FAA to Implement Las Vegas Metroplex Project | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Airborne Unlimited-Monday

Airborne Unmanned

Airborne Unlimited-Tuesday Airborne Special Edition Airborne Flight Training

Airborne Unlimited-
Friday

Airborne-ANN Airborne Unlimited--04.05.21 Airborne-Unmanned--04.06.20 Airborne Unlimited--04.07.21 Airborne Special Edition--04.01.21 Airborne-Flight Training--04.08.20 Airborne Unlimited--04.09.21

Airborne On YouTube

Airborne Unlimited--04.05.21

Airborne-Unmanned--04.06.20

Airborne Unlimited--04.07.21 Airborne Special Edition--04.01.21 Airborne-Flight Training--04.08.20

Airborne Unlimited--04.09.21

Mon, Feb 22, 2021

FAA to Implement Las Vegas Metroplex Project

FAA Will Implement The Las Vegas Metroplex Project On Feb. 25, 2021

The comprehensive project will use satellite navigation to move air traffic more safely and efficiently through the area. New routes for McCarran International Airport, Henderson Executive Airport, and North Las Vegas Airport will be more direct, automatically separated from each other and have efficient climb and descent profiles. It is one of 11 Metroplex projects nationwide.

Community involvement was a critical part of the project’s environmental process. The FAA conducted a thorough environmental review and extensive public engagement for the project, including 11 public workshops in 2017 and 2019.The agency also held four public comment periods totaling more than 120 days, and evaluated and responded to more than 140 comments.

After the FAA implements the new procedures, some flight track dispersion will continue to occur as it does today. Additionally, air traffic controllers will continue to sometimes direct aircraft off published routes for safety or efficiency or to reroute them around weather systems.

The FAA issued the Finding of No Significant Impact-Record of Decision (FONSI-ROD) for the Las Vegas Metroplex project in July 2020. The agency’s initial plan to implement the new routes in November 2020 was delayed by the COVID-19 public health emergency.

After issuing the FONSI-ROD, the FAA made minor adjustments to five procedures that are part of the project. The agency conducted a thorough review of the changes and confirmed they did not warrant a supplement to the final Environmental Assessment, consistent with FAA environmental policy. 

The Las Vegas Metroplex environmental website includes Google Earth features that enable the public to view historic and projected flight paths associated with the project, as well as the noise analysis the FAA conducted at more than 172,000 grid points throughout the projected General Study Area.

FMI: www.faa.gov

Advertisement

More News

Klyde Morris (04.05.21)

Klyde's Not Sure How This Carbon Credit Gig Works FMI: www.klydemorris.com>[...]

Aero-News: Quote of the Day (04.07.21)

“The Tuskegee Airmen are excited to be recognized with the presentation of the 2021 Clifford Henderson Trophy and to be a part of the long list of aviation pioneers recognize>[...]

Airborne 04.05.21: E-AB Flt Testing, NORAD v Tu142s, SnF Digital Daily!

Also: Citation 560XL #1000, Erickson & USFS, NC Airports Funded, KC-390 Refueling EAA has reported that the FAA has published draft guidance to implement an optional task-based>[...]

ANN's Daily Aero-Term (04.07.21): Downburst

Downburst A strong downdraft which induces an outburst of damaging winds on or near the ground. Damaging winds, either straight or curved, are highly divergent. The sizes of downbu>[...]

ANN's Daily Aero-Linx (04.07.21)

Aero Linx: Professional Aviation Safety Specialists (PASS) Since 1977, the Professional Aviation Safety Specialists (PASS) has represented more than 11,000 employees of the Federal>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2021 Web Development & Design by Pauli Systems, LC