FAA Issues AD For Great Lakes Aircraft | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** Airborne 11.21.14 ** HD iPad-Friendly -- Airborne 11.21.14 **
** Airborne 11.19.14 ** HD iPad-Friendly -- Airborne 11.19.14 **
** Airborne 11.17.14 ** HD iPad-Friendly -- Airborne 11.17.14 **

Wed, Jun 06, 2012

FAA Issues AD For Great Lakes Aircraft

AD Affects Great Lakes Aircraft Produced During The 1970’s And 80’s

The FAA has issued an Airworthiness Directive (AD) that addresses a safety problem with Great Lakes aircraft produced in the 1970’s and 1980’s. The affected aircraft were not produced by WACO Classic Aircraft. However, as the new Type Certificate Holder, the company said in a news release that they take seriously the issue of continued airworthiness of the Great Lakes fleet of aircraft serial numbers 501 through 1012.

Please note that this AD will not apply to new production aircraft manufactured by WACO Classic Aircraft, as the affected area has been redesigned to prevent this condition from recurring.

In March, 2011, a Great Lakes 2T-1A-2 was substantially damaged when the right horizontal stabilizer failed as the airplane completed some aerobatic maneuvers, and separated from the airplane while it was on final approach for landing. The pilot was able to continue to a landing at the airport, but due to the damage to the rudder, was unable to maintain directional control, and the airplane ground looped to the right. Examination of the right stabilizer revealed evidence of a pre-existing crack in the front spar at the rivets securing the steel attach fitting tube. The spar moved outward and disengaged from the fitting. At least one maintenance facility familiar with this aircraft type has reported finding similar cracks in the stabilizer front spar on a number of occasions during routine maintenance.

Great Lakes Aircraft Service Bulletin #15, issued May 1, 2000, points out the possibility of front spar failure inside the attach fitting as a result of excessive torque loads, due to improperly rigged tail brace wires. It also notes that a frozen Front Center Beam may be a contributing factor. Broken front stabilizer spar tubes inside the attach fitting was also the subject of a Service Alert published by Phoenix Aircraft Company on 12/24/1988. 

Both the service bulletin by Great Lakes and the service alert by Phoenix Aircraft emphasize that the tail brace wire fitting attach bolt through the rear stabilizer spar should be free to move when the stabilizer trim is adjusted up and down.


Although previous known instances of stabilizer spar cracking and suggested inspections have been limited to the front spar, WACO Classic Aircraft considers it prudent to inspect both front and rear stabilizer spars and to ensure that both the front and rear center beams turn freely and are well lubricated. 

In addition, the known cases of cracking and failure have occurred in aircraft used in aerobatic flight, and because these aircraft are certificated in the Aerobatic category it must be assumed that they will be subjected to aerobatic maneuvers. For this reason, the FAA is requiring that this be a recurring inspection, unless the aircraft is fitted with the newly designed replacement parts. The AD is effective Jube 20th. Comments are due to the FAA by July 20th, 2012. (File photo)

FMI: AD

Advertisement

More News

Airborne 11.21.14: AEA's 3Q/14 Report, Fantasy Of Flight, Modernizing The NAS

Also: Holland Wants Gold, FAA Strangling UAVs?, RAF WWII Trainer For Sale, Bf109s Live, Georgia v Aerospace Engineers The Aircraft Electronics Association has released its third-qu>[...]

Aero-News: Quote Of The Day (11.23.14)

"Reaching this stage that we call ATLO is a critical milestone. This is a very satisfying point of the mission as we transition from many teams working on their individual elements>[...]

ANN FAQ: Getting The Most Out Of ANN's Newsletters

ANN goes through a lot of trouble to make the graphics flashy and cool and an integral part of the story. But let's face it, they're bandwidth-intensive. So here are a couple of th>[...]

Air Force Funds Research On Thermal Management Technology For Fighters

Heat Generated By Electronic Systems A Growing Challenge Managing heat that is generated by electronic subsystems in next-generation aircraft is a vexing challenge for aerospace sy>[...]

Raytheon Successfully Demonstrates Airborne Electronic Attack System

Prototype Test Flights Evaluate Integrated Electronic Warfare Capabilities The U.S. Navy and Raytheon successfully demonstrated an end to end, first of its kind, integrated electro>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2014 Web Development & Design by Pauli Systems, LC