1st P-8A Poseidon Production Aircraft Delivered To The Navy | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Monday

Tuesday

Wednesday

Thursday

Friday

Airborne On ANN

Airborne 03.02.15

Airborne 03.03.15

Airborne 03.04.15

Airborne 02.26.15

Airborne 02.27.15

Airborne Hi-Def On YouTube

Airborne 03.02.15

Airborne 03.03.15

Airborne 03.04.15

Airborne 02.26.15

Airborne 02.27.15

Thu, Mar 08, 2012

1st P-8A Poseidon Production Aircraft Delivered To The Navy

Aircraft Handed Over March 4 In Seattle, Flies To Jacksonville, FL

The first production P-8A Poseidon aircraft was handed over to the U.S. Navy in Seattle late last week. The P-8A is the first of 13 anti-submarine warfare, anti-surface warfare, intelligence, surveillance and reconnaissance aircraft Boeing will deliver as part of a low-rate initial production (LRIP) contract awarded in 2011.

“Delivering this capability to the warfighter is the ultimate goal and we’re proud to be able to meet our commitment and hand over the P-8A ‘keys’ to the Navy fleet,” said Chuck Dabundo, Boeing vice president and P-8 program manager. “This is a great day for Boeing, our supplier teammates and our Navy customer.”

“The Navy fleet is more than ready to receive the P-8A, which will provide the users and operators a step increase in mission capabilities,” said Rear Admiral Paul Grosklags, U.S. Navy Program Executive Officer for Air Anti-Submarine Warfare, Assault & Special Mission Programs. “Thanks to Boeing and the entire team for its efforts and great partnership to date.”
 
Following delivery in Seattle, Navy pilots flew the first production P-8A, LRIP1-1, to Naval Air Station Jacksonville, FL, where it will be used for aircrew training.
 
The Poseidon team is using a first-in-industry in-line production process that draws on Boeing’s Next-Generation 737 production system. All P-8A-unique aircraft modifications are made in sequence during fabrication and assembly. Along with production aircraft, the P-8A team also has built and is testing six flight-test and two ground-test aircraft. The flight-test aircraft are based at Naval Air Station Patuxent River, Md., and have completed more than 1,500 flight hours.
 
The Navy plans to purchase 117 Boeing 737-based P-8A aircraft to replace its P-3 fleet. Initial operational capability is planned for 2013. (US Navy Photo)

FMI: www.navy.mil, www.boeing.com

Advertisement

More News

Airborne 03.03.15: AW189 Certified, Honeywell Heli Forecast, HondaJet Sim

Also: NBAA Likes PBOR II, Wipaire Viking Endorsement, R44 Update, PW Engine Ctr, Twirly Birds Its going to be a great week for rotorcraft as HAI gets it start in Orlando, Florida..>[...]

Airborne 03.02.15: HeliExpo, UAL Pilot Warning, WWII Flyover, RAF Aids In WV

Also: Blue Angels, Fuel Taxes, Twirly Birds, Bell 429WG, Delta Selects GoGo It’s common for airlines to issue numerous safety notice to flight crews, but United Airlines issu>[...]

AeroSports Update: FAA Revising Flight Service Operation

GA Pilots Will See Changes In Services Provided By FAA Flight Service Because Of Increased Use Of Online Computer Services Recognizing a shift in users' preferences for automated s>[...]

ANN's Daily Aero-Linx (03.04.15)

SeatGuru.com Wanna get the low-down on airline seats and in-flight amenities that offers the best seat, legroom and reclining information? This is the spot.>[...]

ANN's Daily Aero-Term (03.04.15): HIWAS

Hazardous Inflight Weather Advisory Service (HIWAS).>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2015 Web Development & Design by Pauli Systems, LC