X-51A WaveRider Test Flight Set For Next Week | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date






Airborne On ANN

Airborne 11.23.15

Airborne 11.24.15

Airborne 11.25.15

Airborne 11.19.15

Airborne 11.20.15

Airborne Hi-Def On YouTube

Airborne 11.23.15

Airborne 11.24.15

Airborne 11.25.15

Airborne 11.19.15

Airborne 11.20.15

EAA/ANN AirVenture Innovation Preview

AIP-#1 Vimeo

AIP-#2 Vimeo

AIP-Part 1 YouTube

AIP-Part 2 YouTube

Fri, May 21, 2010

X-51A WaveRider Test Flight Set For Next Week

Only Hypersonic Test Flight Planned For This Fiscal Year

The X-51A WaveRider will make its first hypersonic flight test attempt from Edwards Air Force Base on Tuesday, May 25. The unmanned aerial vehicle will be released from a B-52 bomber off the southern California coast.

The X-51A is expected to fly autonomously for five minutes -- powered by a supersonic combustion ramjet (scramjet) motor -- accelerate to about Mach 6 and transmit large amounts of data to ground stations before it splashes down into the Pacific and breaks up, as planned. There are no plans to recover the flight test vehicle, one of four built.

"In those 300 seconds, we hope to learn more about hypersonic flight with a practical scramjet engine than all previous flight tests combined," said Charlie Brink, X-51A program manager with the Air Force Research Laboratory's Propulsion Directorate at Wright-Patterson Air Force Base. The longest previous hypersonic scramjet flight test, performed by a NASA X-43 in 2004, was faster, but lasted only about 10 seconds and used less logistically supportable hydrogen fuel.

The X-51A program is a collaborative effort of the Air Force Research Laboratory and the Defense Advanced Research Projects Agency, with industry partners The Boeing Company and Pratt & Whitney Rocketdyne.

The May 25 attempt will be the only hypersonic flight attempt this fiscal year, a change from the original test plan, which was to fly once in December 2009 and three more times in 2010. A combination of factors, including high demand for flight-test and range assets such as the B-52, contributed to the pause.

"This is an experimental X-plane and it's a complicated test. We knew the original schedule was aggressive and we would need to be flexible," said Brink. "It's also expensive to keep a staff of engineers and support staff at the ready and then not be able to fly when supporting assets aren’t available. So we elected to make only one hypersonic try this spring and then pause for a few months to conserve funding."

Alex Lopez, Boeing vice president of Advanced Network & Space Systems, said the X-51A program will pave the way to hypersonic weapons and future access to space.

FMI: www.af.mil, www.boeing.com


More News

Airborne 11.25.15: Blue Origin Reusable Rocket!, AMA Reacts, Transgender Pilots

Also: UK CAA, E-Fest 2015, Citizens In Space, Gulfstream G500, Dassault Falcon Jet, CFM LEAP-1A, Tuskegee's Milton Crenchaw ANN Airborne Link: /index.cfm?do=video.playVideo&vid>[...]

Aero-News: Quote Of The Day (11.29.15)

Aero-News Quote of the Day "Thales pioneered fly-by-wire technology almost 40 years ago, and we believe that Cessna’s confidence in us as we embark on this exciting next step>[...]

ANN's Daily Aero-Term (11.29.15): Inner Marker

Inner Marker A marker beacon used with an ILS (CAT II) precision approach located between the middle marker and the end of the ILS runway, transmitting a radiation pattern keyed at>[...]

ANN's Daily Aero-Linx (11.29.15)

Aero Linx: Mercy Airlift It is the Mission of Mercy Airlift to provide humanitarian aid on a nondiscriminatory and impartial basis to the victims of natural and man made disasters >[...]

Swedavia Selects Lockheed Martin To Deliver Next Generation Systems

Will Share Data Among 10 Airport Network In Sweden Swedish Airport Operator Swedavia has selected Lockheed Martin to deliver a new generation of multi-airport operational systems t>[...]

blog comments powered by Disqus





© 2007 - 2015 Web Development & Design by Pauli Systems, LC