1st P-8A Poseidon Production Aircraft Delivered To The Navy | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** Airborne 09.29.14 ** HD iPad-Friendly -- Airborne 09.29.14**
** Airborne 09.26.14 ** HD iPad-Friendly -- Airborne 09.26.14 **
** Airborne 09.24.14 ** HD iPad-Friendly -- Airborne 09.24.14 **

Thu, Mar 08, 2012

1st P-8A Poseidon Production Aircraft Delivered To The Navy

Aircraft Handed Over March 4 In Seattle, Flies To Jacksonville, FL

The first production P-8A Poseidon aircraft was handed over to the U.S. Navy in Seattle late last week. The P-8A is the first of 13 anti-submarine warfare, anti-surface warfare, intelligence, surveillance and reconnaissance aircraft Boeing will deliver as part of a low-rate initial production (LRIP) contract awarded in 2011.

“Delivering this capability to the warfighter is the ultimate goal and we’re proud to be able to meet our commitment and hand over the P-8A ‘keys’ to the Navy fleet,” said Chuck Dabundo, Boeing vice president and P-8 program manager. “This is a great day for Boeing, our supplier teammates and our Navy customer.”

“The Navy fleet is more than ready to receive the P-8A, which will provide the users and operators a step increase in mission capabilities,” said Rear Admiral Paul Grosklags, U.S. Navy Program Executive Officer for Air Anti-Submarine Warfare, Assault & Special Mission Programs. “Thanks to Boeing and the entire team for its efforts and great partnership to date.”
 
Following delivery in Seattle, Navy pilots flew the first production P-8A, LRIP1-1, to Naval Air Station Jacksonville, FL, where it will be used for aircrew training.
 
The Poseidon team is using a first-in-industry in-line production process that draws on Boeing’s Next-Generation 737 production system. All P-8A-unique aircraft modifications are made in sequence during fabrication and assembly. Along with production aircraft, the P-8A team also has built and is testing six flight-test and two ground-test aircraft. The flight-test aircraft are based at Naval Air Station Patuxent River, Md., and have completed more than 1,500 flight hours.
 
The Navy plans to purchase 117 Boeing 737-based P-8A aircraft to replace its P-3 fleet. Initial operational capability is planned for 2013. (US Navy Photo)

FMI: www.navy.mil, www.boeing.com

Advertisement

More News

Airborne 09.29.14: Young Eagle Tragedy, Overdue Hoover Honors, Paperplane Record

Also: Low-Flying F16, UAVs For The Movie, Aerobatic Pilot Bails Out, Bombardier Safety Stand Down, MVP Takes On The World We are sad to report that a Young Eagle flight went down o>[...]

Airborne 09.29.14: Young Eagle Tragedy, Overdue Hoover Honors, Paperplane Record

Also: Low-Flying F16, UAVs For The Movie, Aerobatic Pilot Bails Out, Bombardier Safety Stand Down, MVP Takes On The World We are sad to report that a Young Eagle flight went down o>[...]

Airborne 09.26.14: A320neo First Flight, Aspen ESV Trial, Garmin Flies G5000

Also: Sea Lynx Grounding, AEA's Ric Peri On FAR 145, Union v Allegiant, Wingboarding--Anyone? Things went off as planned in Toulouse, France yesterday morning when the A320neo made>[...]

ANN's Daily Aero-Linx (09.30.14)

DOT Rule for Passengers Traveling with Lithium Batteries The issue has come to the forefront as more people may soon begin traveling with small UAVs, most of which are powered by t>[...]

ANN's Daily Aero-Term (09.30.14): Filed En Route Delay

Any of the following preplanned delays at points/areas along the route of flight which require special flight plan filing and handling techniques.>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2014 Web Development & Design by Pauli Systems, LC