1st P-8A Poseidon Production Aircraft Delivered To The Navy | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Monday

Tuesday

Wednesday

Thursday

Friday

Airborne On ANN

Airborne 09.26.16

Airborne 09.27.16

Airborne 09.28.16

Airborne 09.29.16

Airborne 09.30.16

Airborne Hi-Def On YouTube

Airborne 09.26.16

Airborne 09.27.16

Airborne 09.28.16

Airborne 09.29.16

Airborne 09.30.16

Thu, Mar 08, 2012

1st P-8A Poseidon Production Aircraft Delivered To The Navy

Aircraft Handed Over March 4 In Seattle, Flies To Jacksonville, FL

The first production P-8A Poseidon aircraft was handed over to the U.S. Navy in Seattle late last week. The P-8A is the first of 13 anti-submarine warfare, anti-surface warfare, intelligence, surveillance and reconnaissance aircraft Boeing will deliver as part of a low-rate initial production (LRIP) contract awarded in 2011.

“Delivering this capability to the warfighter is the ultimate goal and we’re proud to be able to meet our commitment and hand over the P-8A ‘keys’ to the Navy fleet,” said Chuck Dabundo, Boeing vice president and P-8 program manager. “This is a great day for Boeing, our supplier teammates and our Navy customer.”

“The Navy fleet is more than ready to receive the P-8A, which will provide the users and operators a step increase in mission capabilities,” said Rear Admiral Paul Grosklags, U.S. Navy Program Executive Officer for Air Anti-Submarine Warfare, Assault & Special Mission Programs. “Thanks to Boeing and the entire team for its efforts and great partnership to date.”
 
Following delivery in Seattle, Navy pilots flew the first production P-8A, LRIP1-1, to Naval Air Station Jacksonville, FL, where it will be used for aircrew training.
 
The Poseidon team is using a first-in-industry in-line production process that draws on Boeing’s Next-Generation 737 production system. All P-8A-unique aircraft modifications are made in sequence during fabrication and assembly. Along with production aircraft, the P-8A team also has built and is testing six flight-test and two ground-test aircraft. The flight-test aircraft are based at Naval Air Station Patuxent River, Md., and have completed more than 1,500 flight hours.
 
The Navy plans to purchase 117 Boeing 737-based P-8A aircraft to replace its P-3 fleet. Initial operational capability is planned for 2013. (US Navy Photo)

FMI: www.navy.mil, www.boeing.com

Advertisement

More News

Airborne 09.29.16: SpaceX Raptor, FAA v KSMO, First A330neo

Also: ISU Plane Mess, Redbird-NBAA-Deland, 1st Inuit Female Pilot, NTSB on Reno, Rotorwash, Air Tanzania Q400s, Av-Appreciation It looks like the concept of presidential candidates>[...]

AD: Airbus Airplanes

AD NUMBER: 2016-18-07 PRODUCT: Certain Airbus Model A330-200 and -300 series airplanes; and Model A340-200 and -300 series airplanes.>[...]

AD: REIMS AVIATION S.A. Airplanes

AD NUMBER: 2016-19-15 PRODUCT: Certain REIMS AVIATION S.A. Model F406 airplanes.>[...]

Airborne 09.28.16: NEW DJI Mavic!, EAA's Next STC, Sean Tucker Honored

Also: LA Times v SMO, APS UAT Program, Gordon Bennett 2016, Tucson Control Tower, Hubble Find, Southwest Airlines, Iowa State Another new small unmanned aerial system is now on the>[...]

ANN's Daily Aero-Linx (09.30.16)

Airline Pilot Central AirlinePilotCentral.com (“APC”) launched in 2005 with the goal of providing comprehensive information for airline pilots.>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2016 Web Development & Design by Pauli Systems, LC