AD: Airbus Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Monday

Tuesday

Wednesday

Thursday

Friday

Airborne On ANN

Airborne 02.08.16

Airborne 02.09.16

Airborne 02.10.16

Airborne 02.11.16

Airborne 02.12.16

Airborne Hi-Def On YouTube

Airborne 02.08.16

Airborne 02.09.16

Airborne 02.10.16

Airborne 02.11.16

Airborne 02.12.16

Wed, May 09, 2012

AD: Airbus Airplanes

AD NUMBER: 2012-01-05

PRODUCT: Certain Airbus Model A300 B2-1C, B2K-3C, B2-203, B4-2C, B4-103, and B4-203 airplanes; and Model A300 B4-601, B4-603, B4-620, B4-622, B4-605R, B4-622R, and F4-605R airplanes.
SUBJECT: Airworthiness Directive 2012-01-05
ACTION: Final Rule

SUMMARY: The FAA Is superseding an existing airworthiness directive (AD) for certain Airbus Model A300 B2-1C, B2K-3C, B2-203, B4-2C, B4-103, and B4-203 airplanes; and Model A300 B4-601, B4-603, B4-620, B4-622, B4-605R, B4-622R, and F4-605R airplanes.

That AD currently requires repetitive inspections for cracking in Gear Rib 5 of the main landing gear (MLG) attachment fittings at the lower flange, and repair if necessary; and provides an optional spot-facing modification around certain fastener holes, which would terminate certain repetitive inspections. This new AD mandates the optional spot-facing modification. This AD was prompted by new cases of cracks discovered during scheduled maintenance checks.

The FAA Is issuing this AD to prevent cracking of the Gear Rib 5 right-hand and left-hand attachment fitting at the lower flanges of the MLG, which could result in failed bolts penetrating through the rear spar and into a fuel tank, consequent fuel loss, and reduced structural integrity of the airplane.

DATES: This AD becomes effective June 12, 2012.

FMI: AD

Advertisement

More News

House Science Committee Approves Aviation R&D Bill

Authorizes Funding For The FAA's Research, Engineering, And Development Account Through 2019 The Science, Space, and Technology Committee on Thursday approved the FAA Leadership in>[...]

Airborne 02.12.16: NEW Mooney!, Not-So-Good GAMA Stats, DA40 Upgrades

Also: A350-1000 Final Assembly, Barnstorming: ATC Privatization, Lithium Issue, Boeing Cuts, Tillamook C-27, Sywell Aerodrome, Massive Airship Mooney International Corporation unve>[...]

Airborne 02.11.16: Drone #s Increase, Fokker D. VIII Replica, Gulfstream G500

Also: Albania Auction, Aero-Community: AEA!, 500 F-35 Hours, SeaPort Airlines, Maxcraft Avionics, Air Power Museum, Webb Space Telescope FAA Administrator Michael Huerta told a UAV>[...]

Airborne 02.12.16: NEW Mooney!, Not-So-Good GAMA Stats, DA40 Upgrades

Also: A350-1000 Final Assembly, Barnstorming: ATC Privatization, Lithium Issue, Boeing Cuts, Tillamook C-27, Sywell Aerodrome, Massive Airship Mooney International Corporation unve>[...]

ANN FAQ: View Aero-News YOUR Way ... The 'Headlines And Teasers' Option

Choose How YOU Want To View Your Aero News: Headlines And Teasers We're all pretty excited about the new website design here at ANN, but we HAVE heard from some of you that you lik>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2016 Web Development & Design by Pauli Systems, LC