Fire Scout Team Takes Steps To Arm Unmanned Helicopter | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** Airborne 08.29.14 ** HD iPad-Friendly -- Airborne 08.29.14 **
** Airborne 08.27.14 ** HD iPad-Friendly -- Airborne 08.27.14 **
** Airborne 08.25.14 ** HD iPad-Friendly -- Airborne 08.25.14 **

Sun, Mar 25, 2012

Fire Scout Team Takes Steps To Arm Unmanned Helicopter

Navy Requests Weaponized MQ-8B, First For The Service

The U.S. Navy for the first time has reqested that one of its unmanned aircraft be configured to carry weapons. The Navy plans to arm the MQ-8B Fire Scout with a laser-guided rocket, the Advanced Precision Kill Weapon System (APKWS), in just 18 months.

Typically, this type of development would take two to three years at a minimum, according to Jeremy Moore, Fire Scout weapons system integration lead. Arming the Fire Scout with a guided rocket will enable the fleet to engage hostile threats with the Fire Scout independent of air support from carrier or shore-based aircraft. This capability will keep the warfighter out of harm’s way, he said.

The Fire Scout team and NAVAIR’s structures rotary-wing division personnel conducted the first of a series of tests March 7 on the newly installed hardware, which will gauge how the system will operate in the shipboard environment.
 
“This is the very first weaponization program on this aircraft,” said Moore. Part of the Rapid Deployment Capability (RDC) acquisition process, “it was identified by the fleet as an urgent need for joint forces, so we are pressing forward as hard as we can to get it out there.”
 
Bill McCartney, Fire Scout’s Air Vehicle flight test lead, said the weaponization of any aircraft is an intricate process, particularly it in this case since it is the first time the Navy will arm an unmanned aircraft. “We had a very tight timeline to conduct trade studies and complete design reviews,” McCartney said. “Now, we are starting to execute tests, and there is little time in the schedule for repeats.”
 
The team planned this test event to get an early look at the new hardware design installed on the aircraft, allowing them to identify any issues before beginning ground and flight tests later this year. Ground and flight tests will be conducted by Naval Air Warfare Center’s Aircraft Division and Weapons Division personnel at Webster Field and China Lake, Calif., with support from NAVAIR, Naval Sea Systems Command and industry partners.
 
“This is the first stepping stone,” Moore said. “We are trying to build in the capability to add on additional weapons in the future.” (Photo provided by NAVAIR)

FMI: www.navy.mil

Advertisement

More News

Annual Oshkosh 2014 'Best/Worst Of' Award Selection Invites YOUR Participation!

YOU Can Contribute To The Annual List Compiled By The Staff and Readership of the ANN and Aero-TV! E-I-C Note: We're going to start naming names and dropping details THIS week--- t>[...]

Airborne 08.29.14: Google Drone!, Cessna's 10,000th, Bearhawk LODA

Also: Big Boeing Order, Napa Tower Quaked, Landsberg Retires, Galileo Falters Breaking News! Google has unveiled an exciting new UAV project, called Project Wing, which has been un>[...]

Aero-TV: The Tecnam Juggernaut -- SeaSky, P2008, P2010, Trainers, and Astore!

An Impressive Line-Up Continues To Make A Solid Impact On Sport Aviation ANN CEO and Editor-In-Chief, Jim Campbell seized the opportunity to talk with Phil Solomon, the CEO of Tecn>[...]

AD: Bombardier, Inc. Airplanes

AD NUMBER: 2014-17-04 PRODUCT: Certain Bombardier, Inc. Model CL-600-2B19 (Regional Jet Series 100 & 440) airplanes.>[...]

ANN's Daily Aero-Linx (09.02.14)

FAA General Aviation Airports Report Beginning in 2010, the FAA began a national review of the general aviation airports resulting in two reports, General Aviation Airports: A Nati>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2014 Web Development & Design by Pauli Systems, LC