Boeing Opens New P-8 Production Facility In Seattle | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.09.24

Airborne-Unlimited-04.10.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Wed, Nov 17, 2010

Boeing Opens New P-8 Production Facility In Seattle

Refurbished Space For Testing, Systems Installation

Boeing cut the ribbon on a new P-8 aircraft production facility near Boeing Field in Seattle late last week. The refurbished factory gives Boeing and its P-8 teammates the space they need to install mission systems and conduct tests on aircraft.


Boeing Photo

"The new factory is a great fit as Boeing transitions to building production aircraft, in part because it allows us to incorporate a leaner workflow," said Chuck Dabundo, Boeing vice president and P-8 program manager. "We’ll complete work on the P-8A Poseidon aircraft for the U.S. Navy and the P-8I aircraft for the Indian navy in this facility, and plan to use this space for future P-8 customers’ aircraft as well."

The U.S. Navy plans to purchase 117 P-8A anti-submarine warfare, anti-surface warfare, intelligence, surveillance and reconnaissance aircraft to replace its existing P-3 fleet. Initial operational capability is scheduled for 2013. The Indian Navy signed a contract for eight P-8I aircraft in January 2009. Boeing will deliver the first P-8I within 48 months of contract signing, and the remaining seven by 2015.


File Photo

Boeing Commercial Airplanes employees assemble the P-8 aircraft -- which are based on the company’s Next-Generation 737 commercial airplane -- in Renton, WA. Following final assembly, the P-8s make a short flight to Boeing Field. Inside the new facility, Defense, Space & Security employees will complete systems installation and testing prior to customer delivery.

Boeing is using a proven in-line production process to efficiently design and build the aircraft. All aircraft modifications unique to the P-8 are made in sequence during fabrication and assembly. Implementing established best practices and common, commercial production-system tools enables the team to reduce flow time and cost while ensuring quality. As part of the U.S. Navy System Development and Demonstration contract Boeing received in 2004, the team is building and testing six flight-test and two ground-test aircraft. The first three flight-test aircraft are completing testing at Naval Air Station Patuxent River, MD.

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Linx (04.13.24)

Aero Linx: Florida Antique Biplane Association "Biplanes.....outrageous fun since 1903." That quote really defines what the Florida Antique Biplane Association (FABA) is all about.>[...]

ANN's Daily Aero-Term (04.13.24): Beyond Visual Line Of Sight (BVLOS)

Beyond Visual Line Of Sight (BVLOS) The operation of a UAS beyond the visual capability of the flight crew members (i.e., remote pilot in command [RPIC], the person manipulating th>[...]

Airborne 04.09.24: SnF24!, Piper-DeltaHawk!, Fisher Update, Junkers

Also: ForeFlight Upgrades, Cicare USA, Vittorazi Engines, EarthX We have a number of late-breaking news highlights from the 2024 Innovation Preview... which was PACKED with real ne>[...]

Aero-News: Quote of the Day (04.14.24)

“For Montaer Aircraft it is a very prudent move to incorporate such reliable institution as Ocala Aviation, with the background of decades in training experience and aviation>[...]

ANN's Daily Aero-Term (04.14.24): Maximum Authorized Altitude

Maximum Authorized Altitude A published altitude representing the maximum usable altitude or flight level for an airspace structure or route segment. It is the highest altitude on >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC