FAA: 10 Years Is Shortest Wait For Longmont, CO Airport Funds | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Nov 29, 2011

FAA: 10 Years Is Shortest Wait For Longmont, CO Airport Funds

Airport Master Plan Calls For 1,000 Foot Runway Extension

The master plan for Vance Brand Municipal airport (KLMO) in Longmont, CO, calls for a 1,000 foot extension of the 4,800 foot runway, but FAA officials say that no money will be available for the project for at least 10 years.

Airport manager Tim Barth said the FAA has made it clear that funding for runway extensions at smaller airports is "not a high priority" on its funding list. In an e-mail to members of the Airport Advisory Board, Barth said while the information may "not be what the ... Board wanted to hear, it is nonetheless the FAA's official position," according to a report in the Longmont, CO Times-Call.

The position is music to the ears of area NIMBYs, which have been steadfastly against the extension. While proponents say safety is the primary concern, local residents counter with the argument that a longer runway would attract larger and noisier airplanes. It's a debate that occurs in nearly every community in which a runway extension is planned.

Barth said in his e-mail that the FAA acknowledged the need for the extension "in order to accommodate the existing fleet" of aircraft at KLMO, and that it would approve the master plan so that the improvements can be considered in the future. At 4,800 feet, only 77 percent of the category B2 aircraft flying can safely use the airport. The extension would open up the facility to 90 percent of the fleet. KLMO is currently considered a B2 airport, according to Barth.

FMI: www.ci.longmont.co.us/airport/board

Advertisement

More News

ANN's Daily Aero-Term (04.14.24): Maximum Authorized Altitude

Maximum Authorized Altitude A published altitude representing the maximum usable altitude or flight level for an airspace structure or route segment. It is the highest altitude on >[...]

ANN's Daily Aero-Linx (04.14.24)

Aero Linx: Soaring Safety Foundation (SSF) The Soaring Safety Foundation (SSF) is the Training and Safety arm of the Soaring Society of America (SSA). Our mission is to provide ins>[...]

Classic Aero-TV: 'We're Surviving'-- Kyle Franklin Describes Airshow Life 2013

From 2013 (YouTube Version): Dracula Lives On Through Kyle Franklin... and We're NOT Scared! ANN CEO and Editor-in-Chief, Jim Campbell speaks with Aerobatic and airshow master, Kyl>[...]

Aero-News: Quote of the Day (04.14.24)

“For Montaer Aircraft it is a very prudent move to incorporate such reliable institution as Ocala Aviation, with the background of decades in training experience and aviation>[...]

Airborne 04.09.24: SnF24!, Piper-DeltaHawk!, Fisher Update, Junkers

Also: ForeFlight Upgrades, Cicare USA, Vittorazi Engines, EarthX We have a number of late-breaking news highlights from the 2024 Innovation Preview... which was PACKED with real ne>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC