Site List Narrows For NASA's Next Mars Landing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sat, Nov 22, 2008

Site List Narrows For NASA's Next Mars Landing

One Of Four Sites To Be Selected

Four intriguing places on Mars have risen to the final round as NASA selects a landing site for its next Mars mission, the Mars Science Laboratory.

The agency had a wider range of possible landing sites to choose from than for any previous mission, thanks to the Mars Science Laboratory's advanced technologies, and the highly capable orbiters helping this mission identify scientifically compelling places to explore.

Mars Science Laboratory project leaders at NASA's Jet Propulsion Laboratory in Pasadena, CA chose the four this month, after seeking input from international Mars experts and from engineers working on the landing system and rover capabilities. 

The sites, alphabetically, are: Eberswalde, where an ancient river deposited a delta in a possible lake; Gale, with a mountain of stacked layers including clays and sulfates; Holden, a crater containing alluvial fans, flood deposits, possible lake beds and clay-rich deposits; and Mawrth, which shows exposed layers containing at least two types of clay. 

"All four of these sites would be great places to use our roving laboratory to study the processes and history of early Martian environments and whether any of these environments were capable of supporting microbial life and its preservation as biosignatures," said John Grotzinger of the California Institute of Technology, Pasadena. He is the project scientist for the Mars Science Laboratory.

The mission's capabilities for landing more precisely than ever before and for generating electricity without reliance on sunshine have made landing sites eligible that would not have been acceptable for past Mars missions. During the past two years, multiple observations of dozens of candidate sites by NASA's Mars Reconnaissance Orbiter have augmented data from earlier orbiters for evaluating sites' scientific attractions and engineering risks.

JPL is assembling and testing the Mars Science Laboratory spacecraft for launch in fall 2009. Paring the landing-site list to four finalists allows the team to focus further on evaluating the sites and planning the navigation. The mission plan calls for the rover to spend a full Mars year (23 months) examining the environment with a diverse payload of tools.

After evaluating additional Mars orbiter observations of the four sites, NASA will hold a fourth science workshop about the candidates in the spring and plans to choose a final site next summer. Three previous landing-site science workshops for Mars Science Laboratory, in 2006, 2007 and two months ago, drew participation of more than 100 Mars scientists and presentations about more than 30 sites.

For their Mars landings in 2004, Spirit and Opportunity needed safe target areas about 40 miles long. Mars Science Laboratory is designed to hit a target area roughly 12 miles in diameter.

FMI: http://mars.jpl.nasa.gov/msl

Advertisement

More News

ANN's Daily Aero-Linx (04.16.24)

Aero Linx: International Business Aviation Council Ltd IBAC promotes the growth of business aviation, benefiting all sectors of the industry and all regions of the world. As a non->[...]

Aero-News: Quote of the Day (04.16.24)

"During the annual inspection of the B-24 “Diamond Lil” this off-season, we made the determination that 'Lil' needs some new feathers. Due to weathering, the cloth-cove>[...]

Airborne 04.10.24: SnF24!, A50 Heritage Reveal, HeliCycle!, Montaer MC-01

Also: Bushcat Woes, Hummingbird 300 SL 4-Seat Heli Kit, Carbon Cub UL The newest Junkers is a faithful recreation that mates a 7-cylinder Verner radial engine to the airframe offer>[...]

Airborne 04.12.24: SnF24!, G100UL Is Here, Holy Micro, Plane Tags

Also: Seaplane Pilots Association, Rotax 916’s First Year, Gene Conrad After a decade and a half of struggling with the FAA and other aero-politics, G100UL is in production a>[...]

Airborne-Flight Training 04.17.24: Feds Need Controllers, Spirit Delay, Redbird

Also: Martha King Scholarship, Montaer Grows, Textron Updates Pistons, FlySto The FAA is hiring thousands of air traffic controllers, but the window to apply will only be open for >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC