FAA Issues Emergency AD For Some Pratt & Whitney Canada Engines | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, Sep 16, 2011

FAA Issues Emergency AD For Some Pratt & Whitney Canada Engines

Issues Found With Certain First Stage Reduction Sun Gears

The FAA has sent a notice of an emergency AD (2011-20-51) to owners and operators of Pratt & Whitney Canada PT6A-15AG, -27, -28, -34, -34AG, -34B, and -36 series turboprop engines.

The move was prompted by failures of certain first stage reduction sun gears, manufactured by Timken Alcor Aerospace Technologies, Inc. These gears are manufactured under a part manufacturer approval (PMA) as replacement parts for installation in propeller reduction gearbox assemblies of Pratt & Whitney Canada PT6A-15AG, -27, -28, -34, -34AG, -34B, and -36 series turboprop engines. About 80 of these sun gears are suspect for having a manufacturing anomaly. About half of the suspect sun gears have already been taken out of service. This condition, if not corrected, could result in failure of the shaft portion of the sun gear, which will result in an engine in-flight shut down, possible uncontained engine failure, aircraft damage, and serious injuries.

The AD was issued after the FAA evaluated of all the relevant information, and determined the unsafe condition described previously is likely to exist or develop in other products of the same type design. The FAA has found that the risk to the flying public justifies issuing this AD on an emergency basis.

The AD requires the removal of affected PMA replacement Timken Alcor Aerospace Technologies, Inc. first stage reduction sun gear and the interacting planet gears, from the propeller reduction gearbox assembly, within 15 operating hours or 15 days after receipt of this AD, whichever occurs first.

FMI: http://rgl.faa.gov/Regulatory_and_Guidance_Library/rgAD.nsf/0/994D43AAE16A4BF68625790C005F46A7?OpenDocument

Advertisement

More News

ANN's Daily Aero-Term (04.20.24): Light Gun

Light Gun A handheld directional light signaling device which emits a brilliant narrow beam of white, green, or red light as selected by the tower controller. The color and type of>[...]

Aero-News: Quote of the Day (04.20.24)

"The journey to this achievement started nearly a decade ago when a freshly commissioned Gentry, driven by a fascination with new technologies and a desire to contribute significan>[...]

ANN's Daily Aero-Linx (04.21.24)

Aero Linx: JAARS, Inc. For decades now, we’ve landed planes on narrow rivers and towering mountains. We’ve outfitted boats and vehicles to reach villages that rarely se>[...]

Aero-News: Quote of the Day (04.21.24)

"Our driven and innovative team of military and civilian Airmen delivers combat power daily, ensuring our nation is ready today and tomorrow." Source: General Duke Richardson, AFMC>[...]

ANN's Daily Aero-Term (04.21.24): Aircraft Conflict

Aircraft Conflict Predicted conflict, within EDST of two aircraft, or between aircraft and airspace. A Red alert is used for conflicts when the predicted minimum separation is 5 na>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC