1st P-8A Poseidon Production Aircraft Delivered To The Navy | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** Airborne/NBAA2014 10.24.14 ** HD iPad-Friendly -- Airborne/NBAA2014 10.24.14 **
** Airborne/NBAA2014 10.22.14 ** HD iPad-Friendly -- Airborne/NBAA2014 10.22.14 **
** Airborne/NBAA2014 10.21.14 ** HD iPad-Friendly -- Airborne/NBAA2014 10.21.14 **
** Airborne/NBAA2014 10.20.14 ** HD iPad-Friendly -- Airborne/NBAA2014 10.20.14 **

Thu, Mar 08, 2012

1st P-8A Poseidon Production Aircraft Delivered To The Navy

Aircraft Handed Over March 4 In Seattle, Flies To Jacksonville, FL

The first production P-8A Poseidon aircraft was handed over to the U.S. Navy in Seattle late last week. The P-8A is the first of 13 anti-submarine warfare, anti-surface warfare, intelligence, surveillance and reconnaissance aircraft Boeing will deliver as part of a low-rate initial production (LRIP) contract awarded in 2011.

“Delivering this capability to the warfighter is the ultimate goal and we’re proud to be able to meet our commitment and hand over the P-8A ‘keys’ to the Navy fleet,” said Chuck Dabundo, Boeing vice president and P-8 program manager. “This is a great day for Boeing, our supplier teammates and our Navy customer.”

“The Navy fleet is more than ready to receive the P-8A, which will provide the users and operators a step increase in mission capabilities,” said Rear Admiral Paul Grosklags, U.S. Navy Program Executive Officer for Air Anti-Submarine Warfare, Assault & Special Mission Programs. “Thanks to Boeing and the entire team for its efforts and great partnership to date.”
 
Following delivery in Seattle, Navy pilots flew the first production P-8A, LRIP1-1, to Naval Air Station Jacksonville, FL, where it will be used for aircrew training.
 
The Poseidon team is using a first-in-industry in-line production process that draws on Boeing’s Next-Generation 737 production system. All P-8A-unique aircraft modifications are made in sequence during fabrication and assembly. Along with production aircraft, the P-8A team also has built and is testing six flight-test and two ground-test aircraft. The flight-test aircraft are based at Naval Air Station Patuxent River, Md., and have completed more than 1,500 flight hours.
 
The Navy plans to purchase 117 Boeing 737-based P-8A aircraft to replace its P-3 fleet. Initial operational capability is planned for 2013. (US Navy Photo)

FMI: www.navy.mil, www.boeing.com

Advertisement

More News

Airborne 10.24.14: AML's Innovations, NASA Preps For Mars, LightHawk Saves

Also: AW609 Pilots Honored, Airbus' VIP Cabin, FreeFlight's FTX-200, Quicksilver S-LSA Milestone During our visit this week to NBAA 2014, Jim Campbell had a chance to talk with Mar>[...]

Airborne at NBAA-10.22.14: Legacy 500, Universal InSight, BendixKing AeroWave

Also: GE Honda, Sagem's Active SideStick, Syberjet Update, Techno Aerospace Knows How to Party The FAA handed over certification papers for Embraer's Legacy 500 executive jet durin>[...]

Airborne 10.24.14: AML's Innovations, NASA Preps For Mars, LightHawk Saves

Also: AW609 Pilots Honored, Airbus' VIP Cabin, FreeFlight's FTX-200, Quicksilver S-LSA Milestone During our visit this week to NBAA 2014, Jim Campbell had a chance to talk with Mar>[...]

AD: Pacific Aerospace Limited Airplanes

AD NUMBER: 2014-21-02 PRODUCT: Pacific Aerospace Limited Model FU24-954 and FU24A-954 airplanes.>[...]

ANN's Daily Aero-Linx (10.25.14)

The Canard Zone An online forum by and for owners and builders of canard aircraft.>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2014 Web Development & Design by Pauli Systems, LC