1st P-8A Poseidon Production Aircraft Delivered To The Navy | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Most Recent Daily Airborne

Airborne On ANN

Airborne On YouTube/Hi-Def/Mac Friendly

Monday

Airborne 01.19.15

Airborne 01.19.15

Tuesday

Airborne 01.20.15

Airborne 01.20.15

Wednesday

Airborne 01.21.15

Airborne 01.21.15

Thursday

Airborne 01.22.15

Airborne 01.22.15

Friday

Airborne 01.23.15

Airborne 01.23.15

Thu, Mar 08, 2012

1st P-8A Poseidon Production Aircraft Delivered To The Navy

Aircraft Handed Over March 4 In Seattle, Flies To Jacksonville, FL

The first production P-8A Poseidon aircraft was handed over to the U.S. Navy in Seattle late last week. The P-8A is the first of 13 anti-submarine warfare, anti-surface warfare, intelligence, surveillance and reconnaissance aircraft Boeing will deliver as part of a low-rate initial production (LRIP) contract awarded in 2011.

“Delivering this capability to the warfighter is the ultimate goal and we’re proud to be able to meet our commitment and hand over the P-8A ‘keys’ to the Navy fleet,” said Chuck Dabundo, Boeing vice president and P-8 program manager. “This is a great day for Boeing, our supplier teammates and our Navy customer.”

“The Navy fleet is more than ready to receive the P-8A, which will provide the users and operators a step increase in mission capabilities,” said Rear Admiral Paul Grosklags, U.S. Navy Program Executive Officer for Air Anti-Submarine Warfare, Assault & Special Mission Programs. “Thanks to Boeing and the entire team for its efforts and great partnership to date.”
 
Following delivery in Seattle, Navy pilots flew the first production P-8A, LRIP1-1, to Naval Air Station Jacksonville, FL, where it will be used for aircrew training.
 
The Poseidon team is using a first-in-industry in-line production process that draws on Boeing’s Next-Generation 737 production system. All P-8A-unique aircraft modifications are made in sequence during fabrication and assembly. Along with production aircraft, the P-8A team also has built and is testing six flight-test and two ground-test aircraft. The flight-test aircraft are based at Naval Air Station Patuxent River, Md., and have completed more than 1,500 flight hours.
 
The Navy plans to purchase 117 Boeing 737-based P-8A aircraft to replace its P-3 fleet. Initial operational capability is planned for 2013. (US Navy Photo)

FMI: www.navy.mil, www.boeing.com

Advertisement

More News

Airborne 01.23.15: Google/SpaceX Bucks, Pet Aero-Rescue, Return of the P-3?

Also: Disruptive Innovation, V22 Ospreys, USAF Lets Bluebook Loose, Dawn and Ceres, FAASTeam Virtual Safety Stand Down As SpaceX’s Elon Musk pushes ahead on his development o>[...]

Airborne 01.23.15: Google/SpaceX Bucks, Pet Aero-Rescue, Return of the P-3?

Also: Disruptive Innovation, V22 Ospreys, USAF Lets Bluebook Loose, Dawn and Ceres, FAASTeam Virtual Safety Stand Down As SpaceX’s Elon Musk pushes ahead on his development o>[...]

Klyde Morris (01.26.15)

Klyde Finds Inspiration At Udvar-Hazy... FMI: www.klydemorris.com>[...]

AeroSports Update: The Two Eagles Are Headed Across The Pacific

Balloon Pilots Are In Flight For A More Than 6,000 Mile Journey To Cross The Pacific From West To East It was announced at the Albuquerque Balloon Fest last year that pilots Troy B>[...]

Aero-News: Quote Of The Day (01.26.15)

"'Unlawful use of an unmanned vehicle or aircraft to capture an image' would include: Sound waves; Thermal, infrared, ultraviolet, or visible light or other Electromagnetic waves; >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2015 Web Development & Design by Pauli Systems, LC