA Wants Controllers, Spirit Airlines Pulls Back, Gogo Galileo Van's Aircraft posted a short video recapping the goings-on around their reorganiz>[...]

ANN's Daily Aero-Term (04.16.24): Chart Supplement US

Chart Supplement US A flight information publication designed for use with appropriate IFR or VFR charts which contains data on all airports, seaplane bases, and heliports open to >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC